ML19261A851: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19261A851 | | number = ML19261A851 | ||
| issue date = 01/30/1979 | | issue date = 01/30/1979 | ||
| title = Ack Receipt of NRC | | title = Ack Receipt of NRC Re Potential Failures of Purge Penetration Valves & Requesting Schedule for Justifying Unlimited Purging.Will Submit Proposed Tech Specs to Limit Purging to 90-h Per Year | ||
| author name = Williams D | | author name = Williams D | ||
| author affiliation = ARKANSAS POWER & LIGHT CO. | | author affiliation = ARKANSAS POWER & LIGHT CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 1-019-17, 1-19-17, NUDOCS 7902080234 | | document report number = 1-019-17, 1-19-17, NUDOCS 7902080234 | ||
| title reference date = 11-29-1978 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 2 | | page count = 2 | ||
| Line 16: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:,. | {{#Wiki_filter:,. | ||
e7 - | |||
g ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501)371-4000 January 30, 1979 1-019-17 Director of Nuclear Reactor Regulation ATTN: | |||
Mr. R.W. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C. | |||
20555 | |||
==Subject:== | ==Subject:== | ||
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File: | Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File: | ||
1510) | |||
Gentlemen: | Gentlemen: | ||
Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either: | Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either: | ||
(1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging. | (1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging. | ||
We are presently attempting to obtain test data on our purge valves from our vendor. Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined. | We are presently attempting to obtain test data on our purge valves from our vendor. | ||
When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours per year and submit our justification for y aur approval. | Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined. | ||
Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of | When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours per year and submit our justification for y aur approval. | ||
We expect to complete this item before April 1,1979. | |||
h | Prior to our submittal and during your review, Arkansas Nuclear One - Unit 1 (ANO-1) will limit purging during operation to 90 hours per year. | ||
Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of h | |||
%Q kkf 7 9 0 2 0 8 0.23 f | |||
( | ( | ||
ueueen u, cote sours uritiries svsreu | |||
f | |||
= | = | ||
Mr. R. W. Reid, Chief January 31, 1979 another. Our review of safety actuation signal circuitry has not revealed any manual override features which unintentionally disables additional safety actuation signal circuits. | |||
Very truly yours, d | |||
Mr. R. W. Reid, Chief | i un Danici 11. Williams Manager, Licensing DilW: ERG:nm}} | ||
Very truly yours, | |||
i | |||
Latest revision as of 11:58, 3 January 2025
| ML19261A851 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/30/1979 |
| From: | David Williams ARKANSAS POWER & LIGHT CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| 1-019-17, 1-19-17, NUDOCS 7902080234 | |
| Download: ML19261A851 (2) | |
Text
,.
e7 -
g ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501)371-4000 January 30, 1979 1-019-17 Director of Nuclear Reactor Regulation ATTN:
Mr. R.W. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File:
1510)
Gentlemen:
Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either:
(1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging.
We are presently attempting to obtain test data on our purge valves from our vendor.
Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined.
When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year and submit our justification for y aur approval.
We expect to complete this item before April 1,1979.
Prior to our submittal and during your review, Arkansas Nuclear One - Unit 1 (ANO-1) will limit purging during operation to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year.
Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of h
%Q kkf 7 9 0 2 0 8 0.23 f
(
ueueen u, cote sours uritiries svsreu
f
=
Mr. R. W. Reid, Chief January 31, 1979 another. Our review of safety actuation signal circuitry has not revealed any manual override features which unintentionally disables additional safety actuation signal circuits.
Very truly yours, d
i un Danici 11. Williams Manager, Licensing DilW: ERG:nm