{{#Wiki_filter:NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-RO1
{{#Wiki_filter:NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-COO-RO1


==Title:==
==Title:==
Determine if Channel Check Criteria is Met Examinee:
Determine if Channel Check Criteria is Met Examinee:
Evaluator:
Evaluator:
Print                       Signature           Date Results:         Sat                   Unsat               Total Time:       minutes Comments:       Designed for RO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels Alternate Path:   Yes             X             No Time Critical:   Yes                           No             X Time Allotment:   10 minutes Critical Steps:   1, 2 Job Designation: RO K/A:             G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels Alternate Path:
Rating:           4.4 AUTHOR:                        DAVID BURNS                      DATE:    01/24/2008 REV. 0
Yes X
No Time Critical:
Yes No X
Time Allotment:
10 minutes Critical Steps:
1, 2 Job Designation:
RO K/A:
G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Rating:
4.4  


JPM TITLE:     DETERMINE IF CHANNEL CHECK               JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels Initial Conditions:   Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 INSTRUCTOR WORKSHEET ML082830905.DOC Page 2 of 6 REV. 0 Directions:
Initiating Cue:       The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria. Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Task Standard:         DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on the student handout.
Required Materials:
ML082830905.DOC                            Page 2 of 6                                    REV. 0
OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels Initial Conditions:
Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
Initiating Cue:
The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria. Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Task Standard:
DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on the student handout.  


JPM TITLE:   DETERMINE IF CHANNEL CHECK                     JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                       Expected Operator Actions
DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 INSTRUCTOR WORKSHEET
**   1. Identify LI-519 does not meet the             2.1 Identifies the following channel as not CHANNEL CHECK criteria.                            meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.
* Denotes an entry required on the JPM cover sheet.
* LI-519 Step was: Sat: ______ Unsat _______*
** Denotes a Critical Step.
**   2. Identify LI-538 does not meet the             2.1 Identifies the following channel as not CHANNEL CHECK criteria.                            meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.
ML082830905.DOC Page 3 of 6 REV. 0 Start Time:
* LI-538 Step was: Sat: ______ Unsat _______*
Step Expected Operator Actions  
** 1.
Identify LI-519 does not meet the CHANNEL CHECK criteria.
2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.
LI-519 Step was: Sat: ______ Unsat _______*  
** 2.
Identify LI-538 does not meet the CHANNEL CHECK criteria.
2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.
LI-538 Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                                Page 3 of 6                                      REV. 0


JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE CUE SHEET ML082830905.DOC Page 4 of 6 REV. 0 Initial Conditions:
Initiating Cue:     The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
Initiating Cue:
The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Channel         Met     Not Met                   Channel           Met       Not Met LI-517                                               LI-537 LI-518                                               LI-538 LI-519                                               LI-539 LI-527                                               LI-547 LI-528                                               LI-548 LI-529                                               LI-549 ML082830905.DOC                        Page 4 of 6                                REV. 0
Channel Met Not Met Channel Met Not Met LI-517 LI-537 LI-518 LI-538 LI-519 LI-539 LI-527 LI-547 LI-528 LI-548 LI-529 LI-549  


JPM
JPM


==Title:==
==Title:==
DETERMINE IF CHANNEL CHECK                   JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 5 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 5 of 6                          REV. 0


JPM
JPM


==Title:==
==Title:==
DETERMINE IF CHANNEL CHECK                   JPM NUMBER: NRCADM061-COO-RO1 CRITERIA IS MET ANSWER KEY Initial Conditions:   Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 ANSWER KEY ML082830905.DOC Page 6 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.
Initiating Cue:
The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.
Channel         Met       Not Met                   Channel           Met       Not Met LI-517           X                                     LI-537           X LI-518           X                                     LI-538                       X LI-519                       X                       LI-539           X LI-527           X                                     LI-547           X LI-528           X                                     LI-548           X LI-529           X                                     LI-549           X ML082830905.DOC                          Page 6 of 6                                REV. 0
Channel Met Not Met Channel Met Not Met LI-517 X
LI-537 X
LI-518 X
LI-538 X
LI-519 X
LI-539 X
LI-527 X
LI-547 X
LI-528 X
LI-548 X
LI-529 X
LI-549 X  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-RO2
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-COO-RO2


==Title:==
==Title:==
Application of Overtime Restrictions Examinee:
Application of Overtime Restrictions Examinee:
Evaluator:
Evaluator:
Print                       Signature               Date Results:         Sat                   Unsat             Total Time:             minutes Comments:       Designed for RO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:   Yes             X             No Time Critical:   Yes                           No               X Time Allotment:   10 minutes Critical Steps:   2, 3 Job Designation: RO K/A:             G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:
Rating:           2.9 AUTHOR:                        DAVID BURNS                      DATE:        01/24/2008 REV. 0
Yes X
No Time Critical:
Yes No X
Time Allotment:
10 minutes Critical Steps:
2, 3 Job Designation:
RO K/A:
G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
Rating:
2.9  


JPM TITLE:     APPLICATION OF OVERTIME                 JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:   Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR WORKSHEET ML082830905.DOC Page 8 of 6 REV. 0 Directions:
Initiating Cue:       The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:
OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:
Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
Initiating Cue:
The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Task Standard:         DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the student handout.
Task Standard:
ML082830905.DOC                            Page 8 of 6                                    REV. 0
DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the student handout.  


JPM TITLE:   APPLICATION OF OVERTIME                         JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                       Expected Operator Actions
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR WORKSHEET
: 1. Identifies that the 16 hour limits are         1.1 Identifies that following limits do not apply.
* Denotes an entry required on the JPM cover sheet.
not exceeded.
** Denotes a Critical Step.
* 16 consecutive hours.
ML082830905.DOC Page 9 of 6 REV. 0 Start Time:
* 16 hours in 24 hours.
Step Expected Operator Actions
: 1.
Identifies that the 16 hour limits are not exceeded.
1.1 Identifies that following limits do not apply.
16 consecutive hours.
16 hours in 24 hours.
Note: Turnover time is not counted as actual time worked.
Note: Turnover time is not counted as actual time worked.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
**   2. Identifies that the 24 hour limit is           2.1 Identifies that the following limit was exceeded.                                          exceeded.
** 2.
* 24 hours in 48 hours Note: This limit was exceeded after working on Wednesday and again on Thursday.
Identifies that the 24 hour limit is exceeded.
2.1 Identifies that the following limit was exceeded.
24 hours in 48 hours Note: This limit was exceeded after working on Wednesday and again on Thursday.
(ONLY ONE IS REQUIRED)
(ONLY ONE IS REQUIRED)
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
**   3. Identifies that the 72 hour limit is           2.1 Identifies that following limit was exceeded.
** 3.
exceeded.
Identifies that the 72 hour limit is exceeded.
* 72 hours in 7 days.
2.1 Identifies that following limit was exceeded.
72 hours in 7 days.
Note: This limit was exceeded after working on Sunday, 73 hours total.
Note: This limit was exceeded after working on Sunday, 73 hours total.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                   (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                                Page 9 of 6                                        REV. 0


JPM NUMBER: NRCADM061-COO-RO2 EXAMINEE CUE SHEET Initial Conditions:   Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
JPM NUMBER: NRCADM061-COO-RO2 EXAMINEE CUE SHEET ML082830905.DOC Page 10 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
Initiating Cue:
The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Previous Work Schedule:
Previous Work Schedule:
Day             Number of Hours           Turnover Time               Position Worked                  (Hours)
Day Number of Hours Worked Turnover Time (Hours)
Sunday                     0                       0                       OFF Monday                   12                       1                   U1 BOPCO Tuesday                   12                       0.5                 U1 BOPCO Wednesday                   13                       0.5                 U1 BOPCO Thursday                   12                       1                   U1 BOPCO Friday                   12                       0                     U1 CO Saturday                   0                       0                       OFF Sunday                   12                       0                     U1 CO Monday                     0                       0                       OFF Today                   12                       0                     U1 CO Overtime Restrictions Violated:
Position Sunday 0
ML082830905.DOC                          Page 10 of 6                                    REV. 0
0 OFF Monday 12 1
U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1
U1 BOPCO Friday 12 0
U1 CO Saturday 0
0 OFF Sunday 12 0
U1 CO Monday 0
0 OFF Today 12 0
U1 CO Overtime Restrictions Violated:  


JPM
JPM


==Title:==
==Title:==
APPLICATION OF OVERTIME                     JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 11 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 11 of 6                          REV. 0


JPM
JPM


==Title:==
==Title:==
APPLICATION OF OVERTIME                   JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Initial Conditions:   Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ANSWER KEY ML082830905.DOC Page 12 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.
Initiating Cue:
ML082830905.DOC                          Page 12 of 6                                  REV. 0
The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.
You are currently scheduled to work 12 hours today, as the Unit 1 Control Operator.  


JPM
JPM


==Title:==
==Title:==
APPLICATION OF OVERTIME                     JPM NUMBER: NRCADM061-COO-RO2 RESTRICTIONS ANSWER KEY Previous Work Schedule:
APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ANSWER KEY ML082830905.DOC Page 13 of 6 REV. 0 Previous Work Schedule:
Day             Number of Hours           Turnover Time         Position Worked                  (Hours)
Day Number of Hours Worked Turnover Time (Hours)
Sunday                     0                       0                 OFF Monday                     12                       1             U1 BOPCO Tuesday                     12                       0.5             U1 BOPCO Wednesday                   13                       0.5             U1 BOPCO Thursday                   12                       1             U1 BOPCO Friday                     12                       0               U1 CO Saturday                     0                       0                 OFF Sunday                     12                       0               U1 CO Monday                     0                       0                 OFF Today                     12                       0               U1 CO Overtime Restrictions Violated:
Position Sunday 0
24 hours in 48 hours on Wednesday and Thursday. (Only one is required) 72 hours in 7 days on Sunday. (73 hours total)
0 OFF Monday 12 1
ML082830905.DOC                            Page 13 of 6                            REV. 0
U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1
U1 BOPCO Friday 12 0
U1 CO Saturday 0
0 OFF Sunday 12 0
U1 CO Monday 0
0 OFF Today 12 0
U1 CO Overtime Restrictions Violated:
24 hours in 48 hours on Wednesday and Thursday. (Only one is required) 72 hours in 7 days on Sunday. (73 hours total)  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EC-RO
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-EC-RO


==Title:==
==Title:==
Determine Clearance Points and Tagging Requirements Examinee:
Determine Clearance Points and Tagging Requirements Examinee:
Evaluator:
Evaluator:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:       minutes Comments:       Designed for RO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Alternate Path:   Yes                         No             X Time Critical:   Yes                         No             X Time Allotment:   20 minutes Critical Steps:   1, 2, 3 Job Designation: RO K/A:             G 2.2.13; Knowledge of tagging and clearance procedures.
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Alternate Path:
Rating:           4.1 AUTHOR:                        DAVID BURNS                    DATE:    01/24/2008 REV. 0
Yes No X
Time Critical:
Yes No X
Time Allotment:
20 minutes Critical Steps:
1, 2, 3 Job Designation:
RO K/A:
G 2.2.13; Knowledge of tagging and clearance procedures.
Rating:
4.1  


JPM TITLE:     DETERMINE CLEARANCE POINTS               JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR WORKSHEET ML082830905.DOC Page 15 of 6 REV. 0 Directions:
Initiating Cue:       The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Task Standard:         DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
Required Materials:
ML082830905.DOC                            Page 15 of 6                                    REV. 0
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions:
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Initiating Cue:
The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
Task Standard:
DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.  


