ML070680291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 24: Line 24:
Mr. Robert Smith has been named as General Manager Plant Operations for the Pilgrim Nuclear Power Station.
Mr. Robert Smith has been named as General Manager Plant Operations for the Pilgrim Nuclear Power Station.
Mr. Smith, the current Director of Engineering at Pilgrim, will be replaced by Mr. Brian Sullivan, the current Manager of System Engineering. Mr. Smith replaces Mr. Kevin Bronson, who was previously announced as the new Site Vice President at Pilgrim.
Mr. Smith, the current Director of Engineering at Pilgrim, will be replaced by Mr. Brian Sullivan, the current Manager of System Engineering. Mr. Smith replaces Mr. Kevin Bronson, who was previously announced as the new Site Vice President at Pilgrim.
Contact:                               Org:    Phone No:            Email:
 
==Contact:==
Org:    Phone No:            Email:
POWELL, RAYMOND J                      R1      (610) 337-6967        RJP@nrc.gov}}
POWELL, RAYMOND J                      R1      (610) 337-6967        RJP@nrc.gov}}

Latest revision as of 14:36, 7 December 2019

MR-1-2007-0005 - Announced Management Changes for Pilgrim Station 03/09/2007
ML070680291
Person / Time
Site: Pilgrim
Issue date: 03/09/2007
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To:
Powell R, RI/DRP/610-337-6967
References
MR-I-07-0015
Download: ML070680291 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I Morning Report Date: MAR 09, 2007 Licensee/Facility: Notification:

ENTERGY NUCLEAR GENERATION COMPANY MR Number: 1-2007-0005 Pilgrim Date: 03/09/2007 Plymouth, Massachusetts Licensee Announcement Dockets: 050-00293

[1] GE-3

Subject:

Announced Management Changes at Pilgrim Station Discussion:

Mr. Robert Smith has been named as General Manager Plant Operations for the Pilgrim Nuclear Power Station.

Mr. Smith, the current Director of Engineering at Pilgrim, will be replaced by Mr. Brian Sullivan, the current Manager of System Engineering. Mr. Smith replaces Mr. Kevin Bronson, who was previously announced as the new Site Vice President at Pilgrim.

Contact:

Org: Phone No: Email:

POWELL, RAYMOND J R1 (610) 337-6967 RJP@nrc.gov