ML19274D100: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19274D101
| number = ML19274D101
| issue date = 01/05/1979
| issue date = 01/05/1979
| title = Forwards LER 78-122/03L-0
| title = LER 78-122/03L-0 on 781208:control Rod 4 of Group 3 Absolute Position Indication Was Erratic Due to Intermittent Failure of a Component within the Position Indicator Tube
| author name = Naylor R
| author name = Naylor R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 07:11, 23 January 2020

Forwards LER 78-122/03L-0
Date released: 10/15/2019 Download: ML19274D100


LER 78-122/03L-0 on 781208:control Rod 4 of Group 3 Absolute Position Indication Was Erratic Due to Intermittent Failure of a Component within the Position Indicator Tube
ML19274D101
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/05/1979
From: Naylor R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19274D101 (3)
Forwards LER 78-122/03L-0
ML19274D099
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/05/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19274D099 (1)