ML20058L854: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[2CAN089008, Voluntary Rept 50-368/90-V01-00:revises Completion Date for Commitment Date in Voluntary Rept from 900801 to 900831 Re Inadvertent Starting of Emergency Diesel Generator While Attempting to Air Roll Engine During Maint]]
| number = ML20058L854
| issue date = 08/03/1990
| title = Voluntary Rept 50-368/90-V01-00:revises Completion Date for Commitment Date in Voluntary Rept from 900801 to 900831 Re Inadvertent Starting of Emergency Diesel Generator While Attempting to Air Roll Engine During Maint
| author name = Ewing E
| author affiliation = ENTERGY OPERATIONS, INC.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000368
| license number =
| contact person =
| document report number = 2CAN089008, 2CAN89008, NUDOCS 9008080230
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 2
}}
 
=Text=
{{#Wiki_filter:r      r p          '
j
                                      'fd -
j t._,)                lg{                                                            Ent:rgy Oper;tions In),
i,            '*;,      ""                                  .
Rede 3.00x 137G p
M        QS-                                          fteseHA AR 72801 Tel 50134-3100 t
1 August 3, 1990                                                                          l r2CAN089008                                                                              ~L U. S. Nuclear Regulatory Commission                                                      ,
Document Control Desk-Mail. Station P1-137 Washington, D. C. 20555
                                            'SVBJECT: Arkansas Nuclear One - Unit 2                                                    i Docket No. 50-368 License No. NPF-6 Voluntary Report 50-368/90-V01-00 Gentlemen:
As' discussed with Mr. Tom Westerman of NRC Region IV staff, this letter is being submitted to revise the completion 6 ate for a commitment made in Voluntary Report 50-368/90-V01-00 (2CAN049013).                                          ,
1 4
                                            ;This voluntary report concerned the inadvertent starting of an Emergency Diesel Generator (EDG) while attempting to " air roll" the engine during maintenance with its DC control power deenergized.                                      ,
                                            . Corrective-actions for this event included revising the ANO-2 EDG operating procedure'to preclude future similar occurrences. This revision was
                                                                                                                                      )
expected to be completed by August 1, 1990. However, this completion date-            A could not be met due to the complexity of the revision, which also contains changes which resulted.from alarm circuit delay time evaluations, diesel room exhaust fan testing, undervoltage relay testing, and Inservice Test
                                            . Program changes. Therefore, its expected completion date has been extended to~ August 31, 1990.
There are. no safety concerns created by the delay in implementation' of. this procedure revision since the additional corrective actions discussed in the              ,
s
                                            . voluntary report have been completed, and should prevent the occurrence of            .'
similar events.                                                                          ,
1 n                                                      '
                            -9008080230 900803                                                                          /        .
1 I
                            -{DR; ADocK0500g8 a
l i, .                                                                                                                    l
 
p,                  m
          ''d                                                                                      .
1
                  'U.cS. NRC-                                                                    ~
iPage 2
                  - August .3,1990 -
i
                                                                                                ')
i l.
                  'If you should have any further. questions,' please call Mr. James Fisicaro at l(501) 964-3228.                                                                ;
t
                  'Very truly yours, E. C. Ewing General Manager,                                                              s Assessment ECE/RHS/sgw                                                                  ;
cc:-        Regional Administrator Region IV                                                        !
U. S'.: Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000                                  ;
Arlington, TX 76011.
INPO Records Center Suite'1500 1100 Circle,~75 Parkway                                          '
Atlanta, GAL 30339-3064                                        .,
i; L
i 1}}

Latest revision as of 07:01, 3 June 2023