ML061000729: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-James Noggle - FW. Well Summaries                               _        _iagiei1 From:             "Croulet, Donald" <dcroule@entergy.com>
{{#Wiki_filter:-James Noggle - FW. Well Summaries
To:                 "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter .com>,
_iagiei1 From:  
            "'Timothy Rice"' <tbrice @gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @nrc.gov"'
"Croulet, Donald" <dcroule@entergy.com>
            <jdn &#xa9;n -c.gov>, "Jones, T. R." <tjones2 &#xa9; entergy.com>
To:  
Date:             12/15/05 5:09PM
"Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter.com>,
"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'
<jdn &#xa9; n -c.gov>, "Jones, T. R." <tjones2 &#xa9; entergy.com>
Date:
12/15/05 5:09PM


==Subject:==
==Subject:==
Line 28: Line 32:
Well Summaries Don Would you please forward these to the NRC and DEC/DOH.
Well Summaries Don Would you please forward these to the NRC and DEC/DOH.
Thanks Ron
Thanks Ron
            <<mwexecsummSort by-Date-Dec_15_2005.doc>>
<<mwexecsummSort by-Date-Dec_15_2005.doc>>
            <<mw_execsummSortby-Well-Dec_15_2005.doc>>
<<mw_execsummSortby-Well-Dec_15_2005.doc>>
RLaVera entergy.com <mailto:RLaVera @entergy.com>
RLaVera entergy.com <mailto:RLaVera @entergy.com>
3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)


On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date         ID               Location               Sample Results 9/28-29/05 MW-107         NEM                     NDIHTO MW-108         GT-1                     ND/HTO MW-109         GT-1                     ND/HTO
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO
____1 11      Transformer Yard         212,000 pCi/lHTO 10/5/05 MW-lll         Transformer Yard         188,000 pCi/HI-ITO
____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO
  ]0/6/05 U3-1           U3 Discharge Canal       417 pCi/A HTO U3-2           U3 Discharge Canal       960 pCi/l HTO U3-3           U3 Discharge Canal       439 pCiA HTO U3-TI         U3 South Turbine         703 pCiA HTO U3-T2         U3 North Turbine         1,590 pCi/l HTO 10/14/05 MW-lll         Transformer Yard         682 pCi/I HTO (heavy rain)
]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)
MW- 11 .       Transformer Yard         632 pCi/l HT0 (back-up) 10/21/05 MW-lll         Transformer Yard         284,000 pCi/I HTO 10121105 U3-1           U3 Discharge Canal       ND/ITO U3-2           U3 Discharge Canal       ND/HTO U3-3           U3 Discharge Canal       ND/HTO U34           U3 Condensate Polisher   399 pCi/l HTO U3-T1         U3 South Turbine         ND/ITO U3-T2         U3 North Turbine         1,470 pCi/l HTO 10128/05 MW-IllI       Transformer Yard         218,000 pCi/l HTO U3-1           U3 Discharge Canal       ND/HTO U3-2           U3 Discharge Canal       ND/HTO U3-3           U3 Discharge Canal       ND/HTO U3-4           U3 Condensate Polisher   405 pCi/i HTO U3-T1         U3 South Turbine         ND/HTO U3-T2         U3 North Turbine         1,280 pCi/l HTO 11/4/05   MW-lll         Transformer Yard         302,000 pCi/A HOT U3-1           U3 Discharge Canal       ND/HTO U3-2           U3 Discharge Canal       ND/HTO U3-3           U3 Discharge Canal       ND/HTO U3-4           U3 Condensate Polisher   ND/HTO U3-T1         U3 South Turbine         ND/HTO U3-T2         U3 North Turbine         1,190 pCi/I HTO I               GAaxelson\mw_execsumm.doc
MW-11.
Transformer Yard 632 pCi/l HT0 (back-up) 10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I
GAaxelson\\mw_execsumm.doc