JPM TITLE:     DETERMINE CLEARANCE POINTS                     JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                         Expected Operator Actions
DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR WORKSHEET
**   1. Identify breaker required to be re-             2.1 Identifies the following breakers to be positioned for isolation of power to                OPENED:
* Denotes an entry required on the JPM cover sheet.
SCWP 1-1.
** Denotes a Critical Step.
* 52-11D-05 (motor)
ML082830905.DOC Page 16 of 6 REV. 0 Start Time:
Step Expected Operator Actions  
** 1.
Identify breaker required to be re-positioned for isolation of power to SCWP 1-1.
2.1 Identifies the following breakers to be OPENED:
52-11D-05 (motor)
NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).
NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).
1.2 Identifies that a DANGER tag should be used for this component.
1.2 Identifies that a DANGER tag should be used for this component.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
: 2. Identify valves required to be closed           2.1 Identifies the following valves CLOSED:
** 2.
to isolate SCWP 1-1.
Identify valves required to be closed to isolate SCWP 1-1.
* SCW-1-9 discharge valve
2.1 Identifies the following valves CLOSED:
* SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.
SCW-1-9 discharge valve SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
: 3. Identify valves required to be                 3.1 Identifies the following valves OPEN.
** 3.
opened to drain and vent SCWP 1-1.
Identify valves required to be opened to drain and vent SCWP 1-1.
* SCW-1-3 pump suction drain
3.1 Identifies the following valves OPEN.
* SCW-1-5 pump casing vent
SCW-1-3 pump suction drain SCW-1-5 pump casing vent SCW-1-7 pump discharge drain SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.
* SCW-1-7 pump discharge drain
* SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.
3.2 Identifies that a CAUTION Tag should be used for these components.
3.2 Identifies that a CAUTION Tag should be used for these components.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                   (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                                Page 16 of 6                                      REV. 0


JPM NUMBER: NRCADM061-EC-RO EXAMINEE CUE SHEET Initial Conditions: Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
JPM NUMBER: NRCADM061-EC-RO EXAMINEE CUE SHEET ML082830905.DOC Page 17 of 6 REV. 0 Initial Conditions:
Initiating Cue:     The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
CLEARANCE                 DESCRIPTION                     CLEARED               TAGGING POINT                                                  POSITION        REQUIREMENT ML082830905.DOC                        Page 17 of 6                                    REV. 0
Initiating Cue:
The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT  


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                 JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 18 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 18 of 6                        REV. 0


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                   JPM NUMBER: NRCADM061-EC-RO ANSWER KEY Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY ML082830905.DOC Page 19 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
ML082830905.DOC                          Page 19 of 6                                    REV. 0
Initiating Cue:
The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.  


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                 JPM NUMBER: NRCADM061-EC-RO ANSWER KEY CLEARANCE                 DESCRIPTION                   CLEARED             TAGGING POINT                                                POSITION          REQUIREMENT SCW PP-1-1     Control Switch                               OFF             Control Board Caution*
Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY ML082830905.DOC Page 20 of 6 REV. 0 CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF Control Board Caution*
52-11D-05     SCW Pump 1-1 480 v Supply                   OPEN             DANGER SCW-1-9     SCW Pump 1-1 Discharge Valve             CLOSED             DANGER SCW-1-1     SCW Pump 1-1 Suction Valve               CLOSED             DANGER SCW 1-3     SCW Pump 1-1 Suction Drain Valve           OPEN             CAUTION SCW 1-5     SCW Pump 1-1 Casing Vent Valve             OPEN             CAUTION SCW-1-7     SCW Pump 1-1 Discharge Drain Valve         OPEN             CAUTION SCW-1-423     SCW Pump 1-1 Discharge Drain Valve         OPEN             CAUTION
52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION  
*CBC for SCW pump control switch is not required for completion of this task.
*CBC for SCW pump control switch is not required for completion of this task.  
ML082830905.DOC                        Page 20 of 6                                  REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-RC-RO
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/258/2008 REV. 0 Number:
NRCADM061-RC-RO


==Title:==
==Title:==
Stay Time Determination Examinee:
Stay Time Determination Examinee:
Evaluator:
Evaluator:
Print                     Signature             Date Results:         Sat                   Unsat           Total Time:           minutes Comments:       Designed for RO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for RO Candidates in a classroom setting.  


==References:==
==References:==
RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path:   Yes                         No             X Time Critical:     Yes                         No             X Time Allotment:   10 minutes Critical Steps:   3.3 Job Designation:   RO K/A:               G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions.
RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path:
Rating:           3.2 AUTHOR:                        DAVID BURNS                  DATE:      01/258/2008 REV. 0
Yes No X
Time Critical:
Yes No X
Time Allotment:
10 minutes Critical Steps:
3.3 Job Designation:
RO K/A:
G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions.
Rating:
3.2  


JPM TITLE:     STAY TIME DETERMINATION             JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Directions:             No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:     RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Attachment 8.1 Initial Conditions:     The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET ML082830905.DOC Page 22 of 66 REV. 0 Directions:
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:
RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8.1 Initial Conditions:
The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:         The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:
Task Standard:           DO NOT READ TO STUDENT: Maximum Stay time is calculated.
The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
ML082830905.DOC                            Page 22 of 66                                  REV. 0
Task Standard:
DO NOT READ TO STUDENT: Maximum Stay time is calculated.  


JPM TITLE:   STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                 Expected Operator Actions
STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET
: 1. Determine TEDE                             1.1     TEDE = DDE + CEDE 1.2     TEDE = 400 mrem + 200 mrem 1.3     TEDE = 600 mrem Step was: Sat: ______ Unsat _______*
* Denotes an entry required on the JPM cover sheet.
: 2. Determine DCPP Administrative             2.1     Determines DCPP Administrative Limits for TEDE                                    Limit for TEDE = 4500 mrem 2.2     Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3     Determine MARGIN to Administrative Guideline is:
** Denotes a Critical Step.
2000 - 600 = 1400 mrem Step was: Sat: ______ Unsat _______*
ML082830905.DOC Page 23 of 66 REV. 0 Start Time:
** 3. Determine maximum stay time                   3.1     Stay time = Margin / Dose Rate 3.2     Stay time = 1400 mrem / 280 mrem/hr
Step Expected Operator Actions
                                                ** 3.3     Stay time = 5 hours ACCEPTABLE TIME: 4.8 - 5.0 hours Step was: Sat: ______ Unsat _______*
: 1.
Determine TEDE 1.1 TEDE = DDE + CEDE 1.2 TEDE = 400 mrem + 200 mrem 1.3 TEDE = 600 mrem Step was: Sat: ______ Unsat _______*
: 2. Determine DCPP Administrative Limits for TEDE 2.1 Determines DCPP Administrative Limit for TEDE = 4500 mrem 2.2 Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3 Determine MARGIN to Administrative Guideline is:
2000 - 600 = 1400 mrem Step was: Sat: ______ Unsat _______*  
** 3. Determine maximum stay time 3.1 Stay time = Margin / Dose Rate 3.2 Stay time = 1400 mrem / 280 mrem/hr 3.3 Stay time = 5 hours ACCEPTABLE TIME: 4.8 - 5.0 hours Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                            Page 23 of 66                                REV. 0


JPM NUMBER: NRCADM061-RC - RO EXAMINEE CUE SHEET Initial Conditions: The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
JPM NUMBER: NRCADM061-RC - RO EXAMINEE CUE SHEET ML082830905.DOC Page 24 of 66 REV. 0 Initial Conditions:
The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:     The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:
Document Your Answer Here ML082830905.DOC                        Page 24 of 66                                REV. 0
The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
Document Your Answer Here  


JPM TITLE:   STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
JPM TITLE:
ML082830905.DOC                          Page 25 of 66                        REV. 0
STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 25 of 66 REV. 0 The simulator is not needed for the performance of this JPM.  


JPM TITLE:     STAY TIME DETERMINATION                   JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Initial Conditions:     The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
JPM TITLE:
STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY ML082830905.DOC Page 26 of 66 REV. 0 Initial Conditions:
The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Dose Equivalent (CDE) 10 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Committed Effective Dose Equivalent (CEDE) 200 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Deep Dose Equivalent (DDE) 400 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Eye Dose Equivalent (LDE) 20 mrem
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:         The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).
* Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:
ML082830905.DOC                            Page 26 of 66                                REV. 0
The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).  


JPM TITLE:     STAY TIME DETERMINATION               JPM NUMBER: NRCADM061-RC - RO ANSWER KEY Document Your Answer Here TEDE = DDE + CEDE         TEDE = 400 mrem + 200 mrem       TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate     1400 mrem / 280 mrem/hr Stay time = 5 hours ML082830905.DOC                        Page 27 of 66                        REV. 0
JPM TITLE:
STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY ML082830905.DOC Page 27 of 66 REV. 0 Document Your Answer Here TEDE = DDE + CEDE TEDE = 400 mrem + 200 mrem TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate 1400 mrem / 280 mrem/hr Stay time = 5 hours  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-SRO1
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-COO-SRO1


==Title:==
==Title:==
Determination of Shift Staffing and Overtime Restrictions Examinee:
Determination of Shift Staffing and Overtime Restrictions Examinee:
Evaluator:
Evaluator:
Print                       Signature               Date Results:         Sat                   Unsat             Total Time:             minutes Comments:       Designed for SRO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:   Yes             X             No               X Time Critical:   Yes                           No               X Time Allotment:   10 minutes Critical Steps:   1, 2, 3 Job Designation: SRO K/A:             G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:
Rating:           3.9 AUTHOR:                        DAVID BURNS                      DATE:        01/24/2008 REV. 0
Yes X
No X
Time Critical:
Yes No X
Time Allotment:
10 minutes Critical Steps:
1, 2, 3 Job Designation:
SRO K/A:
G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
Rating:
3.9  


JPM TITLE:     DETERMINATION OF SHIFT STAFFING AND       JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS                    SRO1 INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:   Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR WORKSHEET ML082830905.DOC Page 29 of 6 REV. 0 Directions:
Initiating Cue:       Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Task Standard:         DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student handout.
Required Materials:
ML082830905.DOC                            Page 29 of 6                                  REV. 0
OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:
Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
Initiating Cue:
Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Task Standard:
DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student handout.  


