ML062130184: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:SDP/EA REQUEST & STRATEGY FORM Case Data                                                           Disputed:                    Related Cases:
{{#Wiki_filter:SDP/EA REQUEST & STRATEGY FORM Case Data DDIAN.:  
DDIAN.:
"'04-13-f1 Disputed:
                            "'04-13-f1               Number: n4                   Docket No.: 05000298 Request Date: V* 5               Region: IV           CaseType: ,..         Rx"e                   Small Entity. [] No         f1Yes Licensee:     Nebrask Publi Power Di~tct             -act/Cy.ooper License No.:               DPR-46                               Last Day of Insp.: 7=2204 Insp. Rpt No.:       I R-Q4!Q4         _      Keywords:                     --                                                                  ES:   drs Facts         Falluretpo perrbs re he serv*ce wa~terto s rvomialoobflguratbn f1bwng Foulnejie                       t~hnarpice     ýtat~he Icens-ee (EATS):       didnoreaibiagh the gland waterfk q service water m~aintenance. The faikare to reabn' th6 gland w~ater was attributed to indequ~ate instrctnsi. The adqteinstructions led to the cross connection of gland watr resulting ina bs-'f servie water redundiancy.
Number: n4 Related Cases:
Discussion (ifrequired):         One green fWnding and violation of Criterion V for inadequate written instructions for restoring service water to operable status folowing maintenance. DuringrbD final significance determination, the SERP members did not reach consensus on the final risk               oh CC-x 5-SDP                       El1No       nXYes Assessment         x                 [jWhilte           [Ylow                                                 NOV             Yes     ]No Wrongdoing [1No             X             Yes O Ref. Date                           OI Rpt No.::                                       01.Rpt Date.
Docket No.: 05000298 Request Date: V* 5 Region: IV CaseType:,..
DOJ Referral?           D   No   flYes         Ref. Date                         Action Date                           D.ecline             Accept Additional 01 Status             01 Investigating 01]                                    E--01 needs to be notified         D OMOE dispute memo needed
Rx"e Small Entity. [] No f1Yes Licensee:
                              =1]Additional cordination needed           ElAwating DOJ                     j]Needs coordination with DOJ Escalated. Action Consequence:               [IlActual   [   Potental   []Reg. Impact               Willfulness Prior Esc. Action?         El1 No     M Yes           EA.                                 Date:
Nebrask Publi Power Di~tct -act/Cy.ooper License No.:
IDCredit?                 ENo         E]Yes           MTBD                                         SL:E CA Credit?                 ElNo       ElYes           Z]TBD                                   Supp:l CP?           El-No CP El Base       E-Double Base         ['M other:
DPR-46 Last Day of Insp.: 7=2204 Insp. Rpt No.:
Discretion or Order?                           [   No       r-'Yes       Explain:
I R-Q4!Q4 Keywords:
Future Action Conference?               5W   No     EY-es       []   Open         El Cbsed           Additional Action?       0l No VMolation         Re-panel   ED PEC~     Letter       Choice Letter     H Choice Call         E   St.IV NOV         B   Re-caucus UJRegion Issue Esc. Action       U Full Package Review by HO U DEDR Review                       commission C                U Disagreement               NCV OtterAction?     One green finding and violation of Criterion V A. Howell, S. Schwind, K.. Fuller, W. Walker, T. Vegel, D.Loveless, G. Shear,
ES:
drs Facts Falluretpo perrbs re he serv*ce wa~terto s rvomialoobflguratbn f1bwng Foulnejie t~hnarpice  
ýtat ~he Icens-ee (EATS):
didno reaibiagh the gland waterfk q service water m~aintenance. The faikare to reabn' th6 gland w~ater was attributed to indequ~ate instrctnsi. The adqteinstructions led to the cross connection of gland watr resulting ina bs-'f servie water redundiancy.
Discussion (if required): One green fWnding and violation of Criterion V for inadequate written instructions for restoring service water to operable status folowing maintenance. DuringrbD final significance determination, the SERP members did not reach consensus on the final risk oh CC-x 5-SDP El1No nXYes Assessment x
[jWhilte
[Ylow NOV Yes  
]No Wrongdoing [1No X
Yes O Ref. Date OI Rpt No.::
01.Rpt Date.
DOJ Referral?
D No flYes Ref. Date Action Date D.ecline Accept Additional 01 Status 01]
01 Investigating E--01 needs to be notified D
OMOE dispute memo needed
=1]Additional cordination needed ElAwating DOJ j]Needs coordination with DOJ Escalated. Action Consequence:
[IlActual [ Potental []Reg. Impact Willfulness Prior Esc. Action?
El1 No M Yes EA.
Date:
ID Credit?
ENo E]Yes MTBD SL:E CA Credit?
ElNo ElYes Z]TBD Supp:l CP?
El-No CP El Base E-Double Base ['M other:
Discretion or Order?
[
No r-'Yes Explain:
Future Action Conference?
5W No EY-es
[] Open El Cbsed Additional Action?
0l No VMolation Re-panel ED PEC~
Letter Choice Letter H
Choice Call E
St.IV NOV B
Re-caucus UJRegion Issue Esc. Action U Full Package Review by HO U DEDR Review C
commission U Disagreement NCV OtterAction?
One green finding and violation of Criterion V A. Howell, S. Schwind, K.. Fuller, W. Walker, T. Vegel, D. Loveless, G. Shear, D. Chamberlain, G. Sanborn, K Kennedy, D. Loveless, S. Cochrum


