ML071450317: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:INRREP -, | {{#Wiki_filter:INRREP -,Response from "Comment on NRC Documents" Page 1 From: | ||
To: | Robert Royce <Robert.S. Royce@ dom.com> | ||
Date: | To: | ||
<nrcrep@nrc.gov> | |||
Date: | |||
Wed, May 23, 2007 9:28 AM | |||
==Subject:== | ==Subject:== | ||
Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert Royce (Robert.S.Royce@dom.com) on Wednesday, May 23, 2007 at 09:27:48 | Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert Royce (Robert.S.Royce@dom.com) on Wednesday, May 23, 2007 at 09:27:48 DocumentTitle: NUREG-1021, Rev 9 Operator Licensing Examination Standards For Power Reactors Comments: ES-301, Section D.5.c. says "scenarios... should include startup, low-power, and full-power situations." A note at the bottom of the page states "NUREG-1449, 'NRC Staff Evaluation of Shutdown and Low-Power Operation,' defines 'low power' to include the range from criticality to 5 percent power." | ||
DocumentTitle: NUREG-1021, Rev 9 Operator Licensing Examination Standards For Power Reactors Comments: ES-301, Section D.5.c. says "scenarios... should include startup, low-power, and full-power situations." A note at the bottom of the page states "NUREG-1449, 'NRC Staff Evaluation of Shutdown and Low-Power Operation,' defines 'low power' to include the range from criticality to 5 percent power." | |||
It was difficult to develop a "low power" scenario that did not run excessively long, as the crew needs a fairly lengthy time for pre-briefing the scenario, and the crew takes longer to maneuver the plant at such low powers. Also, the crew in the plant would have an extra operator at the feed station during portions of the startup, and the risk of a feed-station related reactor trip is also significant, potentially invalidating portions of the scenario. | It was difficult to develop a "low power" scenario that did not run excessively long, as the crew needs a fairly lengthy time for pre-briefing the scenario, and the crew takes longer to maneuver the plant at such low powers. Also, the crew in the plant would have an extra operator at the feed station during portions of the startup, and the risk of a feed-station related reactor trip is also significant, potentially invalidating portions of the scenario. | ||
We are already required to test applicants at low power/shutdown conditions during the JPM exam per ES-301, section D.4.b. Is it posible to remove the definition of "low power" from section D.5.c, allowing the Sim Operating Test scenario to be at 25%, 50%, etc.? | We are already required to test applicants at low power/shutdown conditions during the JPM exam per ES-301, section D.4.b. Is it posible to remove the definition of "low power" from section D.5.c, allowing the Sim Operating Test scenario to be at 25%, 50%, etc.? | ||
organization: Dominion, Millstone Station addressl: Millstone Simulator Training Building address2: PO Box 128 city: Waterford | organization: Dominion, Millstone Station addressl: Millstone Simulator Training Building address2: PO Box 128 city: Waterford state: CT | ||
state: CT | ) | ||
zip: 06385 | |||
phone: (860) 437-2636 | -F1 country: USA J-] | ||
phone: (860) 437-2636 N) | |||
6 61,us r | C: | ||
C/) | |||
6ee~' ee, | |||
/- | |||
6 61,us r- | |||
&~, | |||
c:\temp\GW}00012.TMP | c:\\temp\\GW}00012.TMP I a.g -e Mail Envelope Properties (4654415C.75E: 4: 59230) | ||
==Subject:== | ==Subject:== | ||
Response from "Comment on NRC Documents" | Creation Date From: | ||
Created By: | |||
Response from "Comment on NRC Documents" Wed, May 23, 2007 9:27 AM Robert Royce <Robert.S.Royce @ dom.com> | |||
Robert.S.Rovce @dom.com Recipients nrc.gov TWGWPO01.HQGWDOO1 NRCREP Post Office TWGWPO01.HQGWDO01 Route nrc.gov Files MESSAGE Mime.822 Options Expiration Date: | |||
Priority: | |||
ReplyRequested: | |||
Return Notification: | |||
Concealed | |||
==Subject:== | ==Subject:== | ||
Security: | |||
Size 1620 2254 Date & Time Wednesday, May 23, 2007 9:27 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled}} | |||
Latest revision as of 23:28, 14 January 2025
| ML071450317 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/23/2007 |
| From: | Royce R Dominion, Dominion Nuclear Connecticut |
| To: | Rulemaking, Directives, and Editing Branch |
| References | |
| 72FR28728 00002, ES-301, NUREG-1021, Rev 9 | |
| Download: ML071450317 (2) | |
Text
INRREP -,Response from "Comment on NRC Documents" Page 1 From:
Robert Royce <Robert.S. Royce@ dom.com>
To:
<nrcrep@nrc.gov>
Date:
Wed, May 23, 2007 9:28 AM
Subject:
Response from "Comment on NRC Documents" Below is the result of your feedback form. It was submitted by Robert Royce (Robert.S.Royce@dom.com) on Wednesday, May 23, 2007 at 09:27:48 DocumentTitle: NUREG-1021, Rev 9 Operator Licensing Examination Standards For Power Reactors Comments: ES-301, Section D.5.c. says "scenarios... should include startup, low-power, and full-power situations." A note at the bottom of the page states "NUREG-1449, 'NRC Staff Evaluation of Shutdown and Low-Power Operation,' defines 'low power' to include the range from criticality to 5 percent power."
It was difficult to develop a "low power" scenario that did not run excessively long, as the crew needs a fairly lengthy time for pre-briefing the scenario, and the crew takes longer to maneuver the plant at such low powers. Also, the crew in the plant would have an extra operator at the feed station during portions of the startup, and the risk of a feed-station related reactor trip is also significant, potentially invalidating portions of the scenario.
We are already required to test applicants at low power/shutdown conditions during the JPM exam per ES-301, section D.4.b. Is it posible to remove the definition of "low power" from section D.5.c, allowing the Sim Operating Test scenario to be at 25%, 50%, etc.?
organization: Dominion, Millstone Station addressl: Millstone Simulator Training Building address2: PO Box 128 city: Waterford state: CT
)
zip: 06385
-F1 country: USA J-]
phone: (860) 437-2636 N)
C:
C/)
6ee~' ee,
/-
6 61,us r-
&~,
c:\\temp\\GW}00012.TMP I a.g -e Mail Envelope Properties (4654415C.75E: 4: 59230)
Subject:
Creation Date From:
Created By:
Response from "Comment on NRC Documents" Wed, May 23, 2007 9:27 AM Robert Royce <Robert.S.Royce @ dom.com>
Robert.S.Rovce @dom.com Recipients nrc.gov TWGWPO01.HQGWDOO1 NRCREP Post Office TWGWPO01.HQGWDO01 Route nrc.gov Files MESSAGE Mime.822 Options Expiration Date:
Priority:
ReplyRequested:
Return Notification:
Concealed
Subject:
Security:
Size 1620 2254 Date & Time Wednesday, May 23, 2007 9:27 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled