ML17341A608: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML17341A608 | | number = ML17341A608 | ||
| issue date = 11/09/1981 | | issue date = 11/09/1981 | ||
| title = Responds to | | title = Responds to Re of Concern for Steam Generator Tube & Pressure Vessel Integrity.Sept Ltr Was Not Formal Petition | ||
| author name = Lorion J | | author name = Lorion J | ||
| author affiliation = CENTER FOR NUCLEAR RESPONSIBILITY | | author affiliation = CENTER FOR NUCLEAR RESPONSIBILITY | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8111130586 | | document report number = NUDOCS 8111130586 | ||
| title reference date = 11-05-1981 | |||
| package number = ML17341A609 | | package number = ML17341A609 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~ | {{#Wiki_filter:~ | ||
RKQULAII'QR<Y'NFORMAiTXONiDKBTRZBUTKON~ SYSTEMI | .o RKQULAII'QR<Y'NFORMAiTXONiDKBTRZBUTKON~ SYSTEMI (RlDS) | ||
ACCESSIOVr NBR" 8 1 1 1 HOi86'OC', O'AiTEIt: 81/1 1/09 NOT'ARL2KDt'- NO'DO'CKEITI 0'AGILL50: | |||
ACCESSIOVr NBR" 8 1 | 251-Tbj'ke'y Point~ P1ant<r. | ||
Un>>I ti 4i. Florida>> Powe) i andr Lighlt~ Cl 0509025<i. | |||
'AUTHI,NAMEI AUTHORI AFF lL>>I'AiTCON'LORGNON'r Jlo,, | |||
A,ffi 1 i a tel on>> Unl>>.'nown< | |||
'REC IP~ blAMEI RECEPT ENiTI AF FIL'CAiT'?ONI DENTON>>pHI.R'e: | |||
SUBJKCIT'tr R'ehponds~ | Officel of'gclebr | ||
~ Rebctoi'i R'eg,u;1atiioni>> D.ir actor> | |||
gehei | SUBJKCIT'tr R'ehponds~ to 811105 1tr | ||
~ r ei 810911 1tr | |||
~ of, concern for.'< steamI gehei atori tubel L. pr essur el vessell>> integri ty. S'e'pt~ 1tr | |||
TIITLEl:: Rbguhst> for NRR" A'ction>> (e>,gi2',20k'eti tiions) | ~ was not~ | ||
for mal i pet9 t6 on;.'XSTRrLBUTKGN CODElt: XEDSS'OPZEB< RECKIIVEOSLII'RI | |||
'NCLI J' TIITLEl:: Rbguhst> for | |||
< NRR" A'ction>> (e>,gi2',20k'eti tiions) Ii'bl NOTES;:: | |||
RECXPiENTI | SIZEIt: L< | ||
'te'd< | |||
GROII'ENHUZB' | Gbr r espondehcer RECXPiENTI | ||
MURRAiYr JI,; | , IOi COOK'/NAMEI ACTKONt: | ||
RES | ORSI 01>> BCI. | ||
GROII'ENHUZB'rMi 01>> | |||
TQII'ALr iVUMBERI OF: COP1ES> REQUIRED:: Lf'TRI | COPIES'<TII'Rl ENC LI fr RECIPXENiTI IDI CODEVNAMEI ORBI Pf LAI | ||
,,COPZEe LII'll'Rl ENGLI 1 | |||
1>> | |||
IN<TERNALit-'DOVACSI MURRAiYr JI,; | |||
RES FI ENTERNALi:: LPDR<< | |||
NS'LCI Y | |||
0.4. | |||
k O'er 05l 1>> | |||
f>> | |||
1>> | |||
1>> | |||
1>> | |||
i.l. | |||
f>> | |||
1. | |||
ELDI iVRRI D<TRI NRRVPPAS'RCI PDRI N<TK S" 02' f>> | |||
fv f< | |||
1 1>> | |||
f< | |||
TQII'ALr iVUMBERI OF: COP1ES> REQUIRED:: Lf'TRI 14 ENCLl 14' | |||
4 | 4 Il F | ||
I 0 | |||
l | |||
~>> | |||
il i | I | ||
lii t | ~ | ||
1. | ~ '>>>> | ||
4 il i | |||
I ti >>>> | I n | ||
ii A | r P | ||
li I | |||
''l h | |||
lii t 1. | |||
~ '" | |||
I>> | |||
I ti >>>> | |||
I. | |||
ii A 1 | |||
I I | |||
eg'(pg | ) | ||
CNR eg'(pg us el'opg g | |||
us | cob~(gg~logg II I+ | ||
CENTER FOR NUCLEA,R RESPONSIBILITY | CENTER FOR NUCLEA,R RESPONSIBILITY ~-45/ | ||