JPM TITLE:   DETERMINATION OF SHIFT STAFFING AND           JPM NUMBER: NRCADM061-COO-OVERTIME RESTRICTIONS                        SRO1 INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                     Expected Operator Actions
DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR WORKSHEET
**   1. Evaluates RO1 previous work                   1.2     Identifies that following limit applies.
* Denotes an entry required on the JPM cover sheet.
schedule.
** Denotes a Critical Step.
* 72 hours in 7 days.
ML082830905.DOC Page 30 of 6 REV. 0 Start Time:
1.3     Determines that RO1 is not eligible. **
Step Expected Operator Actions  
** 1.
Evaluates RO1 previous work schedule.
1.2 Identifies that following limit applies.
72 hours in 7 days.
1.3 Determines that RO1 is not eligible. **
Note: This limit will be exceeded after working today.
Note: This limit will be exceeded after working today.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
**   2. Evaluates RO2 previous work                   2.1     Determines that no limits have been schedule.                                            exceeded.
** 2.
2.2     Determines that RO2 is eligible. **
Evaluates RO2 previous work schedule.
Step was: Sat: ______ Unsat _______*
2.1 Determines that no limits have been exceeded.
**   3. Evaluates RO3 previous work                   3.1     Identifies that following limit applies.
2.2 Determines that RO2 is eligible. **
schedule.
Step was: Sat: ______ Unsat _______*  
* 24 hours in 48 hours.
** 3.
3.2     Determines that RO3 is not eligible. **
Evaluates RO3 previous work schedule.
3.1 Identifies that following limit applies.
24 hours in 48 hours.
3.2 Determines that RO3 is not eligible. **
Note: This limit will be exceeded after working today.
Note: This limit will be exceeded after working today.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                              Page 30 of 6                                        REV. 0


JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE CUE SHEET Initial Conditions:     Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE CUE SHEET ML082830905.DOC Page 31 of 6 REV. 0 Initial Conditions:
Initiating Cue:         Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
Initiating Cue:
Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Previous Work Schedule:
Previous Work Schedule:
Mon       Tues       Wed       Thurs       Fri         Sat       Sun       Mon Operator   June 9     June 10     June 11   June 12   June 13     June 14   June 15   June 16 RO1       OFF       0700-       0700-     0700-     0700-       0700-     0700-1900        1900      1900      1900        1900      1900 RO2       0700-       0700-       0700-     0700-       OFF       0700-     0700-1900      1900        1900      1900                  1900      1900 RO3       OFF       0700-       0700-     0700-     0700-       OFF     0700-1700        1700      1700      1700                  2100 Reactor Operator(s) eligible to work June 16th Yes             No RO1           [ ]             [ ]
Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900 RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100 Reactor Operator(s) eligible to work June 16th Yes No RO1
RO2           [ ]             [ ]
[ ]
RO3           [ ]             [ ]
[ ]
ML082830905.DOC                            Page 31 of 6                                  REV. 0
RO2
[ ]
[ ]
RO3
[ ]
[ ]  


JPM TITLE:   DETERMINATION OF SHIFT STAFFING           JPM NUMBER: NRCADM061-COO-SRO1 AND OVERTIME RESTRICTIONS ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
JPM TITLE:
ML082830905.DOC                          Page 32 of 6                          REV. 0
DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 32 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  


JPM TITLE: DETERMINATION OF SHIFT STAFFING AND       JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Initial Conditions: Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ANSWER KEY ML082830905.DOC Page 33 of 6 REV. 0 Initial Conditions:
Initiating Cue:     Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.
Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.
ML082830905.DOC                        Page 33 of 6                                  REV. 0
Initiating Cue:
Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.  


JPM TITLE: DETERMINATION OF SHIFT STAFFING AND           JPM NUMBER: NRCADM061-COO-SRO1 OVERTIME RESTRICTIONS ANSWER KEY Previous Work Schedule:
JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ANSWER KEY ML082830905.DOC Page 34 of 6 REV. 0 Previous Work Schedule:
Mon         Tues       Wed       Thurs       Fri     Sat     Sun     Mon Operator   June 9     June 10   June 11   June 12   June 13 June 14 June 15 June 16 RO1       OFF         0700-     0700-     0700-     0700-   0700-   0700-1900      1900        1900      1900    1900    1900 RO2     0700-       0700-     0700-     0700-       OFF     0700-   0700-1900        1900      1900        1900              1900    1900 RO3       OFF         0700-     0700-     0700-     0700-     OFF     0700-1700      1700        1700      1700              2100 Reactor Operator(s) eligible to work June 16th Yes             No RO1         [ ]             [X]
Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900 RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100 Reactor Operator(s) eligible to work June 16th Yes No RO1
RO2         [X]             [ ]
[ ]
RO3         [ ]             [X]
[X]
ML082830905.DOC                            Page 34 of 6                            REV. 0
RO2
[X]
[ ]
RO3
[ ]
[X]  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-COO-SRO2
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-COO-SRO2


==Title:==
==Title:==
Approve Movement of Spent Fuel Assemblies Examinee:
Approve Movement of Spent Fuel Assemblies Examinee:
Evaluator:
Evaluator:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:         minutes Comments:       Designed for SRO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path:   Yes             X           No Time Critical:   Yes                         No             X Time Allotment:   15 minutes Critical Steps:   1, 2, 3, 4 Job Designation: SRO K/A:             G 2.1.40; Knowledge of refueling administrative requirements.
OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path:
Rating:           3.9 AUTHOR:                        DAVID BURNS                    DATE:    01/24/2008 REV. 0
Yes X
No Time Critical:
Yes No X
Time Allotment:
15 minutes Critical Steps:
1, 2, 3, 4 Job Designation:
SRO K/A:
G 2.1.40; Knowledge of refueling administrative requirements.
Rating:
3.9  


JPM TITLE:     APPROVE MOVEMENT OF SPENT FUEL         JPM NUMBER: NRCADM061-COO-ASSEMBLIES                              SRO2 INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions:   Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET ML082830905.DOC Page 36 of 6 REV. 0 Directions:
Initiating Cue:       You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Task Standard:       DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.
Required Materials:
ML082830905.DOC                          Page 36 of 6                                  REV. 0
Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions:
Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
Initiating Cue:
You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
Task Standard:
DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.  


JPM TITLE:   APPROVE MOVEMENT OF SPENT FUEL             JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                SRO2 INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                 Expected Operator Actions
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET
** 1. Determine if Element K-24 can             2.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.
* Denotes an entry required on the JPM cover sheet.
** Denotes a Critical Step.
ML082830905.DOC Page 37 of 6 REV. 0 Start Time:
Step Expected Operator Actions  
** 1. Determine if Element K-24 can be placed in the Cask Pit Storage Rack.
2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.
2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
** 2. Determine if Element F-06 can             2.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.
** 2. Determine if Element F-06 can be placed in the Cask Pit Storage Rack.
2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.
2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
** 3. Determine if Element G-17 can             3.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.
** 3. Determine if Element G-17 can be placed in the Cask Pit Storage Rack.
3.1 Determines that the assembly discharge burn up and Initial Enrichment is in the Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.
3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
* Denotes an entry required on the JPM cover sheet.
 
JPM TITLE:
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET
* Denotes an entry required on the JPM cover sheet.  
** Denotes a Critical Step.
** Denotes a Critical Step.
ML082830905.DOC                           Page 37 of 6                                   REV. 0
ML082830905.DOC Page 38 of 6 REV. 0  
 
** 4. Determine if Element D-32 can be placed in the Cask Pit Storage Rack.
JPM TITLE:    APPROVE MOVEMENT OF SPENT FUEL              JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                  SRO2 INSTRUCTOR W ORKSHEET
4.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.
** 4. Determine if Element D-32 can               4.1 Determines that the assembly discharge be placed in the Cask Pit Storage              burn up and Initial Enrichment is in the Rack.                                          acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.
4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                            Page 38 of 6                                    REV. 0


JPM NUMBER: NRCADM061-COO-SRO2 EXAMINEE CUE SHEET Initial Conditions:     Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
JPM NUMBER: NRCADM061-COO-SRO2 EXAMINEE CUE SHEET ML082830905.DOC Page 39 of 6 REV. 0 Initial Conditions:
Initiating Cue:         You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
Element       Initial           Discharge        Decay          Allow or Dis-allow Enrichment           Burnup          Time (wt% U-235)         (GWd/mtU)         (Years)
Initiating Cue:
K-24           3.0               26               8       Allow [ ]   Dis-allow [ ]
You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.
F-06         3.25               23             12       Allow [ ]   Dis-allow [ ]
Element Initial Enrichment (wt% U-235)
G-17           3.5               21             11       Allow [ ]   Dis-allow [ ]
Discharge Burnup (GWd/mtU)
D-32           3.5               25             14       Allow [ ]   Dis-allow [ ]
Decay Time (Years)
ML082830905.DOC                              Page 39 of 6                                REV. 0
Allow or Dis-allow K-24 3.0 26 8
Allow [ ]
Dis-allow [ ]
F-06 3.25 23 12 Allow [ ]
Dis-allow [ ]
G-17 3.5 21 11 Allow [ ]
Dis-allow [ ]
D-32 3.5 25 14 Allow [ ]
Dis-allow [ ]  


JPM TITLE:   APPROVE MOVEMENT OF SPENT FUEL           JPM NUMBER: NRCADM061-COO-ASSEMBLIES                                SRO2 ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
JPM TITLE:
ML082830905.DOC                          Page 40 of 6                        REV. 0
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 40 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  


JPM TITLE:     APPROVE MOVEMENT OF SPENT FUEL         JPM NUMBER: NRCADM061-COO-ASSEMBLIES                              SRO2 ANSWER KEY Initial Conditions:   Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
JPM TITLE:
Initiating Cue:       You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed based on the conditions given for each assembly.
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER KEY ML082830905.DOC Page 41 of 6 REV. 0 Initial Conditions:
ML082830905.DOC                          Page 41 of 6                                REV. 0
Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.
Initiating Cue:
You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed based on the conditions given for each assembly.  


