ML17284A880: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[GO2-99-170, Monthly Operating Rept for Aug 1999 for WNP-2.With ]]
| number = ML17284A880
| issue date = 08/31/1999
| title = Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000397
| license number =
| contact person =
| document report number = GO2-99-170, NUDOCS 9909170016
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 6
}}
 
=Text=
{{#Wiki_filter:REGULAT RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NOTARIZED: NO              DOCKET FACIL:50-397    WPPSS  Nuclear Project, Unit 2, Washington Public              Powe  05000397 ASH.hggfE              AUTHOR  AFFILIATION KASKO,B.              Washington Public Power Supply System SMITH,G.O~            Washington Public Power Supply System RECIP.NAME            RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating rept        for   Aug 1999   for       2.With 990910 j
WNP ltr.
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per. Tech Specs)
ENCL  L    SIZE:
NOTES:                                                                                              E RECIPIENT            COPIES              RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID  CODE/NAME        LTTR ENCL CUSHING,J                1      1                                                        0 INTERNAL: ACRS                        1      1    ~      CENTER    01        1    1 OC/DBA/PAD                1      1      RES-/BE~ERA~              1    1 RGN4                      1      1 EXTERNAL: LMITCO MARSHALL                    1      NOAC                      1    1 NRC PDR'                  1      1 D,
0
                                                                                                    'E NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE HASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER    OF. COPIES REQUIRED: LTTR          9  ENCL      9
 
          >lJ( ~l"'('
~
  "''P "~
 
NORTH NfEST PO. Box 968 a Richland, Washington 99352-0968 September 10, 1999 GO-99-170 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
 
==Subject:==
WNP-2 OPERATING LICENSE NPI -21 MONTHLYOPERATING REPORT AUGUST 1999 Transmitted herewith is the Monthly Operating Report for the month      of August 1999 as required by Technical Specification 5.6.4.
G. O. Smith Vice President, Generation Mail Drop 927M CC:    EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N TC Poindexter - Winston Ec Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 1399 eioqa700<e 9e083i 05000397 PDR    ADGCK R
PDR
 
  ,P t
 
OPERATING STATUS REPORT for WNP-2 Date:  September 1, 1999 Docket: 50-397
: 2. Reporting Period: August 1999
: 3. Utility Contact: Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                    1153
: 5. Maximum Dependable Capacity - summer (Net MW.):                        1107 MONTH        YEAR CUMULATIVE
: 6. Hours Reactor Critical                        744.0      4,036.5  92,877.8
: 7. Hours Generator On-Line                      744.0      3,965.0  89,839.2
: 8. Unit Reserve Shutdown Hours                      0.0      237.2    3,274.7
: 9. Net Electrical Energy (MWH)                699,997  3,952,130  87,282,061
: 10. Challenges to safety/relief valves:                                    None
 
UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME:          -'2 DATE: September 1,  1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: August, 1999 Type F: Forced        Duration No.        Date      S: Scheduled    (Hours)      Reason (1) Method (2)            Cause and Corrective Action To Prevent Recurrence N/A
 
==SUMMARY==
:
~IREAEON                                                              2 METHOD A - Equipment Failure              E - Operator Training &          1 - Manua B - Mainteaance or Test                    License Examination      2- Manual Scram C Refueling                        F - Administration                3 - Auto Scram D - Regulatory Restriction            -
G Operational Error              4 - Continued H - Olher                        5 - Reduced Load 9 - Other}}

Latest revision as of 06:02, 8 January 2025