On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date           ID               Location                 Sample Results 1:1/3-4/05   MW-108       GT-1                     ND/HTO MW-109       GT-1                     ND/HTO 11/10/05     MW-111       Transforner Yard         246,000 pCi/l HTO U3-1         U3 Discharge Canal       ND/HTO U3-2         U3 Discharge Canal       ND/HTO U3-3         U3 Discharge Canal       471 pCi/A HFTO U3-4         U3 Condensate Polisher   ND/HTO U3-T1         U3 South Turbine         563 pCi/l HTO U3-T2         U3 North Turbine         1,640 pCi/l HTO 11/18/05     MW-11l       Transformer Yard         171,000 pCi/l HTO 11/22/05     MW- 11I       Transformer Yard         180,000 pCi/I HTO U3-1         U3 Distharge .Canal     ND/HTO U3-2         U3 Discharge Canal       ND/HTO U3-3         U3 Discharge Canal       ND/HTO U3-4         U3 Condensate Polisher   ND/HTO U3-T1         U3 South Turbine         ND/HTO U3-T2         U3 North Turbine         ND/HTO 12/02/05   MW-111         Transformer Yard         125,000 pCi/l HTO 12/02/05   U3-1           U3 Discharge Canal       ND/HTO U3-2           U3 Discharge Canal       ND/HTO U3-3           U3 Discharge Canal       ND/HTO U34           U3 Condensate Polisher   ND/HTO U3-T1         U3 South Turbine         498 pCi/A HTO U3-T2         U3 North Turbine         1,329 pCi/l HTO 12/2/05   MW-38         End of IP-3 Discharge   15000 pCi/Il HTO - False Canal Concrete           Positive due to sample
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW-11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge.Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO - False Canal Concrete Positive due to sample
__      _    _contamination.
_contamination.
12/5/05   MW-38         End of IP-3 Discharge               ND/HTO Canal Concrete 12/6/05   MW-38         End of IP-3 Discharge               ND/HTO
12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2
          ._              Canal Concrete 12/08/05   MW-111         Transformer Yard         270,000 pCi/I HTO MH-3         Transformer Yard               894 pCi/l HTO MH-5         Transformer Yard             2,020 pCi/l HTO MH-6         Transformer Yard           37,100 pCi/l HTO 1:2/13/05   MV-34         Transformer Yard           63,900 pCi/l HTO MW-35         Transformer Yard           42,300 pCi/I HTO 2             G:\axeIson\mw_execsumm.doc
G:\\axeIson\\mw_execsumm.doc


On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date                   Location                             Results 10/18/05 Croton Reservoir                         ND/HTO     - Gamma Camp Field Reservoir                     ND/HTO     - Gamma 10/20/05 Gypsum                                   ND/HTO     - Gamma Algonquin                                 ND/HTO     - Gamma 5 th Street Well                         ND/HTO - Gamma 10/25/05 Rock Quarry                               ND/HTO - Gamma
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5th Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma
].1/8/05 5 th Street Well                         ND/IHTO - Gamma 11/30/05 Gypsum                                   ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3               G:\axeIson\mw_execsumm.doc
].1/8/05 5 th Street Well ND/IHTO - Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3
G:\\axeIson\\mw_execsumm.doc


On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID       Date           Location                 Sample Results M-1-3     12/8/2005 Transformer Yard         894 pCi/l HTO MI-S       12/8/2005 Transformer Yard         2,020 pCi/l HTO MHI-6     12/8/2005 Transformer Yard         37,100 pCi/i HTO ID       Date           Location                 Sample Results MW-30     11/22/2005 FSB Leakage Area -
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th
Note: Well development   464, 000 to 600, 000 pCi/l NOT completed           HTO
- - )! :1-4';'; f":-;.'
- - )! :1-4';'; f":-;.'    ID   j   Date           Location         j       Sample Results,,,,, l MWN-34   12/13/2005 Transformer Yard         63,900 Ci/I HTO MWN-35   12/13/2005 Transformer Yard         42,300 pCi/I HTO ID       Date           Location                 Sample Results MWN-38     12/2/2005 End of IP-3             15000 pCi/l HTO - False Discharge Canal         Positive due to sample Concrete                 contamination.
ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -
MWN-38     12/5/2005 End of IP-3 Discharge Canal Concrete                           ND/HTO MNP-38     12/6/2005 End of IP-3 Discharge Canal
Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j
_              Concrete                           ND/HTO MWEXE-2.DOC                         Page 1 of 5
Date Location j
Sample Results,,,,,
l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.
MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWEXE-2.DOC Page 1 of 5


