{{#Wiki_filter:CPS/USAR CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS PAGE
{{#Wiki_filter:CPS/USAR CHAPTER 17 17-i REV. 11, JANUARY 2005 CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS PAGE


==17.0       INTRODUCTION==
==17.0 INTRODUCTION==
17.1-1 17.1       QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION                                       17.1-1 17.2       QUALITY ASSURANCE DURING THE OPERATIONS PHASE                                             17.1-1 CHAPTER 17                        17-i          REV. 11, JANUARY 2005
17.1-1 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.1-1


CPS/USAR CHAPTER 17 - QUALITY ASSURANCE
CPS/USAR CHAPTER 17 17.1-1 REV. 14, JANUARY 2011 CHAPTER 17 - QUALITY ASSURANCE
 
==17.0    INTRODUCTION==


==17.0 INTRODUCTION==
Exelon has ultimate responsibility for assuring that the Clinton Power Station is designed, constructed, tested, and operated in compliance with applicable regulations, codes, and standards and in a manner to protect the health and safety of the public. In meeting this responsibility, a Quality Assurance program has been established and implemented which complies with the provisions of:
Exelon has ultimate responsibility for assuring that the Clinton Power Station is designed, constructed, tested, and operated in compliance with applicable regulations, codes, and standards and in a manner to protect the health and safety of the public. In meeting this responsibility, a Quality Assurance program has been established and implemented which complies with the provisions of:
: a.     Title 10, Code of Federal Regulations Part 50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants",
a.
: b.     American Society of Mechanical Engineers (ASME) NQA-1 (1994) "Quality Assurance Program Requirements for Nuclear Facilities",
Title 10, Code of Federal Regulations Part 50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants",
: c.     American National Standard ANSI N18.7-(1976) "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants", and
b.
: d.     Applicable sections of the American Society of Mechanical Engineers (ASME)
American Society of Mechanical Engineers (ASME) NQA-1 (1994) "Quality Assurance Program Requirements for Nuclear Facilities",
c.
American National Standard ANSI N18.7-(1976) "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants", and d.
Applicable sections of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code.
Boiler and Pressure Vessel Code.
The Clinton Power Station Quality Assurance Manual is structured in accordance with the outline of the eighteen criteria of Appendix B to 10CFR50 and Revision 3 of the NRC Regulatory Guide 1.70, "Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants
The Clinton Power Station Quality Assurance Manual is structured in accordance with the outline of the eighteen criteria of Appendix B to 10CFR50 and Revision 3 of the NRC Regulatory Guide 1.70, "Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants  
- LWR Edition". Section 17.1, Quality Assurance During Design and Construction, in the PSAR, covered activities occurring up to the turnover of a system, structure, or component by the constructor to IP for checkout and testing. Section 17.2, Quality Assurance During the Operations Phase, describes the Quality Assurance program applicable to activities during the Operations Phase.
- LWR Edition". Section 17.1, Quality Assurance During Design and Construction, in the PSAR, covered activities occurring up to the turnover of a system, structure, or component by the constructor to IP for checkout and testing. Section 17.2, Quality Assurance During the Operations Phase, describes the Quality Assurance program applicable to activities during the Operations Phase.
17.1   QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The Quality Assurance Program for design and construction of Clinton Power Station was described in the Illinois Power Nuclear Power Construction Quality Assurance Manual.
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The Quality Assurance Program for design and construction of Clinton Power Station was described in the Illinois Power Nuclear Power Construction Quality Assurance Manual.
17.2   QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Quality Assurance Program for Operation of Clinton Power Station is described in the Quality Assurance Topical Report (QATR) NO-AA-10.
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Quality Assurance Program for Operation of Clinton Power Station is described in the Quality Assurance Topical Report (QATR) NO-AA-10.}}
CHAPTER 17                                        17.1-1                REV. 14, JANUARY 2011}}

Latest revision as of 19:12, 11 January 2025

Updated Safety Analysis Report, Revision 15, Chapter 17 - Quality Assurance
ML13016A347
Person / Time
Site: Clinton 
Issue date: 01/10/2013
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML13016A347 (2)


Text

CPS/USAR CHAPTER 17 17-i REV. 11, JANUARY 2005 CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS PAGE

17.0 INTRODUCTION

17.1-1 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.1-1

CPS/USAR CHAPTER 17 17.1-1 REV. 14, JANUARY 2011 CHAPTER 17 - QUALITY ASSURANCE

17.0 INTRODUCTION

Exelon has ultimate responsibility for assuring that the Clinton Power Station is designed, constructed, tested, and operated in compliance with applicable regulations, codes, and standards and in a manner to protect the health and safety of the public. In meeting this responsibility, a Quality Assurance program has been established and implemented which complies with the provisions of:

a.

Title 10, Code of Federal Regulations Part 50 Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants",

b.

American Society of Mechanical Engineers (ASME) NQA-1 (1994) "Quality Assurance Program Requirements for Nuclear Facilities",

c.

American National Standard ANSI N18.7-(1976) "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants", and d.

Applicable sections of the American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code.

The Clinton Power Station Quality Assurance Manual is structured in accordance with the outline of the eighteen criteria of Appendix B to 10CFR50 and Revision 3 of the NRC Regulatory Guide 1.70, "Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants

- LWR Edition". Section 17.1, Quality Assurance During Design and Construction, in the PSAR, covered activities occurring up to the turnover of a system, structure, or component by the constructor to IP for checkout and testing. Section 17.2, Quality Assurance During the Operations Phase, describes the Quality Assurance program applicable to activities during the Operations Phase.

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The Quality Assurance Program for design and construction of Clinton Power Station was described in the Illinois Power Nuclear Power Construction Quality Assurance Manual.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Quality Assurance Program for Operation of Clinton Power Station is described in the Quality Assurance Topical Report (QATR) NO-AA-10.