November 9, 1981 Certified Nail: Return Receipt Requested Mr, harold R. Denton Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Coaanission Washington, D.C. | |||
November 9, 1981 Certified Nail: Return Receipt | 20555 | ||
==Dear Mr. Benton,== | ==Dear Mr. Benton,== | ||
This is in response to your letter to me and Director's Decision Under 10 CFR 2.206 dated November 5,1981, Please be advised that my letter of September 11,1981, on behalf of the Center for Nuclear Responsibility and concerning steam generator'ube integrity and pressure vessel embrittlement in Turkey Point Unit g4, was not a formal petition under 10 CFR 2.206 of the Commission's Regulations. | |||
This is in response to your letter to me and Director's Decision Under 10 CFR 2.206 dated November 5,1981, Please be advised that my letter of September 11,1981, on behalf of the Center for Nuclear Responsibility and concerning steam integrity and pressure vessel embrittlement in Turkey Point | The September 11th letter was merely advisory and intended to bring to your attention potential safety and legal problems associated with the continued operation of this severely degraded nuclear unit. It was never my intention, nor that of the Center for Nuclear Responsibility, that this letter be treated as a | ||
The September 11th letter was merely advisory and intended to bring to your attention potential safety and legal problems associated with the continued operation of this severely degraded nuclear unit. It was never my intention, nor that of the Center for Nuclear Responsibility, that this letter be treated as a formal legal petition in accordance with 10 CFR 2.206 of the Commission's Regulations. | formal legal petition in accordance with 10 CFR 2.206 of the Commission's Regulations. | ||
Should the Center fox Nuclear Responsibility decide to initiate a formal petition for consideration of license review or possible shutdown of Turkey Point Nuclear Unit Jj4, our petition will be labled a petition in accordance with the rules | ~ | ||
Should the Center fox Nuclear Responsibility decide to initiate a formal petition for consideration of license review or possible shutdown of Turkey Point Nuclear Unit Jj4, our petition will be labled a petition in accordance with the rules of practice under 10 CFR 2.206 of the Commission's Regulations and will have representation of counsel. | |||
Respectfully yours, ciCOUkj gc,'bn Joette Lorion Research Director CNR | Respectfully yours, ciCOUkj gc,'bn Joette Lorion Research Director CNR | ||
==Enclosure:== | ==Enclosure:== | ||
cc w/ encl. | cc w/ encl. | ||
Letter Sept. 11,1981 8iiif30586 | Letter Sept. | ||
11,1981 8iiif30586 Siii09 | |||
[ | [ | ||
xP~ | PDR ADOCK 0500025l H | ||
PDR xP~ | |||
5] | 5] | ||
) | |||
7210 Red Road | 7210 Red Road Room 208 South Miami, Fl. | ||
33143 305-66.I-P.I 65 | |||
4 I | 4 I | ||
~ y | |||
Robert E. Urig Florida Power | |||
