=Text= | =Text= | ||
{{#Wiki_filter:, l ~e Pennsylvania Power | {{#Wiki_filter:, l~e Pennsylvania Power 8 Light Company Two North Ninth Street ~Allentown, PA 18101-1179 ~ 215/774-5151 April 9, 1992 | ||
'r. | |||
D. | |||
R. Jackson Susquehanna River Hasin Commission 1721 North'ront Street Harrisburg, PA 17102-2391 SUSQUEHANNA STEAM ELECTRIC STATION EMERGENCY WATER USE PERMIT CCN 741326 FILE R9-3 PLE-15461 | |||
==Dear Hr. Jackson:== | ==Dear Hr. Jackson:== | ||
Pennsylvania Power Il Light Company (PPKL) requests approval to use a portion of the flow from an unnamed stream located at the Susquehanna Steam Electric Station over a two-day period during the week of April 13, 1992. | |||
Pennsylvania Power Il Light Company (PPKL) requests approval to use a portion of the flow from an unnamed stream located at the Susquehanna Steam Electric Station over a two-day period during the week of April 13, 1992. Sixty gallons of water per minute are needed to backwash a filter press as well as mix a flocculant aid to help dewater sewage sludge at this site's sewage treatment plant (STP). | Sixty gallons of water per minute are needed to backwash a filter press as well as mix a flocculant aid to help dewater sewage sludge at this site's sewage treatment plant (STP). | ||
Several options were evaluated for the source of water but because of the distance from other site facilities and the crossing of site roads, the stream which is within a few feet of the STP was the only reasonable choice. | Several options were evaluated for the source of water but because of the distance from other site facilities and the crossing of site roads, the stream which is within a few feet of the STP was the only reasonable choice. | ||
L As we | L As we discussed in our April 8, 1992 telephone conversation, a stream running adjacent to the STP at this time has a flow of between 110 and 120 gallons per minute. | ||
We | It runs through this 1,500 acre site eventually into a site recreation pond. | ||
There should be no adverse impact to the stream or pond from this two day activity. | |||
We estimate that this project will take approximately 12 hours over the two days. | |||
We request your approval for this project. | |||
If you have any questions, please call me at (215) 774-7889 or FAX No. | |||
(215) 774-7337. | |||
Sincerely, rome S. Fields | Sincerely, rome S. Fields | ||
. Environmental Scientist-Nuclear jsf/ltd156a(25) cc: | |||
NRC Document-'Control--.Desk NRC Region I Hr. J. J. Raleigh, NRC Project Manager Hr. S. J. | |||
: Lehman, PaDER | |||
9204150185 920409 PDR | . 2~$ 0GBJ 9204150185 920409 PDR ADOCK 05000387 P | ||
PDR | |||
~$ | |||
~ '0}} | |||
Latest revision as of 03:16, 7 January 2025
| ML18030A571 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/09/1992 |
| From: | Fields J PENNSYLVANIA POWER & LIGHT CO. |
| To: | Diane Jackson PENNSYLVANIA, COMMONWEALTH OF |
| References | |
| NUDOCS 9204150185 | |
| Download: ML18030A571 (1) | |
Text
, l~e Pennsylvania Power 8 Light Company Two North Ninth Street ~Allentown, PA 18101-1179 ~ 215/774-5151 April 9, 1992
'r.
D.
R. Jackson Susquehanna River Hasin Commission 1721 North'ront Street Harrisburg, PA 17102-2391 SUSQUEHANNA STEAM ELECTRIC STATION EMERGENCY WATER USE PERMIT CCN 741326 FILE R9-3 PLE-15461
Dear Hr. Jackson:
Pennsylvania Power Il Light Company (PPKL) requests approval to use a portion of the flow from an unnamed stream located at the Susquehanna Steam Electric Station over a two-day period during the week of April 13, 1992.
Sixty gallons of water per minute are needed to backwash a filter press as well as mix a flocculant aid to help dewater sewage sludge at this site's sewage treatment plant (STP).
Several options were evaluated for the source of water but because of the distance from other site facilities and the crossing of site roads, the stream which is within a few feet of the STP was the only reasonable choice.
L As we discussed in our April 8, 1992 telephone conversation, a stream running adjacent to the STP at this time has a flow of between 110 and 120 gallons per minute.
It runs through this 1,500 acre site eventually into a site recreation pond.
There should be no adverse impact to the stream or pond from this two day activity.
We estimate that this project will take approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> over the two days.
We request your approval for this project.
If you have any questions, please call me at (215) 774-7889 or FAX No.
(215) 774-7337.
Sincerely, rome S. Fields
. Environmental Scientist-Nuclear jsf/ltd156a(25) cc:
NRC Document-'Control--.Desk NRC Region I Hr. J. J. Raleigh, NRC Project Manager Hr. S. J.
- Lehman, PaDER
. 2~$ 0GBJ 9204150185 920409 PDR ADOCK 05000387 P
~$
~ '0