ML20004D566: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000259/LER-1981-016, Updated LER 81-016/01T-1:on 810501,during Test,Fire Pump Automatic Start Logic Found Inoperable.Caused by Wiring Removed from Terminal Points in Main Relay Panel 52,during Mod of Panel.Permanent Wire Replaced.Work Plan Revised]]
| number = ML20004D566
| issue date = 06/05/1981
| title = Updated LER 81-016/01T-1:on 810501,during Test,Fire Pump Automatic Start Logic Found Inoperable.Caused by Wiring Removed from Terminal Points in Main Relay Panel 52,during Mod of Panel.Permanent Wire Replaced.Work Plan Revised
| author name =
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000259
| license number =
| contact person =
| document report number = LER-81-016-01T, LER-81-16-1T, NUDOCS 8106090537
| package number = ML20004D560
| document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT
| page count = 2
}}
 
=Text=
{{#Wiki_filter:~
1 1
I
    ""cro"              h      , Update R2 port - Prsvious Report Data                                        5/12/81                  U. S. NUCLE AR REGULATORY COMMISSION LICENSEE EVENT REPORT o
bCONTROL8tOCK;l                              l      l    l    l  l lh                  (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo ltlatl >Al LlLICENSEE B l RlCODE      Fl 1 l@l 01$ l 0 l- l 0 l 0LICENSE le l 0 lNUMBER 0 l 0 l- l 0 l 0 l@l    25 426 l 1 LICENSE l 1 l 1TYPE  l 1JOl@l 57 CAT l 58 l@          l CON'T CL I1.J                [,n"C      l60L @l610 l 5 l 00CKET        0 l 0NUMBER l012 l 5 l 968 @l69 015EVENT        lo l1    l 811 74l@l75016REPORT        l 0 ] DATE 5 l 8 l180l@
    /        3                                                                                                          DATE EVENT DESCRl* TION AND PROBABLE CONSEQUENCES h l o l 2 l l During post-modification tests on a new sprinkler system. the fire oumo automatic                                                                                        I go l3; l start logic was found inoperable.                                                T.S. 3.11..A.l.b requires operable logic. One fire I
    .[ o l 4 ; Ipump was running at the time the inoperability was discovered. The pump was kept                                                                                          l I
io ls; l running while the automatic-start circuit was repaired. Manual start capability                                                                                            ]
Io is ] lwas operable. Units 1, 2, and 3 were affected. There was no danster to the health                                                                                            l lolij jor safety of the public. There are no redundant systems. There were no previous                                                                                              I iojg; lsimilar events.                                                                                                                                                              I i      a9                                                                                                                                                                      80 JYSTEM              CAUSE          CAUSE                                                    COMP.          VALV E CODE              CODE        SUSCODE                  COMPONENT CODE                    SUSCODE          SU8 CODE mp        el i A l B10 l@ l A l@ l X l @ l Z ] Z l Z l Z l Z l Z l@ [Z_J @ [Z_l 9                      11            12            13                            18          19              20
_                                          SEQUEN TI AL                      OCCURRENCE            REPORT                      REVISION LERiRO        EVENT YE4R                                REPORT No.                            CODE                TYPE                        N O.
                    @ aEPORT                l 8l 1l              l_l            l 0l 1l 6l              l/l          l0l1l                  l Tl          l-l        [1]
21        22          23            24            26        27          28        29          30            31          32 TAK N AC O                      O PLANT            MET                      HOURS 22        S8 i            FOR        8.      SUPPL E            MANUFAC RER lCl@l_Zj@                        lZ l@              l36 Zl@          l 0l 0l 0l 37 l  W@
43 l N lg            l43Z l@      l44Z l 9 ] 9 l 947 [@
JJ        J4                  JS                                                      40                    42 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS lijoll Wiring was removed from terminal points in main relay panel 52, interrupting power to I g,i,j l fire pump auto-start circuit, probably while performing a modification in the canel.                                                                                        I
      ,,,,,g P ermanent wire was replaced immediately. Workplan was revised to caution electriciansI g lco consult with cognizant engineer prior to removing existing wiring.                                                                                                            [
li t il i                                                                                                                                                                            l i      8 9                                                                                                                                                                      80 T1 s                TPOWER                          OTHE A STATUS              015 y RY                              DISCOVERY DESCRIPTION W [Z_j @ l Ol Ol 0lhl                                                  NA                    l    l,C.,_l@l            Soecin1 test                                                l A T:VirY CO TENT AELE ASED OF RELE ASE                            AMOUNT OF ACTIVITY                                                      LOCATION OF RELEASE W lZl@ W @l t      g 9                    10            13 NA 44 l          l 45 NA 80 l
PERSONNEL F APOSURES t                        NOPeR E R              TYPE        DESCRIPTION ^
l    li l il"10 l 010 l@l    '
Zi@l      ''
NA l
;                        PE nSO~~E'L IN;U'JiES
!                        NuMnER                  oESCRiPnON@
l NA 1
i M
                    ! O l 0 l 011 l(Jl12
                    't                                                                                                                                                                80 l
t O';5 OF OR OAMAGE TO FACILlTY TYPE        O f SCnt PTION                                                                                      *
;
W lZl@l i        4 1                TO NA 80 l
e tsuPfifjN NhC USE ONLY            ,
e "      e;;ui81 LN_                                          NA                                                                                    l    lllllllll[]llj l
t      4 1                to                                                                                                                  68 69                          80 ;
o S
NAME OF PREP ARER                                                                                      PHONE:
l 8106090 W
 
o.
            ~ Tcnnessee Valley Authority                                            Form BF-17 Browns Ferry Nuclear Plant                                                  BF 15.2 3/24/81 LER SUPPLEMENTAL INFORMATION BFRO 259 / 81016 R1 Technical Specification Involved      3.11.A.l.b Reported Under Technical Specification              6.7.2.a(2)
Date of Occurrence      5/8/81    Time of Occurrence 1550        Unit 1, 2, and 3 Identification and Description of Occurrence:
Power (120V AC preferred) lifted to fire pump auto-initiation. The exact duration the circuit had been inoperable could not be determined. However, it is probable that the wiring was removed during the modification activity, making the duration 2 weeks ur less.
Conditions Prior to Occurrence:
Unit 1 refueling outage.
Unit 2 at 99%.
Unit 3 at 100%.
Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment. Describe.
Reterminated power supply.
Apparent Cause of Occurrence:
Wiring was removed from terminal points in main relay panel 52 resulting in the interruption of power to the fire pump auto-start circuit. Although it could not definitely be determined how the wiring was removed, it is suspected that the wires were removed during performance of a molification in tne panel.
Analysis of Occurrence:
There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and n) resulting significant chain of events.
I  -
l            Corrective Action:
l  ~
Replaced permanent wiring immediately. Precautions have been added to the l          workplan requiring the electricians to consu'; the cognizanc engineer prior to removing any existing wiring.
I l
Failure Data:
Notic
(
j
* Retention . Period - Lifetime; Responsibility - Document Control Supervisor
* Revision:        -
                                  /
s l
i I}}

Latest revision as of 11:05, 23 December 2024