ML19350B796: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19350B807 | | number = ML19350B807 | ||
| issue date = 03/17/1981 | | issue date = 03/17/1981 | ||
| title = | | title = Updated LER 80-149/03X-1:on 801031,RHR Pump Suction Isolation Valve 2E11-F4B Was Found Leaking.Caused by Scratches on Valve Seat,Probably Due to Valve Closing on Debris.Valve Seat Polished | ||
| author name = Coggin C | | author name = Coggin C | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 19:03, 16 January 2020
Date released: 12/30/2019 | Download: ML19350B796 |
---|---|
ML19350B807 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 03/17/1981 |
From: | Coggin C GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19350B807 (2) | |
ML19350B795 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 03/17/1981 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19350B795 (1) | |