{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Gentlemen:
Docket No.
In the Matter of Tennessee Valley Authority 50-390 WATTS BAR NUCLEAR PLANT (WBN)
JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.
If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P.
L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:
See page 2 Prmted o, recycded paper
) )
 
U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303
 
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
 
OPERATING DATA REPORT Doc Unit Dat Con Tele Rep
: 1.
2 ket No.
50-390 Name:
WBN Unit 1 February 5, 2003 npleted By-P. P. Salkeld phone.
(423) 365-3635 orting Period:
January 2003 Design Electrical Rating (MWe-Net):
Maximum Dependable Capacity (MWe-Net):
: 3. Number of Hours Reactor was Critical
: 4.
Hours Generator On-Line
: 5. Unit Reserve Shutdown Hours
: 6.
Net Electrical Energy Generated (M'Wh)
Month 744 744 00 874381 Year-to-Date Cumulative 744 53909.5 744 53644.2 0.0 0.0 874381 59340449 E-2 1155 1125
 
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 February 5, 2003 P. P. Salkeld (423) 365-3635
'F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
Summary:
The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.
E-3 REPORT PERIOD: Januar 2003 No.
Date Type' Duration Reason2 Method Licensee System
--,Component Cause and Corrective Action to*,
,(Hour)
.of Event Codeode 4
Prevent Recurrence Shutting Report No.
Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January.}}

Latest revision as of 12:29, 16 January 2025

January 2003 Monthly Operating Report for Watts Bar Nuclear Plant
ML030440078
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/10/2003
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030440078 (5)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 FEB j 0 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555 Gentlemen:

Docket No.

In the Matter of Tennessee Valley Authority 50-390 WATTS BAR NUCLEAR PLANT (WBN)

JANUARY 2003 MONTHLY OPERATING REPORT Enclosed is the January 2003 Monthly Operating Report as required by WBN Technical Specification Section 5.9.4.

If you have any questions concerning this matter, please call me at (423) 365-1824.

Sincerely, P.

L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc:

See page 2 Prmted o, recycded paper

) )

U.S. Nuclear Regulatory Commission Page 2 FEB 1 0 2003 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. Kahtan N.

Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Doc Unit Dat Con Tele Rep

1.

2 ket No.

50-390 Name:

WBN Unit 1 February 5, 2003 npleted By-P. P. Salkeld phone.

(423) 365-3635 orting Period:

January 2003 Design Electrical Rating (MWe-Net):

Maximum Dependable Capacity (MWe-Net):

3. Number of Hours Reactor was Critical
4.

Hours Generator On-Line

5. Unit Reserve Shutdown Hours
6.

Net Electrical Energy Generated (M'Wh)

Month 744 744 00 874381 Year-to-Date Cumulative 744 53909.5 744 53644.2 0.0 0.0 874381 59340449 E-2 1155 1125

UNIT SHUTDOWNS DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-390 WBN-1 February 5, 2003 P. P. Salkeld (423) 365-3635

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

Summary:

The unit operated at or near 100% power for the entire month of January. There were no challenges to the pressurizer power operated relief valves or pressurizer safety valves during the month.

E-3 REPORT PERIOD: Januar 2003 No.

Date Type' Duration Reason2 Method Licensee System

--,Component Cause and Corrective Action to*,

,(Hour)

.of Event Codeode 4

Prevent Recurrence Shutting Report No.

Down None N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100% power for the entire month of January.