Tallahassee, Florida 32304 Mr. Robert Lowenstein, Esquire | & Light Company Mr. Jack Shreeve Office of Public Counsel Room 4, Holland Bldg. | ||
P.O. Box 013100 | Tallahassee, Florida 32304 Mr. Robert Lowenstein, Esquire Lowenstein, Newman Reiss and Axlerod 1025 Connecticut | ||
Honorable Dewey Knight | : Avenue, N.W. | ||
Atlanta, Georgia 30308}} | Suite 1214 Washington, D.C. 20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire Steel Hector and Davis 1400 Southeast First National Bank Miami, Florida 33131 Mr. Henry Y~er, Plant Manager Turkey Point Plant Florida Power 6 Light Co. | ||
P.O. | |||
Box 013100 Miami, Florida. 33101 Honorable Dewey Knight County Manager of Metropolitan Dade County Miami, Florida 33130 Bureau of Intergovernmental Relations 660 Apalachee Parkwy Tallahassee, Florida 32304 Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 Regional Radiation Representative EPA Region IV 345 Courtland Street N.W. | |||
Atlanta, Georgia 30308 Administrator Department of Environmental Regulation Power Plant Siting State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Martin Hodder, Esquire 1131 NE 86 Street Miami, Florida 33138 Robert Pollard Union of Concerned Scientists 1725 I St. | |||
NW f601 Washington, D.C. 20006 Dr. Gordon Edwards Canadian Coalition.for Nuclear Responsibi1ity. | |||
CP 236 Succursale Snowdon Montreal. | |||
Quebec 53X 3T4 U.S;. | |||
NRC Region II Atlanta, 0eorgia 30303 Marshall Grautenhuis U.S. Nuclear Regulatory Commission Washington, D.C. 20555}} | |||
Latest revision as of 12:30, 7 January 2025
| ML17341A608 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/09/1981 |
| From: | Lorion J CENTER FOR NUCLEAR RESPONSIBILITY |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17341A609 | List: |
| References | |
| NUDOCS 8111130586 | |
| Download: ML17341A608 (5) | |
Text
~
.o RKQULAII'QR<Y'NFORMAiTXONiDKBTRZBUTKON~ SYSTEMI (RlDS)
ACCESSIOVr NBR" 8 1 1 1 HOi86'OC', O'AiTEIt: 81/1 1/09 NOT'ARL2KDt'- NO'DO'CKEITI 0'AGILL50:
251-Tbj'ke'y Point~ P1ant<r.
Un>>I ti 4i. Florida>> Powe) i andr Lighlt~ Cl 0509025<i.
'AUTHI,NAMEI AUTHORI AFF lL>>I'AiTCON'LORGNON'r Jlo,,
A,ffi 1 i a tel on>> Unl>>.'nown<
'REC IP~ blAMEI RECEPT ENiTI AF FIL'CAiT'?ONI DENTON>>pHI.R'e:
Officel of'gclebr
~ Rebctoi'i R'eg,u;1atiioni>> D.ir actor>
SUBJKCIT'tr R'ehponds~ to 811105 1tr
~ r ei 810911 1tr
~ of, concern for.'< steamI gehei atori tubel L. pr essur el vessell>> integri ty. S'e'pt~ 1tr
~ was not~
for mal i pet9 t6 on;.'XSTRrLBUTKGN CODElt: XEDSS'OPZEB< RECKIIVEOSLII'RI
'NCLI J' TIITLEl:: Rbguhst> for
< NRR" A'ction>> (e>,gi2',20k'eti tiions) Ii'bl NOTES;::
SIZEIt: L<
'te'd<
Gbr r espondehcer RECXPiENTI
, IOi COOK'/NAMEI ACTKONt:
ORSI 01>> BCI.
GROII'ENHUZB'rMi 01>>
COPIES'<TII'Rl ENC LI fr RECIPXENiTI IDI CODEVNAMEI ORBI Pf LAI
,,COPZEe LII'll'Rl ENGLI 1
1>>
IN<TERNALit-'DOVACSI MURRAiYr JI,;
RES FI ENTERNALi:: LPDR<<
NS'LCI Y
0.4.
k O'er 05l 1>>
f>>
1>>
1>>
1>>
i.l.
f>>
1.
