ML19296B000: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19296B003
| number = ML19296B003
| issue date = 02/13/1980
| issue date = 02/13/1980
| title = Forwards LER 80-008/03L-0
| title = LER 80-008/03L-0:on 800116,during Fire Protection Sys Barrier Surveillance Test,Gaps in Conduits Found.Caused by Procedural Deficiency.Holes Temporarily Sealed W/ Kao Wool.Procedures Modified
| author name = Chesko R
| author name = Chesko R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 13:18, 20 January 2020

Forwards LER 80-008/03L-0
Date released: 11/06/2019 Download: ML19296B000


LER 80-008/03L-0:on 800116,during Fire Protection Sys Barrier Surveillance Test,Gaps in Conduits Found.Caused by Procedural Deficiency.Holes Temporarily Sealed W/ Kao Wool.Procedures Modified
ML19296B003
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/1980
From: Chesko R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19296B003 (2)
Forwards LER 80-008/03L-0
ML19296A999
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19296A999 (1)