ML20008F901: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-.
{{#Wiki_filter:-.
                            . . . - .; -        -.      .        .          .. .    . . . - .
~
            ~
e o
o       e c-   0%
c-0%
BOSTON EDISDN COMPANY                                         C)\
BOSTON EDISDN COMPANY C)\\
o.m..*6 cm... soo a.vts,o=     s,...,             8              Y\
8 Y\\
                                                    ...,..........,,.on, g[({}f[g/  gs 1119
g[({}f[g/
                        . y. ..
o.m..*6 cm... soo a.vts,o=
g.l % , y, 8 %     4 ?
s,...,
        ... ...~.........,..~,                                                                   -                p May 6, 1981               M     '
gs
5                     Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 U.S. Nuclear Regulatory Comission Washington, DC 20555 Pilgrim Station Unit #2 License Application Filed December 12, 1973 (Docket No. 50-471)-
...,..........,,.on, g.l %, y, 8 % ?
1119 4
. y...
......~.........,..~,
p May 6, 1981 M
5 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 U.S. Nuclear Regulatory Comission Washington, DC 20555 Pilgrim Station Unit #2 License Application Filed December 12, 1973 (Docket No. 50-471)-


==References:==
==References:==
(a) Federal Register /Vol. 46, No.162 March 23, 1981: "10CFP.50.34(e):
(a) Federal Register /Vol. 46, No.162 March 23, 1981: "10CFP.50.34(e):
Proposed Post-TMI Construction Permit Rule" (b) PSAR Amendment #43 to Pilgrim Stat' ion Unit #2 License Application dated April 29, 1981
Proposed Post-TMI Construction Permit Rule" (b) PSAR Amendment #43 to Pilgrim Stat' ion Unit #2 License Application dated April 29, 1981


==Dear Ms. Adensam:==
==Dear Ms. Adensam:==
The purpose of this letter is to provide clarification of Boston Edison's response to 10CFR50.34(e)(2)(ix), reference (a), which was provided ir:
The purpose of this letter is to provide clarification of Boston Edison's response to 10CFR50.34(e)(2)(ix), reference (a), which was provided ir:
reference (b). A telephone request for this clarification was made by D. Scaletti on May 6,1981.
reference (b). A telephone request for this clarification was made by D. Scaletti on May 6,1981.
On page 10-33 of reference (b) Boston Edison made the following commitment:
On page 10-33 of reference (b) Boston Edison made the following commitment:
                              ....Within two years after receipt of the construction permit, design details, describing the hydrogen control systems, will be provided to the NRC for review; these design details, in-cluding test data and analyses, will illut.trate that the hydrogen control systems will perform in the manner required by the above NRC position."
....Within two years after receipt of the construction permit, design details, describing the hydrogen control systems, will be provided to the NRC for review; these design details, in-cluding test data and analyses, will illut.trate that the hydrogen control systems will perform in the manner required by the above NRC position."
goo /
goo /
S
S
                                                                                                                    / 6/
/ 6/
t
t
[
[
81054b 1                                 '
81054b 1


                                                                                              ~ - -                                                        -
~ - -
sQsTON EDISON COMPANY Ms. E. Adensam - NRC                                                               May 6. 1981 The following clarification of this comitment is hereby provided:
sQsTON EDISON COMPANY Ms. E. Adensam - NRC May 6. 1981 The following clarification of this comitment is hereby provided:
The test data and analyses, to be included with the design details for the hydrogen control system, will specifically include igniter performance and endurance characteristics if-the option chosen for hydrogen control continues to be a deliberate ignition system.
The test data and analyses, to be included with the design details for the hydrogen control system, will specifically include igniter performance and endurance characteristics if-the option chosen for hydrogen control continues to be a deliberate ignition system.
Very truly yours, R. M. Butler Nuclear Projects Manager WFH/cac cc: Mr. D. Scaletti t
Very truly yours, R. M. Butler Nuclear Projects Manager WFH/cac cc: Mr. D. Scaletti t
9 *
9
                    . . . . .  . . . . , _ -  _ _ ,          , - - . . . , , . ,- _ - , , -        3   -. 2,,,--,w-             ,-..              e-
* 3 2,,,--,w-e-