ELDI iVRRI D<TRI NRRVPPAS'RCI PDRI N<TK S" 02' f>>
fv f<
1 1>>
f<
TQII'ALr iVUMBERI OF: COP1ES> REQUIRED:: Lf'TRI 14 ENCLl 14'
4 Il F
I 0
l
~>>
I
~
~ '>>>>
4 il i
I n
r P
li I
l h
lii t 1.
~ '"
I>>
I ti >>>>
I.
ii A 1
I I
)
CNR eg'(pg us el'opg g
cob~(gg~logg II I+
CENTER FOR NUCLEA,R RESPONSIBILITY ~-45/
November 9, 1981 Certified Nail: Return Receipt Requested Mr, harold R. Denton Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Coaanission Washington, D.C.
20555
Dear Mr. Benton,
This is in response to your letter to me and Director's Decision Under 10 CFR 2.206 dated November 5,1981, Please be advised that my letter of September 11,1981, on behalf of the Center for Nuclear Responsibility and concerning steam generator'ube integrity and pressure vessel embrittlement in Turkey Point Unit g4, was not a formal petition under 10 CFR 2.206 of the Commission's Regulations.
The September 11th letter was merely advisory and intended to bring to your attention potential safety and legal problems associated with the continued operation of this severely degraded nuclear unit. It was never my intention, nor that of the Center for Nuclear Responsibility, that this letter be treated as a
formal legal petition in accordance with 10 CFR 2.206 of the Commission's Regulations.
~
Should the Center fox Nuclear Responsibility decide to initiate a formal petition for consideration of license review or possible shutdown of Turkey Point Nuclear Unit Jj4, our petition will be labled a petition in accordance with the rules of practice under 10 CFR 2.206 of the Commission's Regulations and will have representation of counsel.
Respectfully yours, ciCOUkj gc,'bn Joette Lorion Research Director CNR
Enclosure:
cc w/ encl.
Letter Sept.
11,1981 8iiif30586 Siii09
[
PDR ADOCK 0500025l H
PDR xP~
5]
)
7210 Red Road Room 208 South Miami, Fl.
33143 305-66.I-P.I 65
4 I
~ y
Robert E. Urig Florida Power
& Light Company Mr. Jack Shreeve Office of Public Counsel Room 4, Holland Bldg.
Tallahassee, Florida 32304 Mr. Robert Lowenstein, Esquire Lowenstein, Newman Reiss and Axlerod 1025 Connecticut
- Avenue, N.W.
Suite 1214 Washington, D.C. 20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire Steel Hector and Davis 1400 Southeast First National Bank Miami, Florida 33131 Mr. Henry Y~er, Plant Manager Turkey Point Plant Florida Power 6 Light Co.
P.O.
Box 013100 Miami, Florida. 33101 Honorable Dewey Knight County Manager of Metropolitan Dade County Miami, Florida 33130 Bureau of Intergovernmental Relations 660 Apalachee Parkwy Tallahassee, Florida 32304 Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 Regional Radiation Representative EPA Region IV 345 Courtland Street N.W.
Atlanta, Georgia 30308 Administrator Department of Environmental Regulation Power Plant Siting State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Martin Hodder, Esquire 1131 NE 86 Street Miami, Florida 33138 Robert Pollard Union of Concerned Scientists 1725 I St.
NW f601 Washington, D.C. 20006 Dr. Gordon Edwards Canadian Coalition.for Nuclear Responsibi1ity.
CP 236 Succursale Snowdon Montreal.
Quebec 53X 3T4 U.S;.
NRC Region II Atlanta, 0eorgia 30303 Marshall Grautenhuis U.S. Nuclear Regulatory Commission Washington, D.C. 20555