ML19282B711: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19282B717
| number = ML19282B717
| issue date = 03/12/1979
| issue date = 03/12/1979
| title = Forwards LER 79-023/01T-0
| title = LER 79-023/01T-0 on 790228:Startup Transformer 01 Taken Out of Svc;Surveillance Tests Not Performed within One Hour, Contrary to Tech Spec Requirements.Caused by Personnel Error.Testing Completed as Soon as Error Realized
| author name = Brown D
| author name = Brown D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 06:16, 23 January 2020

Forwards LER 79-023/01T-0
Date released: 10/23/2019 Download: ML19282B711


LER 79-023/01T-0 on 790228:Startup Transformer 01 Taken Out of Svc;Surveillance Tests Not Performed within One Hour, Contrary to Tech Spec Requirements.Caused by Personnel Error.Testing Completed as Soon as Error Realized
ML19282B717
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/1979
From: David Brown
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B717 (3)
Forwards LER 79-023/01T-0
ML19282B710
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B710 (1)