{{#Wiki_filter:FENOC                           I _
{{#Wiki_filter:FENOC Perry Nuclear Power Plant I _
Perry Nuclear Power Plant 10 Center Road FrstEnergy Nuclear Operating Company                                                                           Perry, Ohio 44081 Richard Anderson                                                                                                     440-280-5579 Vice President-Nuclear                                                                                         Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
10 Center Road FrstEnergy Nuclear Operating Company Perry, Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector


OPERATING DATA REPORT UNIT:   EprrY DATE: 7/6/05
OPERATING DATA REPORT UNIT:
: 1. Docket: 50-440
EprrY DATE:
: 2. Unit Name: Perry Nuclear Power Plant
7/6/05
: 3. Reporting Period June 2005
: 1.
: 4. Utility
Docket: 50-440
: 2.
Unit Name: Perry Nuclear Power Plant
: 3.
Reporting Period June 2005
: 4.
Utility


==Contact:==
==Contact:==
T. Phelps
T. Phelps
: 5. Telephone: 440-280-7660
: 5.
: 6. Design Electrical Rating (Net MWe):           1260
Telephone: 440-280-7660
: 7. Maximum Dependable Capacity (Net MWe):       1235 This Month   Yr-to-Date   Cumulative
: 6.
: 8. Hours Reactor was Critical                   720.0     2.051.9     122.721.3
Design Electrical Rating (Net MWe):
: 9. Hours Generator On-Line                     720.0     1.946.5     119.837.8
: 7.
: 10. Unit Reserve Shutdown Hours                   0.0         0.0           0.0
Maximum Dependable Capacity (Net MWe):
: 11. Net Electrical Enerav (MWeH)             888.993.0 2.200.275.0 137.556.032.0 Page 1
1260 1235
: 8.
H
: 9.
H
: 10.
U
: 11.
N This Month Yr-to-Date ours Reactor was Critical 720.0 2.051.9 ours Generator On-Line 720.0 1.946.5 nit Reserve Shutdown Hours 0.0 0.0 et Electrical Enerav (MWeH) 888.993.0 2.200.275.0 Cumulative 122.721.3 119.837.8 0.0 137.556.032.0 Page 1


I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps Il                                              TELEPHONE: (440) 280-7660 No.       Date   Type       Duration       Reason           Method               Cause and Corrective Action to Prevent Recurrence LHours                     2                 3 k
I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 Il No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence LHours 2
3 k


==SUMMARY==
==SUMMARY==
: The Perry Nuclear Power Plant was on line the entire month of June 2005.
: The Perry Nuclear Power Plant was on line the entire month of June 2005.
: 1. TYPE:             2. REASON:                              3. METHOD:
: 1. TYPE:
F: Forced            A- Equipment Failure (explain)           I - Manual S: Scheduled          8 - Maintenance or Test                 2 - Manual Scram C - Refueling                           3 - Automatic Scram D - Regulatory                           4 - Continuation E - Operating Training &                 5 - Other License Examination F - Administrative G - Operational Error (explain)
F: Forced S: Scheduled
: 2. REASON:
A-Equipment Failure (explain) 8 - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
H -Other (explain)
Page 2 I}}
: 3. METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 I}}

Latest revision as of 17:07, 15 January 2025

June 2005 Monthly Operating Report for Perry Unit 1
ML052030339
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/14/2005
From: Richard Anderson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2890L
Download: ML052030339 (3)


Text

FENOC Perry Nuclear Power Plant I _

10 Center Road FrstEnergy Nuclear Operating Company Perry, Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear Fax: 440-280-8029 July 14, 2005 PY-CEI/NRR-2890L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the June 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

EprrY DATE:

7/6/05

1.

Docket: 50-440

2.

Unit Name: Perry Nuclear Power Plant

3.

Reporting Period June 2005

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

7.

Maximum Dependable Capacity (Net MWe):

1260 1235

8.

H

9.

H

10.

U

11.

N This Month Yr-to-Date ours Reactor was Critical 720.0 2.051.9 ours Generator On-Line 720.0 1.946.5 nit Reserve Shutdown Hours 0.0 0.0 et Electrical Enerav (MWeH) 888.993.0 2.200.275.0 Cumulative 122.721.3 119.837.8 0.0 137.556.032.0 Page 1

I in UNIT SHUTDOWNS REPORT MONTH - June 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 716105 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 Il No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence LHours 2

3 k

SUMMARY

The Perry Nuclear Power Plant was on line the entire month of June 2005.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A-Equipment Failure (explain) 8 - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H -Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 I