On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID       Date         Location             Sample Results MW-111   9/28/2005   Transformer Yard       212,000 pCi/l HTO MLW- 11   10/5/2005   Transformer Yard       188,000 pCi/l HTO MW-il1   10/14/2005   Transformer Yard   682 pCi/l HTO (heavy rain)
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW-11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)
M.W-1 I1 10/14/2005   Transformer Yard   632 pCi/l HTO (back-up)
M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)
MW- 11   10/21/2005   Transformer Yard       284,000 pCi/l HTO M.W-11l 10/28/2005   Transformer Yard       218,000 pCi/l HTO M.W- 11   11/4/2005   Transformer Yard       302,000 pCi/Q HOT M.W-111 11/10/2005   Transformer Yard       246,000 pCi/l HTO MW-111   11/18/2005   Transformer Yard       171,000 pCi/l HTO MW-ill   11/22/2005   Transformer Yard       180,000 pCi/l HTO ,';qr- _.I
MW-11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W-11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO,';qr-
.W-Ill 12/02/2005   Transformer Yard       125,000 pCiAl HTO MW-11l   12/08/2005   Transformer Yard       270,000 pCi/l HTO ID       Date         Location             Sample Results MW-107   9/28/2005         NEM                   NDIHT0 MW-108   9/28/2005         GT-N                   ND/HTO MW-108     11/4/05         GT-1                   ND/HTO MW-109   9/28/2005         GT-1                   ND/HTO MW-109   11/04/2005         GT-1                   ND/HTO MWEXE-2.DOC                   Page 2 of 5
.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO
_.I MWEXE-2.DOC Page 2 of 5


On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID           Date           Location                 Sample Results U3-1             10/6/2005   U3 Discharge Canal   417 pCi/l HTO U'-1             10/21/2005   U3 Discharge Canal   ND/HTO UJ-1             10/28/2005   U3 Discharge Canal   ND/HTO U';-1             11/4/2005   U3 Discharge Canal   ND/HTO U';-1         11/10/2005   U3 Discharge Canal   ND/HTO U_;__           11/22/2005   U3 Discharge Canal   ND/HTO U;-1                 12/2/05 U3 Discharge Canal     ND/HTO U2i-2             10/6/2005 U3 Discharge Canal     960 pCi/l HTO U2i-2           10/21/2005 U3 Discharge Canal     ND/HTO
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__
            'V I 10/28/2005 4. U3 Discharge Canal   ND/HTO                 . 4 4F,),:,!; .....
11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO
-                &                                  4 Ui-2             11/4/2005 U3 Discharge Canal     ND/HTO U2;-2           11/10/2005 U3 Discharge Canal     ND/HTO U2;-2           11/22/2005 U3 Discharge Canal     ND/HTO U3-2                 12/2/05 U3 Discharge Canal     ND/HTO U-;-3             10/6/2005 U3 Discharge Canal     439 pCi/l HTO Ur-3             10/21/2005 U3 Discharge Canal     ND/HTO U- -3           10/28/2005 U3 Discharge Canal     ND/HTO U-'-3             11/4/2005 U3 Discharge Canal     ND/HTO U$-3             11/10/2005 U3 Discharge Canal     471 pCi/l HTO U3.-3           11/22/2005 U3 Discharge Canal     ND/HTO Ur-3                 12/2/05 U3 Discharge Canal     ND/HTO U2.4                           U3 Condensate       399 pCi/l HTO 10/21/2005 Polisher U2-4                           U3 Condensate       405 pCi/l HTO 10/28/2005 Polisher U2-4                           U3 Condensate       ND/HTO 11/4/2005 Polisher U2-4                         U3 Condensate         ND/HTO 11/10/2005 Polisher U-4                           U3 Condensate         ND/HTO 11/22/2005 Polisher U3-4                           U3 Condensate         ND/HTO 12/2/05 Polisher U3-T1             10/6/2005 U3 South Turbine       703 pCi/K HTO U3-T1             10/21/2005 U3 South Turbine       ND/HTO MWEXE-2.DOC                       Page 3 of 5
'V I 10/28/2005 U3 Discharge Canal ND/HTO 4
4 F,),:,!;
: 4.
4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5


