ML20058M729: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20058M729 | | number = ML20058M729 | ||
| issue date = 09/28/1993 | | issue date = 09/28/1993 | ||
| title = Forwards Rev 1 to COLR for Vogtle Electric Generating Plant Unit 1 Cycle 5 | | title = Forwards Rev 1 to COLR for Vogtle Electric Generating Plant Unit 1 Cycle 5 | ||
| author name = Mccoy C | | author name = Mccoy C | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Georg a Poser Comomiy | {{#Wiki_filter:Georg a Poser Comomiy 40 invemen Center Preof | ||
= | |||
40 invemen Center Preof | Pmt 0"ce Box 1295 8;'fr,r:rg":am. Atid,a'na 35201 Ieteph0'ie 205 877 7122 L | ||
Georgia Power C. K. tA Coy vc.,p, vo m t m. | |||
VO;; tie If DjeC! | |||
N SDufht5n 04Ef'iC Eys?cm LCV-0160 Docket Nos. 50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen: | |||
VO;; tie If DjeC! | VOGTLE ELECTRIC GENERATING PLANT l | ||
VOGTLE ELECTRIC GENERATING PLANT | CORE OPERATING LIMITS REPORT In accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby submits the enclosed revision to figures 1 and 2 of the Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant - Unit 1 Cycle 5. | ||
Please contact this office if you have any questions. | Please contact this office if you have any questions. | ||
Sincerely, C. K. McCoy CKM/HWM/gmb Enclosure cc: Georgia Power Company Mr. J. B. Beasley, Jr. | Sincerely, C. K. McCoy CKM/HWM/gmb Enclosure cc: Georgia Power Company Mr. J. B. Beasley, Jr. | ||
Mr. M. Sheibani NORMS U. S. Nucigar Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 06004y | Mr. M. Sheibani NORMS U. S. Nucigar Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 06004y | ||
9310060363 930928 | [,( | ||
9310060363 930928 | |||
<I I | |||
PDR ADOCK 05000424 I P | |||
PDR | |||
%}} | |||
Latest revision as of 08:00, 17 December 2024
| ML20058M729 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/28/1993 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20058M731 | List: |
| References | |
| NUDOCS 9310060363 | |
| Download: ML20058M729 (1) | |
Text
Georg a Poser Comomiy 40 invemen Center Preof
=
Pmt 0"ce Box 1295 8;'fr,r:rg":am. Atid,a'na 35201 Ieteph0'ie 205 877 7122 L
Georgia Power C. K. tA Coy vc.,p, vo m t m.
VO;; tie If DjeC!
N SDufht5n 04Ef'iC Eys?cm LCV-0160 Docket Nos. 50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT l
CORE OPERATING LIMITS REPORT In accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby submits the enclosed revision to figures 1 and 2 of the Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant - Unit 1 Cycle 5.
Please contact this office if you have any questions.
Sincerely, C. K. McCoy CKM/HWM/gmb Enclosure cc: Georgia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nucigar Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 06004y
[,(
9310060363 930928
<I I
PDR ADOCK 05000424 I P
%