NRC 2003-0044, Security Plan Revisions: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:N Committed to Nuclear Excellen                                               Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0044                                                             10 CFR 50.54(p)
{{#Wiki_filter:N Committed to Nuclear Excellen Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0044 10 CFR 50.54(p)
May 19, 2003 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington DC 20555 Ladies/Gentlemen:
May 19, 2003 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington DC 20555 Ladies/Gentlemen:
DOCKETS 50-266 AND 50-301 SECURITY PLAN REVISIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are revisions to the Point Beach Nuclear Plant Security and Safeguards Contingency Plan (SSCP). Also enclosed is an evaluation and description of the Plan revisions to assist in your review.
DOCKETS 50-266 AND 50-301 SECURITY PLAN REVISIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are revisions to the Point Beach Nuclear Plant Security and Safeguards Contingency Plan (SSCP). Also enclosed is an evaluation and description of the Plan revisions to assist in your review.
Questions regarding this submittal should be referred to Mr. Mark Fendl, Kewaunee/Point Beach Security Manager, at 920/755-6716.
Questions regarding this submittal should be referred to Mr. Mark Fendl, Kewaunee/Point Beach Security Manager, at 920/755-6716.
Since ly A..         a@
Since ly A..
Site       iPe       t AJC/ !d Enclosures cc:       NRC Resident Inspector (wo/e)
a@
Site iPe t
AJC/ !d Enclosures cc:
NRC Resident Inspector (wo/e)
NRC Project Manager (wo/e)
NRC Project Manager (wo/e)
NRC Region III (w/e)
NRC Region III (w/e)
THE SUBJECT MATTER OF THE ENCLOSURE TO THIS LETTER IS SAFEGUARDS INFORMATION AND IS CONSIDERED TO BE EXEMPT FROM DISCLOSURE IN ACCORDANCE WITH 10 CFR PARTS 2 50, 70 AND 73.
THE SUBJECT MATTER OF THE ENCLOSURE TO THIS LETTER IS SAFEGUARDS INFORMATION AND IS CONSIDERED TO BE EXEMPT FROM DISCLOSURE IN ACCORDANCE WITH 10 CFR PARTS 2 50, 70 AND 73.
WHEN SEPARATED, THIS PAGE IS NOT SAFEGUARDS INFORMATION.
WHEN SEPARATED, THIS PAGE IS NOT SAFEGUARDS INFORMATION.
6590-MulearoWT on         ivers7sco5s.3 n Telephone: 920.755.2321                                         1}}
6590-MulearoWT on ivers7 sco5s.3 n Telephone: 920.755.2321 1}}

Latest revision as of 09:39, 16 January 2025

Security Plan Revisions
ML031480548
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/19/2003
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2003-0044
Download: ML031480548 (1)


Text

N Committed to Nuclear Excellen Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0044 10 CFR 50.54(p)

May 19, 2003 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington DC 20555 Ladies/Gentlemen:

DOCKETS 50-266 AND 50-301 SECURITY PLAN REVISIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are revisions to the Point Beach Nuclear Plant Security and Safeguards Contingency Plan (SSCP). Also enclosed is an evaluation and description of the Plan revisions to assist in your review.

Questions regarding this submittal should be referred to Mr. Mark Fendl, Kewaunee/Point Beach Security Manager, at 920/755-6716.

Since ly A..

a@

Site iPe t

AJC/ !d Enclosures cc:

NRC Resident Inspector (wo/e)

NRC Project Manager (wo/e)

NRC Region III (w/e)

THE SUBJECT MATTER OF THE ENCLOSURE TO THIS LETTER IS SAFEGUARDS INFORMATION AND IS CONSIDERED TO BE EXEMPT FROM DISCLOSURE IN ACCORDANCE WITH 10 CFR PARTS 2 50, 70 AND 73.

WHEN SEPARATED, THIS PAGE IS NOT SAFEGUARDS INFORMATION.

6590-MulearoWT on ivers7 sco5s.3 n Telephone: 920.755.2321 1