JPM TITLE:   APPROVE MOVEMENT OF SPENT FUEL       JPM NUMBER: NRCADM061-COO-ASSEMBLIES                          SRO2 ANSWER KEY Element       Initial     Discharge        Decay        Allow or Dis-allow Enrichment     Burnup          Time (wt% U-235)   (GWd/mtU)       (Years)
JPM TITLE:
K-24           3.0         26             8     Allow [ ]   Dis-allow [ X ]
APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER KEY ML082830905.DOC Page 42 of 6 REV. 0 Element Initial Enrichment (wt% U-235)
F-06         3.25         23             12     Allow [ X ] Dis-allow [ ]
Discharge Burnup (GWd/mtU)
G-17           3.5         21             11     Allow [ ]   Dis-allow [ X ]
Decay Time (Years)
D-32           3.5         25             14     Allow [ X ] Dis-allow [ ]
Allow or Dis-allow K-24 3.0 26 8
ML082830905.DOC                      Page 42 of 6                              REV. 0
Allow [ ]
Dis-allow [ X ]
F-06 3.25 23 12 Allow [ X ] Dis-allow [ ]
G-17 3.5 21 11 Allow [ ]
Dis-allow [ X ]
D-32 3.5 25 14 Allow [ X ] Dis-allow [ ]  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EC-SRO
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/24/2008 REV. 0 Number:
NRCADM061-EC-SRO


==Title:==
==Title:==
Evaluate Clearance Points and Tagging Requirements Examinee:
Evaluate Clearance Points and Tagging Requirements Examinee:
Evaluator:
Evaluator:
Print                     Signature           Date Results:         Sat                   Unsat           Total Time:       minutes Comments:       Designed for SRO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Alternate Path:   Yes             X           No Time Critical:   Yes                         No             X Time Allotment:   15 minutes Critical Steps:   1, 2, 3 Job Designation: SRO K/A:             G 2.2.13; Knowledge of tagging and clearance procedures.
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Alternate Path:
Rating:           4.3 AUTHOR:                        DAVID BURNS                    DATE:    01/24/2008 REV. 0
Yes X
No Time Critical:
Yes No X
Time Allotment:
15 minutes Critical Steps:
1, 2, 3 Job Designation:
SRO K/A:
G 2.2.13; Knowledge of tagging and clearance procedures.
Rating:
4.3  


JPM TITLE:     DETERMINE CLEARANCE POINTS               JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR WORKSHEET ML082830905.DOC Page 44 of 6 REV. 0 Directions:
Initiating Cue:       The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Task Standard:         DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.
Required Materials:
ML082830905.DOC                          Page 44 of 6                                    REV. 0
OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions:
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Initiating Cue:
The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
Task Standard:
DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.  


JPM TITLE:   DETERMINE CLEARANCE POINTS                 JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                 Expected Operator Actions
DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR WORKSHEET
** 1. Identify breaker for isolation of           2.1 Identifies that a DANGER tag should be SCWP 1-1, power supply is                      used for this component:
* Denotes an entry required on the JPM cover sheet.
tagged incorrectly.
** Denotes a Critical Step.
ML082830905.DOC Page 45 of 6 REV. 0 Start Time:
Step Expected Operator Actions  
** 1. Identify breaker for isolation of SCWP 1-1, power supply is tagged incorrectly.
2.1 Identifies that a DANGER tag should be used for this component:
* 52-11D-05 (motor)
* 52-11D-05 (motor)
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*  
** 2. Identify discharge valve is               2.2 Identifies the following valve should be required to be re-positioned for               CLOSED:
** 2. Identify discharge valve is required to be re-positioned for isolation of SCWP 1-1, check valve is not allowed isolation point.
isolation of SCWP 1-1, check valve is not allowed isolation
2.2 Identifies the following valve should be CLOSED:
* SCW-1-9 discharge valve point.
* SCW-1-9 discharge valve Step was: Sat: ______ Unsat _______*  
Step was: Sat: ______ Unsat _______*
** 3. Identify additional valve required to be opened to drain and vent SCWP 1-1.
** 3. Identify additional valve required         3.2 Identifies the following valves OPEN.
3.2 Identifies the following valves OPEN.
to be opened to drain and vent SCWP 1-1.
* SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
* SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
3.2 Identifies that a CAUTION Tag should be used for this components.
3.2 Identifies that a CAUTION Tag should be used for this components.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                            Page 45 of 6                                    REV. 0


JPM NUMBER: NRCADM061-EC-SRO EXAMINEE CUE SHEET Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
JPM NUMBER: NRCADM061-EC-SRO EXAMINEE CUE SHEET ML082830905.DOC Page 46 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
CLEARANCE                   DESCRIPTION                     CLEARED             TAGGING POINT                                                    POSITION          REQUIREMENT SCW PP-1-1     Control Switch                                 OFF                 CBC 52-11D-05     SCW Pump 1-1 480 v Supply                     OPEN             CAUTION SCW-1-293     SCW Pump 1-1 Discharge Valve                 CLOSED               DANGER SCW-1-1       SCW Pump 1-1 Suction Valve                   CLOSED               DANGER SCW 1-3       SCW Pump 1-1 Suction Drain Valve               OPEN             CAUTION SCW 1-5       SCW Pump 1-1 Casing Vent Valve                 OPEN             CAUTION SCW-1-7       SCW Pump 1-1 Discharge Drain Valve             OPEN             CAUTION Discrepancies found ML082830905.DOC                          Page 46 of 6                                    REV. 0
Initiating Cue:
The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found  


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                 JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 47 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 47 of 6                        REV. 0


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                 JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY Initial Conditions:   Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY ML082830905.DOC Page 48 of 6 REV. 0 Initial Conditions:
Initiating Cue:       The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.
Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.
ML082830905.DOC                          Page 48 of 6                                    REV. 0
Initiating Cue:
The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.  


JPM
JPM


==Title:==
==Title:==
Determine Clearance Points                   JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY CLEARANCE                   DESCRIPTION                     CLEARED             TAGGING POINT                                                    POSITION          REQUIREMENT SCW PP-1-1     Control Switch                                   OFF                 CBC 52-11D-05     SCW Pump 1-1 480 v Supply                       OPEN             CAUTION SCW-1-293     SCW Pump 1-1 Discharge Valve                 CLOSED               DANGER SCW-1-1       SCW Pump 1-1 Suction Valve                   CLOSED               DANGER SCW 1-3       SCW Pump 1-1 Suction Drain Valve               OPEN             CAUTION SCW 1-5       SCW Pump 1-1 Casing Vent Valve                 OPEN             CAUTION SCW-1-7       SCW Pump 1-1 Discharge Drain Valve             OPEN             CAUTION Discrepancies found CLEARANCE                   DESCRIPTION                     CLEARED             TAGGING POINT                                                    POSITION          REQUIREMENT 52-11D-05     SCW Pump 1-1 480 v Supply                       OPEN               DANGER SCW-1-9 not     SCW Pump 1-1 Discharge Valve                 CLOSED               DANGER SCW-1-293 SCW-1-423     SCW Pump 1-1 Discharge Drain Valve             OPEN             CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.
Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY ML082830905.DOC Page 49 of 6 REV. 0 CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT 52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 not SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.  
ML082830905.DOC                          Page 49 of 6                                    REV. 0


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-EP-SRO
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/28/08 REV. 0 Number:
NRCADM061-EP-SRO


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:
Evaluator:
Evaluator:
Print                     Signature             Date Results:         Sat             Unsat             Total Time:               minutes Comments:       The simulator is not needed for the performance of this JPM.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
The simulator is not needed for the performance of this JPM.  


==References:==
==References:==
DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path: Yes             No     X Time Critical:   Yes             No     X Time Allotment: 15 minutes Critical Steps: 2 Job Designation: SRO K/A:             G 2.4.41; Knowledge of the emergency action level thresholds and classifications.
DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path:
Rating:         4.6 AUTHOR:                        DAVID BURNS                  DATE:        01/28/08 REV. 0
Yes No X
Time Critical:
Yes No X
Time Allotment:
15 minutes Critical Steps:
2 Job Designation:
SRO K/A:
G 2.4.41; Knowledge of the emergency action level thresholds and classifications.
Rating:
4.6  


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A                         JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                                    NRCADM061-EP-SRO Instructor Worksheet Directions:           No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin.
NRCADM061-EP-SRO Instructor Worksheet ML082830905.DOC Page 51 of 66 REV. 0 Directions:
Required Materials:   DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions:   Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin.
Required Materials:
DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions:
Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
The following results are predicted at the site boundary:
TEDE:                   150 mR Thyroid CDE:           600 mR Initiating Cue:       Determine the proper event classification and report results to the Shift Manager.
TEDE:
Task Standard:       DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.
150 mR Thyroid CDE:
ML082830905.DOC                          Page 51 of 66                                  REV. 0
600 mR Initiating Cue:
Determine the proper event classification and report results to the Shift Manager.
Task Standard:
DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.  


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A                           JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                                      NRCADM061-EP-SRO Instructor Worksheet Start Time:
NRCADM061-EP-SRO Instructor Worksheet
Step                                   Expected Operator Actions
* Denotes an entry required on the JPM cover sheet.
: 1. Obtain correct procedure.                   1.1   References DCPP Emergency Action Level Matrix or EP G-1.
** Denotes Critical Step and Sub Steps.
Step was: Sat: _______ Unsat ______*
ML082830905.DOC Page 52 of 66 REV. 0 Start Time:
** 2. DCPP Emergency Action Level                 2.1     Determines the Earthquake event is Matrix or EP G-1.                                  an ALERT (HA 1.1 or ALERT 17).
Step Expected Operator Actions
2.2     Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**
: 1. Obtain correct procedure.
1.1 References DCPP Emergency Action Level Matrix or EP G-1.
Step was: Sat: _______ Unsat ______*  
** 2. DCPP Emergency Action Level Matrix or EP G-1.
2.1 Determines the Earthquake event is an ALERT (HA 1.1 or ALERT 17).
2.2 Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**
Note: Order of classification is not important, final classification is critical step.
Note: Order of classification is not important, final classification is critical step.
Step was: Sat: _______ Unsat ______*
Step was: Sat: _______ Unsat ______*
: 3. Report Event Classification                 3.1   Reports to Shift Manager an initial classification of Site Area Emergency.
: 3. Report Event Classification 3.1 Reports to Shift Manager an initial classification of Site Area Emergency.
Step was: Sat: _______ Unsat ______*
Step was: Sat: _______ Unsat ______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes Critical Step and Sub Steps.
ML082830905.DOC                          Page 52 of 66                                  REV. 0


JPM Number:
JPM Number:
NRCADM061-EP-SRO Examinee Cue Sheet Initial Conditions: Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
NRCADM061-EP-SRO Examinee Cue Sheet ML082830905.DOC Page 53 of 66 REV. 0 Initial Conditions:
Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
The following results are predicted at the site boundary:
TEDE:                   150 mR Thyroid CDE:           600 mR Initiating Cue:     Determine the proper event classification and report results to the Shift Manager.
TEDE:
Document Your Answer Here ML082830905.DOC                        Page 53 of 66                                  REV. 0
150 mR Thyroid CDE:
600 mR Initiating Cue:
Determine the proper event classification and report results to the Shift Manager.
Document Your Answer Here  


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A     JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC               Page 54 of 66               REV. 0
NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 54 of 66 REV. 0  


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A                   JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                                NRCADM061-EP-SRO Attachment 1, Simulator Setup The simulator is not needed for the performance of this JPM.
NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 55 of 66 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 55 of 66                    REV. 0


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A                           JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                                        NRCADM061-EP-SRO Attachment 1, Simulator Setup Initial Conditions:     Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 56 of 66 REV. 0 Initial Conditions:
Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.
The following results are predicted at the site boundary:
The following results are predicted at the site boundary:
TEDE:                   150 mR Thyroid CDE:           600 mR Initiating Cue:         Determine the proper event classification and report results to the Shift Manager.
TEDE:
150 mR Thyroid CDE:
600 mR Initiating Cue:
Determine the proper event classification and report results to the Shift Manager.
Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).
Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).
Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)
Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)
EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)
EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)  
ML082830905.DOC                            Page 56 of 66                                  REV. 0


JPM
JPM


==Title:==
==Title:==
CLASSIFY AN EARTHQUAKE WITH A     JPM Number:
CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:
RADIATION RELEASE                NRCADM061-EP-SRO , Simulator Setup ML082830905.DOC               Page 57 of 66               REV. 0
NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 57 of 66 REV. 0  


NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE Number:         NRCADM061-RC-SRO
NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:
DAVID BURNS DATE:
01/28/2008 REV. 0 Number:
NRCADM061-RC-SRO


==Title:==
==Title:==
Authorize Gas Decay Tank Discharge Examinee:
Authorize Gas Decay Tank Discharge Examinee:
Evaluator:
Evaluator:
Print                       Signature       Date Results:         Sat                   Unsat             Total Time:     minutes Comments:       Designed for SRO Candidates in a classroom setting.
Print Signature Date Results:
Sat Unsat Total Time:
minutes Comments:
Designed for SRO Candidates in a classroom setting.  


