E OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION August 23, 2005 Mr. Thomas Dragoun NRRJDRIP U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA. 19406 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 21: | Line 22: | ||
==Dear Mr. Dragoun:== | ==Dear Mr. Dragoun:== | ||
The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) has reviewed the Saxton Nuclear Experimental Corporation (SNEC) final status survey report submitted to the U.S. Nuclear Regulatory Commission (NRC) on July 27, 2005 describing the final status survey results for the SNEC-designated area Embedded / Buried Piping. | The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) has reviewed the Saxton Nuclear Experimental Corporation (SNEC) final status survey report submitted to the U.S. Nuclear Regulatory Commission (NRC) on July 27, 2005 describing the final status survey results for the SNEC-designated area Embedded / Buried Piping. | ||
The final status survey report (FSSR) was reviewed for completeness and conformance to the SNEC License Termination Plan and the MARSSIM. ESSAP did not identify any comments for this FSSR. If you have any questions, please contact me at (865) 576-3356 or Alex J. Boemer at (865) 574-0951. | The final status survey report (FSSR) was reviewed for completeness and conformance to the SNEC License Termination Plan and the MARSSIM. ESSAP did not identify any comments for this FSSR. If you have any questions, please contact me at (865) 576-3356 or Alex J. Boemer at (865) 574-0951. | ||
Sincerely, Timothy J. Bauer Health Physicist Environmental Survey and Site Assessment Program TJB:ar cc: | Sincerely, Timothy J. Bauer Health Physicist Environmental Survey and Site Assessment Program TJB:ar cc: | ||
A. Adams, NRC/NRR/OWFN 12G13 A. Boerner, ORISE/ESSAP S. Adams, NRC/NRR/OWFN 012E5 File/0968 E. Abelquist, ORISE/ESSAP 11 Distribution approval and concurrence: | |||
I Initias I | |||
Technical Management Team Member 1 | |||
l | |||
)40()C) I P. 0. BOX 117, OAK RIDGE, TENNESSEE 37831-0117 Operated by Oak Ridge Associated Universities for the U.S. Department of Energy | |||
.7j/ | |||
,1 0(/4O5 yfi | |||
\\/4 | |||
: 4. XeZA}} | : 4. XeZA}} | ||
Latest revision as of 14:39, 15 January 2025
| ML052860219 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 08/23/2005 |
| From: | Bauer T Oak Ridge Institute for Science & Education |
| To: | Dragoun T NRC/NRR/DRIP/RNRP |
| References | |
| Download: ML052860219 (1) | |
Text
(Z)R I S
E OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION August 23, 2005 Mr. Thomas Dragoun NRRJDRIP U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA. 19406
SUBJECT:
DOCUMENT REVIEW-FINAL STATUS SURVEY REPORT FOR EMBEDDED / BURIED PIPING, SAXTON NUCLEAR EXPERIMENTAL CORPORATION, SAXTON, PENNSYLVANIA (DOCKET NO. 50-146; TASK 1)
Dear Mr. Dragoun:
The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) has reviewed the Saxton Nuclear Experimental Corporation (SNEC) final status survey report submitted to the U.S. Nuclear Regulatory Commission (NRC) on July 27, 2005 describing the final status survey results for the SNEC-designated area Embedded / Buried Piping.
The final status survey report (FSSR) was reviewed for completeness and conformance to the SNEC License Termination Plan and the MARSSIM. ESSAP did not identify any comments for this FSSR. If you have any questions, please contact me at (865) 576-3356 or Alex J. Boemer at (865) 574-0951.
Sincerely, Timothy J. Bauer Health Physicist Environmental Survey and Site Assessment Program TJB:ar cc:
A. Adams, NRC/NRR/OWFN 12G13 A. Boerner, ORISE/ESSAP S. Adams, NRC/NRR/OWFN 012E5 File/0968 E. Abelquist, ORISE/ESSAP 11 Distribution approval and concurrence:
I Initias I
Technical Management Team Member 1
l
)40()C) I P. 0. BOX 117, OAK RIDGE, TENNESSEE 37831-0117 Operated by Oak Ridge Associated Universities for the U.S. Department of Energy