BOSTON COISON COMPANY SERVICE LIST Office of the Secretary                     Francis S. Wright, Esq.
BOSTON COISON COMPANY SERVICE LIST Office of the Secretary Francis S. Wright, Esq.
Docketing and Service Section               Berman & Lewenber0 U.S. Nuclear Regulatory Commission           211 Congress Street Washington, DC 20555                         Boston, MA 02111 Andrew C. Goodhope, Esq.                     Stephen M. Leonard, Esq.
Docketing and Service Section Berman & Lewenber0 U.S. Nuclear Regulatory Commission 211 Congress Street Washington, DC 20555 Boston, MA 02111 Andrew C. Goodhope, Esq.
Chairman, Atomic Safety and                 JoAnn Shotwell Esq.
Stephen M. Leonard, Esq.
Licensing Board           .
Chairman, Atomic Safety and JoAnn Shotwell Esq.
Assistant Attorney General U.S. Nuclear Regulatory Comission           Comonwealth of Massachusetts Washington, DC 20555                         Environmental Protection Div.
Licensing Board Assistant Attorney General U.S. Nuclear Regulatory Comission Comonwealth of Massachusetts Washington, DC 20555 Environmental Protection Div.
One Ashburton Place Mr. A. Dixon Callihan                       Boston,. MA'02108 .
One Ashburton Place Mr. A. Dixon Callihan Boston,. MA'02108.
Union Carbide Corporation
Union Carbide Corporation Post Office Box Y Edward L. Selgrade. Esq.
* Post Office Box Y                           Edward L. Selgrade. Esq.
Oak Ridge, TN 37830 Patrick J. Kenny, Esq.
Oak Ridge, TN 37830                         Patrick J. Kenny, Esq.
Mass. Office of Energy Resources Dr. Richard F. Cole 73 Tremont Street Atonic Safety & Licensing Board Boston, MA 02108 U.S. Nuclear Regulatory Cornission Washington, DC 2055i Henry Hermann, Esq.
Mass. Office of Energy Resources Dr. Richard F. Cole                         73 Tremont Street Atonic Safety & Licensing Board             Boston, MA 02108 U.S. Nuclear Regulatory Cornission Washington, DC 2055i                         Henry Hermann, Esq.
50 Congress Street Atornic Safety & Licensing Panel Room 1045
50 Congress Street               .
.02109 U.S. Nuclear Pegulatory Comission Boston, MA Washington, DC 20555 Mr. & Mrs. Alan R. Cleeton Richard J. Goddard, Esq.
Atornic Safety & Licensing Panel             Room 1045 U.S. Nuclear Pegulatory Comission           Boston, MA .02109 Washington, DC 20555 Mr. & Mrs. Alan R. Cleeton Richard J. Goddard, Esq.                   22 Mackintosh Street Jack R. Goldberg, Esq.                       Franklin, t% 02038 Office of the Executive Legal Director i
22 Mackintosh Street Jack R. Goldberg, Esq.
U.S. Nuclear Regulatory Comission           Willian S. Abbott, Esq.
Franklin, t% 02038 Office of the Executive Legal Director i
Washington, DC 2055!                         Suite 925 50 Congress Street Chief Librarian                             Boston, MA 02109 Plymouth Public Library North Street Plymouth, t% 02360 Atonic Safety & Licensing Appeal Panel U.S. Nuclear Regulatory Comission Washington, DC 20555 t}}
U.S. Nuclear Regulatory Comission Willian S. Abbott, Esq.
Washington, DC 2055!
Suite 925 50 Congress Street Chief Librarian Boston, MA 02109 Plymouth Public Library North Street Plymouth, t% 02360 Atonic Safety & Licensing Appeal Panel U.S. Nuclear Regulatory Comission Washington, DC 20555 t}}

Latest revision as of 02:18, 23 December 2024

Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys
ML20008F901
Person / Time
Site: 05000471
Issue date: 05/06/1981
From: Rhonda Butler
BOSTON EDISON CO.
To: Adensam E
NRC
References
NUDOCS 8105120286
Download: ML20008F901 (3)


Text

-.