==Participants:==
==Participants:==
Region         D.Chamberlain, G. Sanborn, K Kennedy, D. Loveless, S. Cochrum OE             J. Luehman, G. Morell, C. Nolan, D. Starkey                 OGC/OI komiawionmOh rGcod wa de~
Region OE J. Luehman, G. Morell, C. Nolan, D. Starkey OGC/OI komiawion m Oh rGcod wa de~
4 -     49Z
4 -
49Z


000   NOT                   IC             S             HOUT         ROV         H CT,0 R. Franovich, R. Giibbs, D. Coe, M.Tshilftz, M. Reinhart, S. Richards, S. Meng Wong, B. Palla, Program       S. Lavie, M.Honcharik, See-Meng Wong, Office         A.. E-Bassioni, R.Bywater, S.Lavie                   Other Remarks/Comments/Lessons Learned:
000 NOT IC S
HOUT ROV H
CT,0 R. Franovich, R. Giibbs, D. Coe, M. Tshilftz, M. Reinhart, S. Richards, S. Meng Wong, B. Palla, Program S. Lavie, M. Honcharik, See-Meng Wong, Office A.. E-Bassioni, R.Bywater, S.Lavie Other Remarks/Comments/Lessons Learned:
Approved, Dir. OE: IRA/
Approved, Dir. OE: IRA/
Date: 02/09/05}}
Date: 02/09/05}}

Latest revision as of 07:40, 15 January 2025

EA-04-131-4, Cooper
ML062130184
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/09/2005
From: Luehman J, Morell G, Nolan M, Starkey R
NRC/OE
To:
References
EA-04-131, FOIA/PA-2006-0007, IR-04-014 EA-04-131-4
Download: ML062130184 (2)


Text

SDP/EA REQUEST & STRATEGY FORM Case Data DDIAN.:

"'04-13-f1 Disputed:

Number: n4 Related Cases:

Docket No.: 05000298 Request Date: V* 5 Region: IV CaseType:,..

Rx"e Small Entity. [] No f1Yes Licensee:

Nebrask Publi Power Di~tct -act/Cy.ooper License No.:

DPR-46 Last Day of Insp.: 7=2204 Insp. Rpt No.:

I R-Q4!Q4 Keywords:

ES:

drs Facts Falluretpo perrbs re he serv*ce wa~terto s rvomialoobflguratbn f1bwng Foulnejie t~hnarpice

ýtat ~he Icens-ee (EATS):

didno reaibiagh the gland waterfk q service water m~aintenance. The faikare to reabn' th6 gland w~ater was attributed to indequ~ate instrctnsi. The adqteinstructions led to the cross connection of gland watr resulting ina bs-'f servie water redundiancy.

Discussion (if required): One green fWnding and violation of Criterion V for inadequate written instructions for restoring service water to operable status folowing maintenance. DuringrbD final significance determination, the SERP members did not reach consensus on the final risk oh CC-x 5-SDP El1No nXYes Assessment x

[jWhilte

[Ylow NOV Yes

]No Wrongdoing [1No X

Yes O Ref. Date OI Rpt No.::

01.Rpt Date.

DOJ Referral?

D No flYes Ref. Date Action Date D.ecline Accept Additional 01 Status 01]

01 Investigating E--01 needs to be notified D

OMOE dispute memo needed

=1]Additional cordination needed ElAwating DOJ j]Needs coordination with DOJ Escalated. Action Consequence:

[IlActual [ Potental []Reg. Impact Willfulness Prior Esc. Action?

El1 No M Yes EA.

Date:

ID Credit?

ENo E]Yes MTBD SL:E CA Credit?

ElNo ElYes Z]TBD Supp:l CP?

El-No CP El Base E-Double Base ['M other:

Discretion or Order?

[

No r-'Yes Explain:

Future Action Conference?

5W No EY-es

[] Open El Cbsed Additional Action?

0l No VMolation Re-panel ED PEC~

Letter Choice Letter H

Choice Call E

St.IV NOV B

Re-caucus UJRegion Issue Esc. Action U Full Package Review by HO U DEDR Review C

commission U Disagreement NCV OtterAction?

One green finding and violation of Criterion V A. Howell, S. Schwind, K.. Fuller, W. Walker, T. Vegel, D. Loveless, G. Shear, D. Chamberlain, G. Sanborn, K Kennedy, D. Loveless, S. Cochrum

Participants:

Region OE J. Luehman, G. Morell, C. Nolan, D. Starkey OGC/OI komiawion m Oh rGcod wa de~

4 -

49Z

000 NOT IC S

HOUT ROV H

CT,0 R. Franovich, R. Giibbs, D. Coe, M. Tshilftz, M. Reinhart, S. Richards, S. Meng Wong, B. Palla, Program S. Lavie, M. Honcharik, See-Meng Wong, Office A.. E-Bassioni, R.Bywater, S.Lavie Other Remarks/Comments/Lessons Learned:

Approved, Dir. OE: IRA/

Date: 02/09/05