==References:==
==References:==
OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path:   Yes             X             No Time Critical:   Yes                           No             X Time Allotment:   20 minutes Critical Steps:   4 Job Designation: SRO K/A:             G 2.3.6; Ability to approve release permits.
OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path:
Rating:           3.8 AUTHOR:                        DAVID BURNS                    DATE: 01/28/2008 REV. 0
Yes X
No Time Critical:
Yes No X
Time Allotment:
20 minutes Critical Steps:
4 Job Designation:
SRO K/A:
G 2.3.6; Ability to approve release permits.
Rating:
3.8  


JPM TITLE:     AUTHORIZE GAS DECAY TANK                 JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Directions:           No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
JPM TITLE:
Required Materials:   OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.
AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR WORKSHEET ML082830905.DOC Page 59 of 6 REV. 0 Directions:
10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions:   RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.
Required Materials:
OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.
10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions:
RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:       As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Initiating Cue:
Task Standard:         DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the student handout.
As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
ML082830905.DOC                            Page 59 of 6                                  REV. 0
Task Standard:
DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the student handout.  


JPM TITLE:   AUTHORIZE GAS DECAY TANK                   JPM NUMBER: NRCADM061-RC-SRO DISCHARGE INSTRUCTOR W ORKSHEET Start Time:
JPM TITLE:
Step                                 Expected Operator Actions
AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR WORKSHEET
: 1. Review Sample Information and               2.1 Identifies that a second sample of the Analysis information for                        GDT should have been done, since RE-accuracy.                                      22 is inoperable.
* Denotes an entry required on the JPM cover sheet.
Step was: Sat: ______ Unsat _______*
** Denotes a Critical Step.
: 2. Review Release Authorization              2.3 Determines that Release Authorization (CHEM) for accuracy.                            (CHEM) is correct.
ML082830905.DOC Page 60 of 6 REV. 0 Start Time:
Step Expected Operator Actions
: 1. Review Sample Information and Analysis information for accuracy.
2.1 Identifies that a second sample of the GDT should have been done, since RE-22 is inoperable.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
: 3. Review Release Information and            3.3 Identifies that Gas Decay Tank Pressure Approval for accuracy.                          has decreased by 6 psig.
: 2.
Review Release Authorization (CHEM) for accuracy.
2.3 Determines that Release Authorization (CHEM) is correct.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
** 4. Determine if Authorization                 4.1 Determines that the Authorization should be approved.                            should not be approved, based on either condition not meeting the procedural requirements.
: 3. Review Release Information and Approval for accuracy.
3.3 Identifies that Gas Decay Tank Pressure has decreased by 6 psig.
Step was: Sat: ______ Unsat _______*
** 4. Determine if Authorization should be approved.
4.1 Determines that the Authorization should not be approved, based on either condition not meeting the procedural requirements.
Step was: Sat: ______ Unsat _______*
Step was: Sat: ______ Unsat _______*
Stop Time:
Stop Time:
Total Time:                 (Enter total time on the cover page)
Total Time:
* Denotes an entry required on the JPM cover sheet.
(Enter total time on the cover page)  
** Denotes a Critical Step.
ML082830905.DOC                            Page 60 of 6                                    REV. 0


JPM NUMBER: NRCADM061-RC-SRO EXAMINEE CUE SHEET Initial Conditions:     RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
JPM NUMBER: NRCADM061-RC-SRO EXAMINEE CUE SHEET ML082830905.DOC Page 61 of 6 REV. 0 Initial Conditions:
RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:         As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Initiating Cue:
As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Technical Errors Identified:
Technical Errors Identified:
[ ] APPROVE Discharge                                 [ ] DO NOT Approve Discharge ML082830905.DOC                              Page 61 of 6                                REV. 0
[ ] APPROVE Discharge
[ ] DO NOT Approve Discharge  


AUTHORIZE GAS DECAY TANK DISCHARGE                     JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP The simulator is not needed for the performance of this JPM.
AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 62 of 6 REV. 0 The simulator is not needed for the performance of this JPM.  
ML082830905.DOC                          Page 62 of 6                        REV. 0


AUTHORIZE GAS DECAY TANK DISCHARGE                         JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP Initial Conditions:     RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 63 of 6 REV. 0 Initial Conditions:
RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.
Initiating Cue:         As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Initiating Cue:
As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.
Technical Errors Identified:
Technical Errors Identified:
Section 1: Second sample not completed, required when RE-22 is Inoperable.
Section 1: Second sample not completed, required when RE-22 is Inoperable.
P&L 5.3 and Step 6.1.2.b.4 Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed.
P&L 5.3 and Step 6.1.2.b.4 Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed.
P&L 5.8
P&L 5.8
[ ] APPROVE Discharge                                 [ X ] DO NOT Approve Discharge ML082830905.DOC                              Page 63 of 6                                REV. 0
[ ] APPROVE Discharge
[ X ] DO NOT Approve Discharge  


69-9351           07/25/02                                                   Page 64 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1                           1AND 2 Batch No.
69-9351 07/25/02 Page 64 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:
TITLE:     Authorization for Gas Decay Tank Discharge                                           2008-1-1 Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry.
Authorization for Gas Decay Tank Discharge Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry.
: 1. SAMPLE INFORMATION AND ANALYSIS                                         Unit #       1
: 1.
: a. GDT No.               1-1         Tank Pressure             98         psig
SAMPLE INFORMATION AND ANALYSIS Unit #
: b. Date/Time Sample Collected: First       06/15/2008 / 1505   Second           N/A
1
: c. Sample Analysis Summary Nuclide     Concentration, Ci/cc (ntp)               Nuclide     Concentration, Ci/cc (ntp)
: a.
KR-85       1.26E-004
GDT No.
: d. Projected Dose at Site Boundary
1-1 Tank Pressure 98 psig
: 1)   Gamma air dose           5.69E-008     mrad         N/A       mrad (Second Sample)
: b.
: 2)   Beta air dose           6.45-006       mrad         N/A       mrad (Second Sample)
Date/Time Sample Collected: First 06/15/2008 / 1505 Second N/A
: e. Projected Release Rate
: c.
: 1)     Q& t =           1.8E+000     Ci/sec           N/A           Ci/sec (Second Sample)
Sample Analysis Summary Nuclide Concentration, Ci/cc (ntp)
: 2)   Percent of release rate limit =         0.0     %        N/A       % (Second Sample)
Nuclide Concentration, Ci/cc (ntp)
: 2. RELEASE AUTHORIZATION (CHEM)
KR-85 1.26E-004
Expected reading (Above Background)             RE-22       4   cpm High alarm setpoint (Admin. Limit)             RE-22 7020       cpm GDT No.               1-1       is approved for discharge. OP1.DC2 applies.
: d.
Projected Dose at Site Boundary
: 1)
Gamma air dose 5.69E-008 mrad N/A mrad (Second Sample)
: 2)
Beta air dose 6.45-006 mrad N/A mrad (Second Sample)
: e.
Projected Release Rate
: 1) t Q& =
1.8E+000 Ci/sec N/A Ci/sec (Second Sample)
: 2)
Percent of release rate limit =
0.0 N/A  
% (Second Sample)
: 2.
RELEASE AUTHORIZATION (CHEM)
Expected reading (Above Background)
RE-22 4
cpm High alarm setpoint (Admin. Limit)
RE-22 7020 cpm GDT No.
1-1 is approved for discharge. OP1.DC2 applies.
The following additional requirements must be met prior to release:
The following additional requirements must be met prior to release:
Signed:             Joe Chemist                                     Date/Time       06/15/2008 / 1800 Chemistry Supervision or Authorized Personnel
Signed:
Joe Chemist Date/Time 06/15/2008 / 1800 Chemistry Supervision or Authorized Personnel Batch No.
2008-1-1


69-9351       07/25/02                                                   Page 65 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1                           1AND 2 TITLE:   Authorization for Gas Decay Tank Discharge
69-9351 07/25/02 Page 65 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:
: 3. RELEASE INFORMATION AND APPROVAL
Authorization for Gas Decay Tank Discharge
: a. RE-22 instrument check Channel Check     SAT                     UNSAT         X Source check reading     N/A     cpm     Date/Time     N/A   / N/A RE-22 is OPERABLE [ ]. INOPERABLE [X ]             (if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR).
: 3.
Date/Time Caution Tag attached to FCV-410 key           06/06/2008 / 1350 Date/Time 14-day period expires                         06/20/2008 / 1350 Date/Time AR filled out                                 06/06/2008 / 1410
RELEASE INFORMATION AND APPROVAL
: b. Valve Alignment:       Signed               Joe Operator Operator performing valve alignment Valve Number used:     Signed                 Ken Cando 1-FCV-404                         Operator verifying valve alignment
: a.
: c. Gas Decay Tank Pressure prior to release       92     psig
RE-22 instrument check Channel Check SAT UNSAT X
: d. Approved                             Date/Time Shift Foreman
Source check reading N/A cpm Date/Time N/A / N/A RE-22 is OPERABLE [ ]. INOPERABLE [X ]
: e. Date/Time FCV-410 opened                   /
(if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR).
: f. Date/Time release terminated               /
Date/Time Caution Tag attached to FCV-410 key 06/06/2008 / 1350 Date/Time 14-day period expires 06/20/2008 / 1350 Date/Time AR filled out 06/06/2008 / 1410
: g. GDT pressure after release                     psig
: b.
: h. Comments:
Valve Alignment:
Signed                               /
Signed Joe Operator Operator performing valve alignment Valve Number used:
Operator                       Date/Time Reviewed                               /
Signed Ken Cando 1-FCV-404 Operator verifying valve alignment
Shift Foreman                   Date/Time Noted Chemistry Supervision
: c.
Gas Decay Tank Pressure prior to release 92 psig
: d.
Approved Date/Time Shift Foreman
: e.
Date/Time FCV-410 opened  
/
: f.
Date/Time release terminated  
/
: g.
GDT pressure after release psig
: h.
Comments:
Signed  
/
Operator Date/Time Reviewed  
/
Shift Foreman Date/Time Noted Chemistry Supervision  


69-9351     07/25/02                                 Page 66 of 2 DIABLO CANYON POWER PLANT CAP A-6 ATTACHMENT 11.1         1AND 2 TITLE: Authorization for Gas Decay Tank Discharge}}
69-9351 07/25/02 Page 66 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:
Authorization for Gas Decay Tank Discharge}}

Latest revision as of 14:48, 14 January 2025

DC-2008-06-Draft Admin Jpms
ML082830905
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/27/2008
From: Garchow S
Operations Branch IV
To:
Pacific Gas & Electric Co
References
Download: ML082830905 (66)


Text

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-COO-RO1

Title:

Determine if Channel Check Criteria is Met Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for RO Candidates in a classroom setting.