~

e o

c-0%

BOSTON EDISDN COMPANY C)\\

8 Y\\

g[({}f[g/

o.m..*6 cm... soo a.vts,o=

s,...,

gs

...,..........,,.on, g.l %, y, 8 % ?

1119 4

. y...

......~.........,..~,

p May 6, 1981 M

5 Director of Nuclear Reactor Regulation Attention: Ms. E. Adensam, Chief Licensing Branch No. 4 U.S. Nuclear Regulatory Comission Washington, DC 20555 Pilgrim Station Unit #2 License Application Filed December 12, 1973 (Docket No. 50-471)-

References:

(a) Federal Register /Vol. 46, No.162 March 23, 1981: "10CFP.50.34(e):

Proposed Post-TMI Construction Permit Rule" (b) PSAR Amendment #43 to Pilgrim Stat' ion Unit #2 License Application dated April 29, 1981

Dear Ms. Adensam:

The purpose of this letter is to provide clarification of Boston Edison's response to 10CFR50.34(e)(2)(ix), reference (a), which was provided ir:

reference (b). A telephone request for this clarification was made by D. Scaletti on May 6,1981.

On page 10-33 of reference (b) Boston Edison made the following commitment:

....Within two years after receipt of the construction permit, design details, describing the hydrogen control systems, will be provided to the NRC for review; these design details, in-cluding test data and analyses, will illut.trate that the hydrogen control systems will perform in the manner required by the above NRC position."

goo /

S

/ 6/

t

[

81054b 1

~ - -

sQsTON EDISON COMPANY Ms. E. Adensam - NRC May 6. 1981 The following clarification of this comitment is hereby provided:

The test data and analyses, to be included with the design details for the hydrogen control system, will specifically include igniter performance and endurance characteristics if-the option chosen for hydrogen control continues to be a deliberate ignition system.

Very truly yours, R. M. Butler Nuclear Projects Manager WFH/cac cc: Mr. D. Scaletti t

9

  • 3 2,,,--,w-e-

BOSTON COISON COMPANY SERVICE LIST Office of the Secretary Francis S. Wright, Esq.

Docketing and Service Section Berman & Lewenber0 U.S. Nuclear Regulatory Commission 211 Congress Street Washington, DC 20555 Boston, MA 02111 Andrew C. Goodhope, Esq.

Stephen M. Leonard, Esq.

Chairman, Atomic Safety and JoAnn Shotwell Esq.

Licensing Board Assistant Attorney General U.S. Nuclear Regulatory Comission Comonwealth of Massachusetts Washington, DC 20555 Environmental Protection Div.

One Ashburton Place Mr. A. Dixon Callihan Boston,. MA'02108.

Union Carbide Corporation Post Office Box Y Edward L. Selgrade. Esq.

Oak Ridge, TN 37830 Patrick J. Kenny, Esq.

Mass. Office of Energy Resources Dr. Richard F. Cole 73 Tremont Street Atonic Safety & Licensing Board Boston, MA 02108 U.S. Nuclear Regulatory Cornission Washington, DC 2055i Henry Hermann, Esq.

50 Congress Street Atornic Safety & Licensing Panel Room 1045

.02109 U.S. Nuclear Pegulatory Comission Boston, MA Washington, DC 20555 Mr. & Mrs. Alan R. Cleeton Richard J. Goddard, Esq.

22 Mackintosh Street Jack R. Goldberg, Esq.

Franklin, t% 02038 Office of the Executive Legal Director i

U.S. Nuclear Regulatory Comission Willian S. Abbott, Esq.

Washington, DC 2055!

Suite 925 50 Congress Street Chief Librarian Boston, MA 02109 Plymouth Public Library North Street Plymouth, t% 02360 Atonic Safety & Licensing Appeal Panel U.S. Nuclear Regulatory Comission Washington, DC 20555 t