ML19330C068: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:" F
{{#Wiki_filter:"
  + _-- . o 400 Chestnut Street Tower II
F
* August 5, 1980 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
+ _--. o 400 Chestnut Street Tower II August 5, 1980 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Mr. Schwencer:==
==Dear Mr. Schwencer:==
                                                                          )
In the Matter of the Application of
In the Matter of the Application of           )     Docket Nos. 50-327 Tennessee Valley Authority                     )                   50-328                   j As requested by J. Buzy of the Operator Licensing Branch, enclosed (enclosure
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 j
As requested by J. Buzy of the Operator Licensing Branch, enclosed (enclosure
: 1) is a copy of the Sequoyah Nuclear Plant Requalification Training Program which was conducted earlier this year. This program provides the required operator training in heat transfer, fluid flow, thermodynamics, and plant transients. Days two and three of the program cover heat trcnsfer, fluid flow, and thermodynamics. Days four and five cover plant transients.
: 1) is a copy of the Sequoyah Nuclear Plant Requalification Training Program which was conducted earlier this year. This program provides the required operator training in heat transfer, fluid flow, thermodynamics, and plant transients. Days two and three of the program cover heat trcnsfer, fluid flow, and thermodynamics. Days four and five cover plant transients.
Also, TVA was requested to provide documentation of compliance with                           l NUREG-0694, Item I.A.3.1 (paragraph 1) on revised scope and criteria for                     {
Also, TVA was requested to provide documentation of compliance with NUREG-0694, Item I.A.3.1 (paragraph 1) on revised scope and criteria for
license exams. Enclosure 2 is the requested documentation.                                   '
{
license exams. Enclosure 2 is the requested documentation.
Very truly yours, TENNESSEE VALLEY AUTHORITY
Very truly yours, TENNESSEE VALLEY AUTHORITY
                                                                . J'n1 n; Panagen N   . M. Mills, O%
'n n O%
Nuclear Regulation and Safety Enclosures
. J 1
_:    ;
; Panagen N
l 1
. M. Mills, Nuclear Regulation and Safety Enclosures 1
g oo3         ,
g oo3 THIS DOCUMENT CONTAINS s,
s,        l THIS DOCUMENT CONTAINS POOR QUAUTY PAGES                                                                   f//
POOR QUAUTY PAGES f//
Ado:     6t Gs.
Ado:
8008070 A, Q,,e           ;
6t Gs.
8008070 A, Q,,e


o   ..
o ENCLOSURE 2 SEQUOYAH NUCLEAR PLANT NUREG-0694 - ITEM I.A.3.1 (PARAGRAPH 1)
ENCLOSURE 2 SEQUOYAH NUCLEAR PLANT NUREG-0694 - ITEM I.A.3.1 (PARAGRAPH 1)
Requirement Applicants for operator licenses will be required to grant permission to the NRC to inform their facility management regarding the results of examinations.
Requirement Applicants for operator licenses will be required to grant permission to the NRC to inform their facility management regarding the results of examinations.


Line 45: Line 51:
Applicants will grant permission to NRC to inform their facility management regarding the results of the RO and SRO examinations.
Applicants will grant permission to NRC to inform their facility management regarding the results of the RO and SRO examinations.
t
t
                    ,}}
,}}

Latest revision as of 04:58, 31 December 2024

Forwards Requalification Training Program, Wk 1,1980. Also Provides Documentation of Compliance w/NUREG-0694,Item I.A.3.1 Re Revised Scope & Criteria for License Exams
ML19330C068
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/05/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19330C069 List:
References
NUDOCS 8008070508
Download: ML19330C068 (2)


Text

"

F

+ _--. o 400 Chestnut Street Tower II August 5, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Schwencer:

In the Matter of the Application of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 j

As requested by J. Buzy of the Operator Licensing Branch, enclosed (enclosure

1) is a copy of the Sequoyah Nuclear Plant Requalification Training Program which was conducted earlier this year. This program provides the required operator training in heat transfer, fluid flow, thermodynamics, and plant transients. Days two and three of the program cover heat trcnsfer, fluid flow, and thermodynamics. Days four and five cover plant transients.

Also, TVA was requested to provide documentation of compliance with NUREG-0694, Item I.A.3.1 (paragraph 1) on revised scope and criteria for

{

license exams. Enclosure 2 is the requested documentation.

Very truly yours, TENNESSEE VALLEY AUTHORITY

'n n O%

. J 1

Panagen N

. M. Mills, Nuclear Regulation and Safety Enclosures 1

g oo3 THIS DOCUMENT CONTAINS s,

POOR QUAUTY PAGES f//

Ado:

6t Gs.

8008070 A, Q,,e

o ENCLOSURE 2 SEQUOYAH NUCLEAR PLANT NUREG-0694 - ITEM I.A.3.1 (PARAGRAPH 1)

Requirement Applicants for operator licenses will be required to grant permission to the NRC to inform their facility management regarding the results of examinations.

Response

TVA's Division Procedures Manual (DPM) No. N78A13 (June 1960 draft) states the following.

Applicants will grant permission to NRC to inform their facility management regarding the results of the RO and SRO examinations.

t

,