References:

STP I-1A, Mode 1 Checklist, Rev. 109, Page 14 OPS Policy B-5, Rev. 5 Photo of SG Level Channels Alternate Path:

Yes X

No Time Critical:

Yes No X

Time Allotment:

10 minutes Critical Steps:

1, 2 Job Designation:

RO K/A:

G 2.1.7; Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Rating:

4.4

JPM TITLE:

DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 INSTRUCTOR WORKSHEET ML082830905.DOC Page 2 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OPS Policy B-5, Channel Check Criteria, Rev. 5 Photo of SG Level Channels Initial Conditions:

Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue:

The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria. Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Task Standard:

DO NOT READ TO STUDENTS: All level channels that do not meet the channel check requirement are identified. This will be documented on the student handout.

JPM TITLE:

DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 3 of 6 REV. 0 Start Time:

Step Expected Operator Actions

    • 1.

Identify LI-519 does not meet the CHANNEL CHECK criteria.

2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % lower than other 2 channels.

LI-519 Step was: Sat: ______ Unsat _______*

    • 2.

Identify LI-538 does not meet the CHANNEL CHECK criteria.

2.1 Identifies the following channel as not meeting the CHANNEL CHECK requirements of OPS Policy B-5, Channel is reading 7 % Higher than other 2 channels.

LI-538 Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-COO-RO1 EXAMINEE CUE SHEET ML082830905.DOC Page 4 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue:

The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.

Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Channel Met Not Met Channel Met Not Met LI-517 LI-537 LI-518 LI-538 LI-519 LI-539 LI-527 LI-547 LI-528 LI-548 LI-529 LI-549

JPM

Title:

DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 5 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM

Title:

DETERMINE IF CHANNEL CHECK CRITERIA IS MET JPM NUMBER: NRCADM061-COO-RO1 ANSWER KEY ML082830905.DOC Page 6 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. A concern over the accuracy of the Steam Generator Level indication has been raised.

Initiating Cue:

The Shift Foreman has requested you CHANNEL CHECK the current Steam Generator Levels and report any channels that do not meet the CHANNEL CHECK requirement outlined in OPS Policy B-5; Channel Check Criteria.

Use the attached picture of SG Level channels to determine which channel(s) meet or do not meet the requirements.

Channel Met Not Met Channel Met Not Met LI-517 X

LI-537 X

LI-518 X

LI-538 X

LI-519 X

LI-539 X

LI-527 X

LI-547 X

LI-528 X

LI-548 X

LI-529 X

LI-549 X

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-COO-RO2

Title:

Application of Overtime Restrictions Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for RO Candidates in a classroom setting.

References:

OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:

Yes X

No Time Critical:

Yes No X

Time Allotment:

10 minutes Critical Steps:

2, 3 Job Designation:

RO K/A:

G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Rating:

2.9

JPM TITLE:

APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR WORKSHEET ML082830905.DOC Page 8 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:

Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue:

The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

Task Standard:

DO NOT READ TO STUDENTS: All overtime restrictions that have been exceeded have been identified. This will be documented on the student handout.

JPM TITLE:

APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 9 of 6 REV. 0 Start Time:

Step Expected Operator Actions

1.

Identifies that the 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> limits are not exceeded.

1.1 Identifies that following limits do not apply.

16 consecutive hours.

16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Note: Turnover time is not counted as actual time worked.

Step was: Sat: ______ Unsat _______*

    • 2.

Identifies that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> limit is exceeded.

2.1 Identifies that the following limit was exceeded.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Note: This limit was exceeded after working on Wednesday and again on Thursday.

(ONLY ONE IS REQUIRED)

Step was: Sat: ______ Unsat _______*

    • 3.

Identifies that the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit is exceeded.

2.1 Identifies that following limit was exceeded.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days.

Note: This limit was exceeded after working on Sunday, 73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> total.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-COO-RO2 EXAMINEE CUE SHEET ML082830905.DOC Page 10 of 6 REV. 0 Initial Conditions:

Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue:

The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

Previous Work Schedule:

Day Number of Hours Worked Turnover Time (Hours)

Position Sunday 0

0 OFF Monday 12 1

U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1

U1 BOPCO Friday 12 0

U1 CO Saturday 0

0 OFF Sunday 12 0

U1 CO Monday 0

0 OFF Today 12 0

U1 CO Overtime Restrictions Violated:

JPM

Title:

APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 11 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM

Title:

APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ANSWER KEY ML082830905.DOC Page 12 of 6 REV. 0 Initial Conditions:

Unit One is at 2% power. You are a Reactor Operator assigned to work in the control room during a plant restart, following a mini-outage for CWP repairs.

Initiating Cue:

The Shift Foreman has requested that you review your previous work history and verify that you have not exceeded any overtime restrictions in the past 10 days while supporting the mini-outage. Identify and document ALL overtime restrictions violated.

You are currently scheduled to work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> today, as the Unit 1 Control Operator.

JPM

Title:

APPLICATION OF OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-RO2 ANSWER KEY ML082830905.DOC Page 13 of 6 REV. 0 Previous Work Schedule:

Day Number of Hours Worked Turnover Time (Hours)

Position Sunday 0

0 OFF Monday 12 1

U1 BOPCO Tuesday 12 0.5 U1 BOPCO Wednesday 13 0.5 U1 BOPCO Thursday 12 1

U1 BOPCO Friday 12 0

U1 CO Saturday 0

0 OFF Sunday 12 0

U1 CO Monday 0

0 OFF Today 12 0

U1 CO Overtime Restrictions Violated:

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> on Wednesday and Thursday. (Only one is required) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days on Sunday. (73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> total)

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-EC-RO

Title:

Determine Clearance Points and Tagging Requirements Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for RO Candidates in a classroom setting.

References:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Alternate Path:

Yes No X

Time Critical:

Yes No X

Time Allotment:

20 minutes Critical Steps:

1, 2, 3 Job Designation:

RO K/A:

G 2.2.13; Knowledge of tagging and clearance procedures.

Rating:

4.1

JPM TITLE:

DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR WORKSHEET ML082830905.DOC Page 15 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 45 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

Task Standard:

DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.

JPM TITLE:

DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-RO INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 16 of 6 REV. 0 Start Time:

Step Expected Operator Actions

    • 1.

Identify breaker required to be re-positioned for isolation of power to SCWP 1-1.

2.1 Identifies the following breakers to be OPENED:

52-11D-05 (motor)

NOTE: May place Control Board Caution (CBC) Tag on SCW PP 1-1. (not part of critical task).

1.2 Identifies that a DANGER tag should be used for this component.

Step was: Sat: ______ Unsat _______*

    • 2.

Identify valves required to be closed to isolate SCWP 1-1.

2.1 Identifies the following valves CLOSED:

SCW-1-9 discharge valve SCW-1-1 suction valve 2.2 Identifies that a DANGER tag should be used for these components.

Step was: Sat: ______ Unsat _______*

    • 3.

Identify valves required to be opened to drain and vent SCWP 1-1.

3.1 Identifies the following valves OPEN.

SCW-1-3 pump suction drain SCW-1-5 pump casing vent SCW-1-7 pump discharge drain SCW-1-423 pump discharge drain NOTE: May CAUTION tag pump control switch, but not required.

3.2 Identifies that a CAUTION Tag should be used for these components.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-EC-RO EXAMINEE CUE SHEET ML082830905.DOC Page 17 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 18 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY ML082830905.DOC Page 19 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to identify all clearance points, their respective position for this clearance, along with the appropriate tagging requirements.

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-RO ANSWER KEY ML082830905.DOC Page 20 of 6 REV. 0 CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF Control Board Caution*

52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION

  • CBC for SCW pump control switch is not required for completion of this task.

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/258/2008 REV. 0 Number:

NRCADM061-RC-RO

Title:

Stay Time Determination Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for RO Candidates in a classroom setting.

References:

RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8 Alternate Path:

Yes No X

Time Critical:

Yes No X

Time Allotment:

10 minutes Critical Steps:

3.3 Job Designation:

RO K/A:

G 2.3.4; Knowledge of radiation exposure limits under normal or emergency conditions.

Rating:

3.2

JPM TITLE:

STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET ML082830905.DOC Page 22 of 66 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

RP1.ID6, Personnel Dose Limits and Monitoring Requirements, Rev. 8.1 Initial Conditions:

The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:

The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

Task Standard:

DO NOT READ TO STUDENT: Maximum Stay time is calculated.

JPM TITLE:

STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 23 of 66 REV. 0 Start Time:

Step Expected Operator Actions

1.

Determine TEDE 1.1 TEDE = DDE + CEDE 1.2 TEDE = 400 mrem + 200 mrem 1.3 TEDE = 600 mrem Step was: Sat: ______ Unsat _______*

2. Determine DCPP Administrative Limits for TEDE 2.1 Determines DCPP Administrative Limit for TEDE = 4500 mrem 2.2 Determines DCPP Administrative Guideline for TEDE = 2000 mrem 2.3 Determine MARGIN to Administrative Guideline is:

2000 - 600 = 1400 mrem Step was: Sat: ______ Unsat _______*

    • 3. Determine maximum stay time 3.1 Stay time = Margin / Dose Rate 3.2 Stay time = 1400 mrem / 280 mrem/hr 3.3 Stay time = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ACCEPTABLE TIME: 4.8 - 5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-RC - RO EXAMINEE CUE SHEET ML082830905.DOC Page 24 of 66 REV. 0 Initial Conditions:

The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:

The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

Document Your Answer Here

JPM TITLE:

STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 25 of 66 REV. 0 The simulator is not needed for the performance of this JPM.