On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine   ND/HTO U.;-T1 11/4/2005 U3 South Turbine   ND/HTO U'-T1 11/10/2005 U3 South Turbine   563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine   ND/HTO U3-T1     12/2/05 U3 South Turbine   498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine   1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine   1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine   1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine   1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine   1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine     ND/HTO U$-T2     12/2/05 U3 North Turbine   1,329 pCill HTO MWEXE-2.DOC                     Page 4 of 5
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5


On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000                                                                     i., 1 I I I ,4
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I
                                                                                    'i, A                    _ .1.
300,000
:I -i
:
250,000                                                                                   t I
C._
C._
&deg; 200,000           A-.,
&deg; 200,000 0.Q E.
0.
150,000 I._
Q                                                                                                         -- pCUI HTO E
100,000 50,000 0
. 150,000 I._
i., 1 I
100,000                               I                                                            I 50,000 0 - ------------   r-                 I     I                 I               I       I to                 oto                         to  to    tO o       0 oto    0o    0to                      o         o       o   0 0             o       0   o   0     0       o     0                             o  o 04                                              C.)
I I, 4
C)0) o       o                                 T)    CD         C')       0 N co
'i, A
_        i
_.1.
_N~l       iz1 C)                        o       0   0 Date j.._
: -i I :
MWEXE-2.DOC                     Page.15 of 5 I I}}
t A-.,
I I
- ------------ r-I I
I I
I pCUI HTO to 0
04 C) oto o
0 o
0 o
o i
to o
to o
0 0
o 0
0 o
0 0
to to o
0 C.)
C) o Date tO 0)
T) o o
CD C')
co
_N~l o
0 o
o 0
N 1
iz MWEXE-2.DOC j.._
Page.15 of 5 I I}}

Latest revision as of 10:02, 15 January 2025

E-mail from D. Croulet of Entergy to Various, Regarding Well Summaries
ML061000729
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/15/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000729 (9)


Text

-James Noggle - FW. Well Summaries

_iagiei1 From:

"Croulet, Donald" <dcroule@entergy.com>

To:

"Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter.com>,

"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'

<jdn © n -c.gov>, "Jones, T. R." <tjones2 © entergy.com>

Date:

12/15/05 5:09PM

Subject:

FW: Well Summaries From: Lavera, Ron Sent: Tt ursday, December 15, 2005 3:29 PM To: Croulet, Donald; Axelson, William L

Subject:

Well Summaries Don Would you please forward these to the NRC and DEC/DOH.

Thanks Ron

<<mwexecsummSort by-Date-Dec_15_2005.doc>>

<<mw_execsummSortby-Well-Dec_15_2005.doc>>

RLaVera entergy.com <mailto:RLaVera @entergy.com>

3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO

____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO

]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)

MW-11.

Transformer Yard 632 pCi/l HT0 (back-up) 10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I

GAaxelson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW-11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge.Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO - False Canal Concrete Positive due to sample

_contamination.

12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2

G:\\axeIson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5th Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma

].1/8/05 5 th Street Well ND/IHTO - Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3

G:\\axeIson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th

- - )! :1-4';'; f":-;.'

ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -

Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j

Date Location j

Sample Results,,,,,

l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.

MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWEXE-2.DOC Page 1 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW-11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)

M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)

MW-11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W-11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO,';qr-

.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO

_.I MWEXE-2.DOC Page 2 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__

11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO

'V I 10/28/2005 U3 Discharge Canal ND/HTO 4

4 F,),:,!;

4.

4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I

C._

° 200,000 0.Q E.

150,000 I._

100,000 50,000 0

i., 1 I

I I, 4

'i, A

_.1.

-i I :

t A-.,

I I

- ------------ r-I I

I I

I pCUI HTO to 0

04 C) oto o

0 o

0 o

o i

to o

to o

0 0

o 0

0 o

0 0

to to o

0 C.)

C) o Date tO 0)

T) o o

CD C')

co

_N~l o

0 o

o 0

N 1

iz MWEXE-2.DOC j.._

Page.15 of 5 I I