ML19330C419: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML19330C419
| number = ML19330C419
| issue date = 07/30/1980
| issue date = 07/30/1980
| title = Forwards Supplementary Info for 800718 Ltr Re Preliminary Calculations for Review of Nuclear Plants Structural Design. Defines Lower Bound Ultimate Venting Pressure
| title = Forwards Supplementary Info for Re Preliminary Calculations for Review of Nuclear Plants Structural Design. Defines Lower Bound Ultimate Venting Pressure
| author name = Greimann L
| author name = Greimann L
| author affiliation = AMES LABORATORY, ENERGY & MINERAL RESOURCES RESEARCH
| author affiliation = AMES LABORATORY, ENERGY & MINERAL RESOURCES RESEARCH
Line 12: Line 12:
| case reference number = CON-FIN-A-4131
| case reference number = CON-FIN-A-4131
| document report number = NUDOCS 8008080359
| document report number = NUDOCS 8008080359
| title reference date = 07-18-1980
| package number = ML19330C420
| package number = ML19330C420
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, RESEARCH INSTITUTION/LABORATORY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, RESEARCH INSTITUTION/LABORATORY TO NRC
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:m lowa State University         Ames, Iowa 50011 HIIIe5 E Energy lahornfor         & Mineral Resource                            July 30, 1980
{{#Wiki_filter:m E Energy & Mineral Resource lowa State University Ames, Iowa 50011 HIIIe5 lahornfor July 30, 1980
                                                                                          .~,
.~,
Dr. F. P. Schauer, Chief                                                         ' '.
Dr. F. P. Schauer, Chief Structural Engineering Branch Division of Systems Safety Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555 1
Structural Engineering Branch Division of Systems Safety                                           '
Office of Nuclear Reactor Regulation                                                   -
Nuclear Regulatory Commission                                                   --
Washington, DC 20555                                                   ,,,      ._,      1


==SUBJECT:==
==SUBJECT:==
AMES LABORATORY TECHNICAL ASSISTANCE TO THE DIVISION OF SYSTEM SAFETY, NUCLEAR REACTOR REGULATION                     " REVIEW 0F NUCLEAR PLANTS STRUCTURAL DESIGN" (FIN N0. A-4131).
AMES LABORATORY TECHNICAL ASSISTANCE TO THE DIVISION OF SYSTEM SAFETY, NUCLEAR REACTOR REGULATION
" REVIEW 0F NUCLEAR PLANTS STRUCTURAL DESIGN" (FIN N0. A-4131).
PRELIMINARY CALCULATIONS-ULTIMATE STRENGTH FOR HYDROGEN EXPL0SION, SEQUOYAH CONTAINMENT VESSEL. SUPPLEMENT
PRELIMINARY CALCULATIONS-ULTIMATE STRENGTH FOR HYDROGEN EXPL0SION, SEQUOYAH CONTAINMENT VESSEL. SUPPLEMENT


==Dear Dr. Schauer:==
==Dear Dr. Schauer:==
 
Enclosed please find a supplement to my report of July 18, 1980 on the subject preliminary calculations The primary motivation for the supplement is to define a lower bound ultimate venting pressure as 31 psi.
Enclosed please find a supplement to my report of July 18, 1980 on the subject preliminary calculations The primary motivation for the supplement is to define a lower bound ultimate venting pressure as 31 psi. (The original report defined a best esti-mate ultimate venting pressure of 51 psi.)
(The original report defined a best esti-mate ultimate venting pressure of 51 psi.)
If you have any questions, please contact me.
If you have any questions, please contact me.
Sincerely yours, Lowell F. Greimann Project Engineer                                         !
Sincerely yours, Lowell F. Greimann Project Engineer Enclosure cc (with encl.): -Director, Division of System Safety Attn:
Enclosure cc (with encl.): -Director, Division of System Safety Attn: B. L. Grenier
B. L. Grenier
                              -Delwyn D. Bluhm, Head, Project Engineering xoo3 5
-Delwyn D. Bluhm, Head, Project Engineering xoo3 5
                                                                                                    //O   j 8003060 N Under Contract With The United States Department Of Energy L_}}
//O j
8003060 N Under Contract With The United States Department Of Energy L_}}

Latest revision as of 04:53, 31 December 2024

Forwards Supplementary Info for Re Preliminary Calculations for Review of Nuclear Plants Structural Design. Defines Lower Bound Ultimate Venting Pressure
ML19330C419
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/30/1980
From: Greimann L
AMES LABORATORY, ENERGY & MINERAL RESOURCES RESEARCH
To: Schauer F
Office of Nuclear Reactor Regulation
Shared Package
ML19330C420 List:
References
CON-FIN-A-4131 NUDOCS 8008080359
Download: ML19330C419 (1)


Text

m E Energy & Mineral Resource lowa State University Ames, Iowa 50011 HIIIe5 lahornfor July 30, 1980

.~,

Dr. F. P. Schauer, Chief Structural Engineering Branch Division of Systems Safety Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555 1

SUBJECT:

AMES LABORATORY TECHNICAL ASSISTANCE TO THE DIVISION OF SYSTEM SAFETY, NUCLEAR REACTOR REGULATION

" REVIEW 0F NUCLEAR PLANTS STRUCTURAL DESIGN" (FIN N0. A-4131).

PRELIMINARY CALCULATIONS-ULTIMATE STRENGTH FOR HYDROGEN EXPL0SION, SEQUOYAH CONTAINMENT VESSEL. SUPPLEMENT

Dear Dr. Schauer:

Enclosed please find a supplement to my report of July 18, 1980 on the subject preliminary calculations The primary motivation for the supplement is to define a lower bound ultimate venting pressure as 31 psi.

(The original report defined a best esti-mate ultimate venting pressure of 51 psi.)

If you have any questions, please contact me.

Sincerely yours, Lowell F. Greimann Project Engineer Enclosure cc (with encl.): -Director, Division of System Safety Attn:

B. L. Grenier

-Delwyn D. Bluhm, Head, Project Engineering xoo3 5

//O j

8003060 N Under Contract With The United States Department Of Energy L_