JPM TITLE:

STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY ML082830905.DOC Page 26 of 66 REV. 0 Initial Conditions:

The Work Control Shift Foreman (WCSFM) has requested you to hang a clearance in an area where the known radiation dose rate is 280 mrem/hr. Your current year exposure history, according to your NRC Form 4 is as follows:

  • Committed Dose Equivalent (CDE) 10 mrem
  • Committed Effective Dose Equivalent (CEDE) 200 mrem
  • Eye Dose Equivalent (LDE) 20 mrem
  • Shallow Dose Equivalent (SDE) 5 mrem Initiating Cue:

The WCSFM has directed you to determine your maximum stay time in the High Radiation Area while hanging clearance before exceeding the DCPP Administrative Dose Guideline for Whole Body Total Effective Dose Equivalent (TEDE).

JPM TITLE:

STAY TIME DETERMINATION JPM NUMBER: NRCADM061-RC - RO ANSWER KEY ML082830905.DOC Page 27 of 66 REV. 0 Document Your Answer Here TEDE = DDE + CEDE TEDE = 400 mrem + 200 mrem TEDE = 600 mrem Margin = 2000 - 600 = 1400 mrem Stay time = Margin / Dose Rate 1400 mrem / 280 mrem/hr Stay time = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-COO-SRO1

Title:

Determination of Shift Staffing and Overtime Restrictions Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for SRO Candidates in a classroom setting.

References:

OM14.ID1, Overtime Restrictions, Rev. 12 Alternate Path:

Yes X

No X

Time Critical:

Yes No X

Time Allotment:

10 minutes Critical Steps:

1, 2, 3 Job Designation:

SRO K/A:

G 2.1.5; Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Rating:

3.9

JPM TITLE:

DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR WORKSHEET ML082830905.DOC Page 29 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OM14.ID1, Overtime Restrictions, Rev. 12 Initial Conditions:

Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue:

Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

Task Standard:

DO NOT READ TO STUDENTS: All Reactor Operators that can work the shift have been identified. This will be documented on the student handout.

JPM TITLE:

DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 30 of 6 REV. 0 Start Time:

Step Expected Operator Actions

    • 1.

Evaluates RO1 previous work schedule.

1.2 Identifies that following limit applies.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in 7 days.

1.3 Determines that RO1 is not eligible. **

Note: This limit will be exceeded after working today.

Step was: Sat: ______ Unsat _______*

    • 2.

Evaluates RO2 previous work schedule.

2.1 Determines that no limits have been exceeded.

2.2 Determines that RO2 is eligible. **

Step was: Sat: ______ Unsat _______*

    • 3.

Evaluates RO3 previous work schedule.

3.1 Identifies that following limit applies.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

3.2 Determines that RO3 is not eligible. **

Note: This limit will be exceeded after working today.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-COO-SRO1 EXAMINEE CUE SHEET ML082830905.DOC Page 31 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue:

Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

Previous Work Schedule:

Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900 RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100 Reactor Operator(s) eligible to work June 16th Yes No RO1

[ ]

[ ]

RO2

[ ]

[ ]

RO3

[ ]

[ ]

JPM TITLE:

DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 32 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ANSWER KEY ML082830905.DOC Page 33 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. You are the Unit 1 Shift Foreman and one of the Reactor Operators assigned to work in the control room has called in sick. You have been assigned to find a replacement Reactor Operator.

Initiating Cue:

Assuming today is June 16th, based on their work hour history, evaluate whether any of the following 3 Reactor Operators could work from 0700 to 1900 today without advanced approval.

JPM TITLE: DETERMINATION OF SHIFT STAFFING AND OVERTIME RESTRICTIONS JPM NUMBER: NRCADM061-COO-SRO1 ANSWER KEY ML082830905.DOC Page 34 of 6 REV. 0 Previous Work Schedule:

Mon Tues Wed Thurs Fri Sat Sun Mon Operator June 9 June 10 June 11 June 12 June 13 June 14 June 15 June 16 RO1 OFF 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 0700-1900 RO2 0700-1900 0700-1900 0700-1900 0700-1900 OFF 0700-1900 0700-1900 RO3 OFF 0700-1700 0700-1700 0700-1700 0700-1700 OFF 0700-2100 Reactor Operator(s) eligible to work June 16th Yes No RO1

[ ]

[X]

RO2

[X]

[ ]

RO3

[ ]

[X]

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-COO-SRO2

Title:

Approve Movement of Spent Fuel Assemblies Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for SRO Candidates in a classroom setting.

References:

OP B-8DS3, Insert Shuffle Within the Spent Fuel Pool, Rev. 18 Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Alternate Path:

Yes X

No Time Critical:

Yes No X

Time Allotment:

15 minutes Critical Steps:

1, 2, 3, 4 Job Designation:

SRO K/A:

G 2.1.40; Knowledge of refueling administrative requirements.

Rating:

3.9

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET ML082830905.DOC Page 36 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

Tech Spec 3.7.17, Spent Fuel Assembly Storage, Rev. 9 Initial Conditions:

Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue:

You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.

Task Standard:

DO NOT READ TO STUDENTS: Determination of proper storage location for each fuel assembly in made. This will be documented on the student handout.

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 37 of 6 REV. 0 Start Time:

Step Expected Operator Actions

    • 1. Determine if Element K-24 can be placed in the Cask Pit Storage Rack.

2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.1 Determines that Decay time is less than allowable limit.

2.1 Determines that the assembly should not be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

    • 2. Determine if Element F-06 can be placed in the Cask Pit Storage Rack.

2.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 2.2 Determines that Decay time meets allowable limit.

2.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

    • 3. Determine if Element G-17 can be placed in the Cask Pit Storage Rack.

3.1 Determines that the assembly discharge burn up and Initial Enrichment is in the Unacceptable region on Figure 3.7.17-4 3.2 Determines that Decay time meets the allowable limit.

3.3 Determines that the assembly should not be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 38 of 6 REV. 0

    • 4. Determine if Element D-32 can be placed in the Cask Pit Storage Rack.

4.1 Determines that the assembly discharge burn up and Initial Enrichment is in the acceptable region on Figure 3.7.17-4 4.2 Determines that Decay time meets allowable limit.

4.3 Determines that the assembly can be moved to the Cask Pit Storage Rack.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-COO-SRO2 EXAMINEE CUE SHEET ML082830905.DOC Page 39 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue:

You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed, based on the conditions given for each assembly.

Element Initial Enrichment (wt% U-235)

Discharge Burnup (GWd/mtU)

Decay Time (Years)

Allow or Dis-allow K-24 3.0 26 8

Allow [ ]

Dis-allow [ ]

F-06 3.25 23 12 Allow [ ]

Dis-allow [ ]

G-17 3.5 21 11 Allow [ ]

Dis-allow [ ]

D-32 3.5 25 14 Allow [ ]

Dis-allow [ ]

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 40 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER KEY ML082830905.DOC Page 41 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Reactor Engineering is planning to move several spent fuel assemblies from the permanent storage racks in the spent fuel pool to the new cask pit storage rack.

Initiating Cue:

You are the SRO assigned to review the proposed changes. Review each change and determine if the proposed move to the cask pit storage rack should be allowed or dis-allowed based on the conditions given for each assembly.

JPM TITLE:

APPROVE MOVEMENT OF SPENT FUEL ASSEMBLIES JPM NUMBER: NRCADM061-COO-SRO2 ANSWER KEY ML082830905.DOC Page 42 of 6 REV. 0 Element Initial Enrichment (wt% U-235)

Discharge Burnup (GWd/mtU)

Decay Time (Years)

Allow or Dis-allow K-24 3.0 26 8

Allow [ ]

Dis-allow [ X ]

F-06 3.25 23 12 Allow [ X ] Dis-allow [ ]

G-17 3.5 21 11 Allow [ ]

Dis-allow [ X ]

D-32 3.5 25 14 Allow [ X ] Dis-allow [ ]

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/24/2008 REV. 0 Number:

NRCADM061-EC-SRO

Title:

Evaluate Clearance Points and Tagging Requirements Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for SRO Candidates in a classroom setting.

References:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Alternate Path:

Yes X

No Time Critical:

Yes No X

Time Allotment:

15 minutes Critical Steps:

1, 2, 3 Job Designation:

SRO K/A:

G 2.2.13; Knowledge of tagging and clearance procedures.

Rating:

4.3

JPM TITLE:

DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR WORKSHEET ML082830905.DOC Page 44 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OP F-1:III, Service Cooling Water - Shutdown and Clearing, Rev. 16 OP2.ID2; Tagging Requirements, Rev. 12 OVID 106715, Sheet 2, Rev. 43 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

Task Standard:

DO NOT READ TO STUDENTS: All clearance points are identified with required position and proper tagging requirements. This will be documented on the student handout.

JPM TITLE:

DETERMINE CLEARANCE POINTS JPM NUMBER: NRCADM061-EC-SRO INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 45 of 6 REV. 0 Start Time:

Step Expected Operator Actions

    • 1. Identify breaker for isolation of SCWP 1-1, power supply is tagged incorrectly.

2.1 Identifies that a DANGER tag should be used for this component:

Step was: Sat: ______ Unsat _______*

    • 2. Identify discharge valve is required to be re-positioned for isolation of SCWP 1-1, check valve is not allowed isolation point.

2.2 Identifies the following valve should be CLOSED:

  • SCW-1-9 discharge valve Step was: Sat: ______ Unsat _______*
    • 3. Identify additional valve required to be opened to drain and vent SCWP 1-1.

3.2 Identifies the following valves OPEN.

  • SCW-1-423 pump discharge drain NOTE: Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.

3.2 Identifies that a CAUTION Tag should be used for this components.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-EC-SRO EXAMINEE CUE SHEET ML082830905.DOC Page 46 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 47 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY ML082830905.DOC Page 48 of 6 REV. 0 Initial Conditions:

Unit One is at 100% power. Maintenance is planned for SCW Pump 1-1 to replace the pump Impeller. A clearance requiring the pump to be isolated, vented and drained is required.

Initiating Cue:

The Work Control Shift Foreman has directed you to verify all the clearance points and their respective positions for this clearance, along with the appropriate tagging requirements. Document any discrepancies noted.

JPM

Title:

Determine Clearance Points JPM NUMBER: NRCADM061-EC-SRO ANSWER KEY ML082830905.DOC Page 49 of 6 REV. 0 CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT SCW PP-1-1 Control Switch OFF CBC 52-11D-05 SCW Pump 1-1 480 v Supply OPEN CAUTION SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-1 SCW Pump 1-1 Suction Valve CLOSED DANGER SCW 1-3 SCW Pump 1-1 Suction Drain Valve OPEN CAUTION SCW 1-5 SCW Pump 1-1 Casing Vent Valve OPEN CAUTION SCW-1-7 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Discrepancies found CLEARANCE POINT DESCRIPTION CLEARED POSITION TAGGING REQUIREMENT 52-11D-05 SCW Pump 1-1 480 v Supply OPEN DANGER SCW-1-9 not SCW-1-293 SCW Pump 1-1 Discharge Valve CLOSED DANGER SCW-1-423 SCW Pump 1-1 Discharge Drain Valve OPEN CAUTION Student may identify PJ-11-1, Breaker 5 as additional point; this is not required for work on the pump.

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/28/08 REV. 0 Number:

NRCADM061-EP-SRO

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

The simulator is not needed for the performance of this JPM.

References:

DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 35 Alternate Path:

Yes No X

Time Critical:

Yes No X

Time Allotment:

15 minutes Critical Steps:

2 Job Designation:

SRO K/A:

G 2.4.41; Knowledge of the emergency action level thresholds and classifications.

Rating:

4.6

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO Instructor Worksheet ML082830905.DOC Page 51 of 66 REV. 0 Directions:

No PLANT controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions, initiating cue, and task standard. The examiner will then ask if any clarifications are needed. The examinee may be given the applicable procedure and step with which to begin.

Required Materials:

DCPP Emergency Action Level Matrix EP G-1, Accident Classification and Emergency Plan Activation, Rev. 34 Initial Conditions:

Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE:

150 mR Thyroid CDE:

600 mR Initiating Cue:

Determine the proper event classification and report results to the Shift Manager.

Task Standard:

DO NOT READ TO STUDENT: The proper event classification is determined and the results reported to the Shift Manager.

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO Instructor Worksheet

  • Denotes an entry required on the JPM cover sheet.
    • Denotes Critical Step and Sub Steps.

ML082830905.DOC Page 52 of 66 REV. 0 Start Time:

Step Expected Operator Actions

1. Obtain correct procedure.

1.1 References DCPP Emergency Action Level Matrix or EP G-1.

Step was: Sat: _______ Unsat ______*

    • 2. DCPP Emergency Action Level Matrix or EP G-1.

2.1 Determines the Earthquake event is an ALERT (HA 1.1 or ALERT 17).

2.2 Determines the Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)**

Note: Order of classification is not important, final classification is critical step.

Step was: Sat: _______ Unsat ______*

3. Report Event Classification 3.1 Reports to Shift Manager an initial classification of Site Area Emergency.

Step was: Sat: _______ Unsat ______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM Number:

NRCADM061-EP-SRO Examinee Cue Sheet ML082830905.DOC Page 53 of 66 REV. 0 Initial Conditions:

Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE:

150 mR Thyroid CDE:

600 mR Initiating Cue:

Determine the proper event classification and report results to the Shift Manager.

Document Your Answer Here

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 54 of 66 REV. 0

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 55 of 66 REV. 0 The simulator is not needed for the performance of this JPM.

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 56 of 66 REV. 0 Initial Conditions:

Unit 1 is at 100% power. An earthquake of magnitude 0.23g has been felt in the control room and confirmed by PK 15-24 annuciator SEISMIC INSTR SYSTEM.

The auxiliary board operator reports that gas decay tank 11 was full and has suddenly depressurized. RE-14 and RE-14R have gone into alarm and investigation shows that they channel check and are reading Offscale high. RE-87 is currently reading 4.0E0 µCi/cc.

A Dose Assessment using EP R-2, Release of Airborne Radioactive Materials Initial Assessment has been performed using PPC Meteorological Data.

The following results are predicted at the site boundary:

TEDE:

150 mR Thyroid CDE:

600 mR Initiating Cue:

Determine the proper event classification and report results to the Shift Manager.

Document Your Answer Here Earthquake event is an ALERT (HA 1.1 or ALERT 17).

Gas Decay Tank Release event is a SITE AREA EMERGENCY (RS 1.2 or SAE 3)

EVENT CLASSIFICATION IS: SITE AREA EMERGENCY (RS 1.2 or SAE 3)

JPM

Title:

CLASSIFY AN EARTHQUAKE WITH A RADIATION RELEASE JPM Number:

NRCADM061-EP-SRO, Simulator Setup ML082830905.DOC Page 57 of 66 REV. 0

NUCLEAR POWER GENERATION DIABLO CANYON POWER PLANT JOB PERFORMANCE MEASURE AUTHOR:

DAVID BURNS DATE:

01/28/2008 REV. 0 Number:

NRCADM061-RC-SRO

Title:

Authorize Gas Decay Tank Discharge Examinee:

Evaluator:

Print Signature Date Results:

Sat Unsat Total Time:

minutes Comments:

Designed for SRO Candidates in a classroom setting.

References:

OP G-2:V, Gaseous Radwaste System - Gas Decay Tank Discharge, Rev. 10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Alternate Path:

Yes X

No Time Critical:

Yes No X

Time Allotment:

20 minutes Critical Steps:

4 Job Designation:

SRO K/A:

G 2.3.6; Ability to approve release permits.

Rating:

3.8

JPM TITLE:

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR WORKSHEET ML082830905.DOC Page 59 of 6 REV. 0 Directions:

No plant controls or equipment are to be operated during the performance of this Job Performance Measure. All actions taken by the examinee should be clearly demonstrated and verbalized to the evaluator. The student will be given the initial conditions and initiating cue. The examiner will then ask if any clarifications are needed. After identifying the appropriate procedure for the task, the examinee may be given the procedure and told the step with which to begin.

Required Materials:

OP G-2:V, Gaseous Radwaste System - Gas Decay tank Discharge, Rev.

10 CAP A-6; Gaseous Radwaste Discharge Management, Rev. 29 Completed Attachment 11.1 Initial Conditions:

RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue:

As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Task Standard:

DO NOT READ TO STUDENTS: 2 Technical errors are identified and discharge authorization is not approved. This will be documented on the student handout.

JPM TITLE:

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO INSTRUCTOR WORKSHEET

  • Denotes an entry required on the JPM cover sheet.
    • Denotes a Critical Step.

ML082830905.DOC Page 60 of 6 REV. 0 Start Time:

Step Expected Operator Actions

1. Review Sample Information and Analysis information for accuracy.

2.1 Identifies that a second sample of the GDT should have been done, since RE-22 is inoperable.

Step was: Sat: ______ Unsat _______*

2.

Review Release Authorization (CHEM) for accuracy.

2.3 Determines that Release Authorization (CHEM) is correct.

Step was: Sat: ______ Unsat _______*

3. Review Release Information and Approval for accuracy.

3.3 Identifies that Gas Decay Tank Pressure has decreased by 6 psig.

Step was: Sat: ______ Unsat _______*

    • 4. Determine if Authorization should be approved.

4.1 Determines that the Authorization should not be approved, based on either condition not meeting the procedural requirements.

Step was: Sat: ______ Unsat _______*

Stop Time:

Total Time:

(Enter total time on the cover page)

JPM NUMBER: NRCADM061-RC-SRO EXAMINEE CUE SHEET ML082830905.DOC Page 61 of 6 REV. 0 Initial Conditions:

RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue:

As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Technical Errors Identified:

[ ] APPROVE Discharge

[ ] DO NOT Approve Discharge

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 62 of 6 REV. 0 The simulator is not needed for the performance of this JPM.

AUTHORIZE GAS DECAY TANK DISCHARGE JPM NUMBER: NRCADM061-RC-SRO ATTACHMENT 1, SIMULATOR SETUP ML082830905.DOC Page 63 of 6 REV. 0 Initial Conditions:

RE-22, Gaseous Discharge Radiation Monitor was declared inoperable on June 6th, 2008 @ 1350 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.13675e-4 months <br />.

It is June 16th, 2008. You are the Unit 1 Shift Foreman. Gas Decay Tank 1-1 is planned to be discharged today on your watch.

You have just received the Authorization for a Gas Decay Tank Discharge attachment from CAP A-6, from the control operator for your final approval.

Initiating Cue:

As the Unit 1 Shift Foreman review the discharge authorization form for accuracy and completeness. Document any discrepancies noted and determine if the discharge should be approved or not approved based on your review.

Technical Errors Identified:

Section 1: Second sample not completed, required when RE-22 is Inoperable.

P&L 5.3 and Step 6.1.2.b.4 Section 2: Pressure in Gas Decay Tank has dropped 6 PSIG, Discharge Shall not be performed.

P&L 5.8

[ ] APPROVE Discharge

[ X ] DO NOT Approve Discharge

69-9351 07/25/02 Page 64 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:

Authorization for Gas Decay Tank Discharge Parts 1 and 2 of this form must be completed prior to release of a GDT batch. Part 3 must be completed by the Shift Foreman supervising the release. Return the completed form to Chemistry.

1.

SAMPLE INFORMATION AND ANALYSIS Unit #

1

a.

GDT No.

1-1 Tank Pressure 98 psig

b.

Date/Time Sample Collected: First 06/15/2008 / 1505 Second N/A

c.

Sample Analysis Summary Nuclide Concentration, Ci/cc (ntp)

Nuclide Concentration, Ci/cc (ntp)

KR-85 1.26E-004

d.

Projected Dose at Site Boundary

1)

Gamma air dose 5.69E-008 mrad N/A mrad (Second Sample)

2)

Beta air dose 6.45-006 mrad N/A mrad (Second Sample)

e.

Projected Release Rate

1) t Q& =

1.8E+000 Ci/sec N/A Ci/sec (Second Sample)

2)

Percent of release rate limit =

0.0 N/A

% (Second Sample)

2.

RELEASE AUTHORIZATION (CHEM)

Expected reading (Above Background)

RE-22 4

cpm High alarm setpoint (Admin. Limit)

RE-22 7020 cpm GDT No.

1-1 is approved for discharge. OP1.DC2 applies.

The following additional requirements must be met prior to release:

Signed:

Joe Chemist Date/Time 06/15/2008 / 1800 Chemistry Supervision or Authorized Personnel Batch No.

2008-1-1

69-9351 07/25/02 Page 65 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:

Authorization for Gas Decay Tank Discharge

3.

RELEASE INFORMATION AND APPROVAL

a.

RE-22 instrument check Channel Check SAT UNSAT X

Source check reading N/A cpm Date/Time N/A / N/A RE-22 is OPERABLE [ ]. INOPERABLE [X ]

(if INOPERABLE, attach Caution Tag to FCV-410 and fill out an AR).

Date/Time Caution Tag attached to FCV-410 key 06/06/2008 / 1350 Date/Time 14-day period expires 06/20/2008 / 1350 Date/Time AR filled out 06/06/2008 / 1410

b.

Valve Alignment:

Signed Joe Operator Operator performing valve alignment Valve Number used:

Signed Ken Cando 1-FCV-404 Operator verifying valve alignment

c.

Gas Decay Tank Pressure prior to release 92 psig

d.

Approved Date/Time Shift Foreman

e.

Date/Time FCV-410 opened

/

f.

Date/Time release terminated

/

g.

GDT pressure after release psig

h.

Comments:

Signed

/

Operator Date/Time Reviewed

/

Shift Foreman Date/Time Noted Chemistry Supervision

69-9351 07/25/02 Page 66 of 2 DIABLO CANYON POWER PLANT 1AND 2 CAP A-6 ATTACHMENT 11.1 TITLE:

Authorization for Gas Decay Tank Discharge