ML19261A851: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19261A851
| number = ML19261A851
| issue date = 01/30/1979
| issue date = 01/30/1979
| title = Ack Receipt of NRC 781129 Ltr Re Potential Failures of Purge Penetration Valves & Requesting Schedule for Justifying Unlimited Purging.Will Submit Proposed Tech Specs to Limit Purging to 90-h Per Year
| title = Ack Receipt of NRC Re Potential Failures of Purge Penetration Valves & Requesting Schedule for Justifying Unlimited Purging.Will Submit Proposed Tech Specs to Limit Purging to 90-h Per Year
| author name = Williams D
| author name = Williams D
| author affiliation = ARKANSAS POWER & LIGHT CO.
| author affiliation = ARKANSAS POWER & LIGHT CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 1-019-17, 1-19-17, NUDOCS 7902080234
| document report number = 1-019-17, 1-19-17, NUDOCS 7902080234
| title reference date = 11-29-1978
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:,.                                         e7 -     g ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501)371-4000 January 30, 1979 1-019-17 Director of Nuclear Reactor Regulation ATTN:   Mr. R.W. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C. 20555
{{#Wiki_filter:,.
e7 -
g ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501)371-4000 January 30, 1979 1-019-17 Director of Nuclear Reactor Regulation ATTN:
Mr. R.W. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C.
20555


==Subject:==
==Subject:==
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File:     1510)
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File:
1510)
Gentlemen:
Gentlemen:
Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either:
Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either:
(1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging.
(1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging.
We are presently attempting to obtain test data on our purge valves from our vendor. Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined.
We are presently attempting to obtain test data on our purge valves from our vendor.
When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours per year and submit our justification for y aur approval.               We expect to complete this item before April 1,1979.                 Prior to our submittal and during your review, Arkansas Nuclear One - Unit 1 (ANO-1) will limit purging during operation to 90 hours per year.
Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined.
Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of
When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours per year and submit our justification for y aur approval.
                                                                                                '
We expect to complete this item before April 1,1979.
h
Prior to our submittal and during your review, Arkansas Nuclear One - Unit 1 (ANO-1) will limit purging during operation to 90 hours per year.
                                                                                              %Q 7 9 0 2 0 8 0.23 f               ueueen u, cote sours uritiries svsreu
Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of h
%Q kkf 7 9 0 2 0 8 0.23 f
(
(
kkf
ueueen u, cote sours uritiries svsreu


f
=
=
f
Mr. R. W. Reid, Chief January 31, 1979 another. Our review of safety actuation signal circuitry has not revealed any manual override features which unintentionally disables additional safety actuation signal circuits.
  .
Very truly yours, d
Mr. R. W. Reid, Chief                               January 31, 1979 another. Our review of safety actuation signal circuitry has not revealed any manual override features which unintentionally disables additional safety actuation signal circuits.
i un Danici 11. Williams Manager, Licensing DilW: ERG:nm}}
Very truly yours,
                                                                    '
                                                    ,                      ,
i
                                                            <
d        un Danici 11. Williams Manager, Licensing DilW: ERG:nm}}

Latest revision as of 11:58, 3 January 2025

Ack Receipt of NRC Re Potential Failures of Purge Penetration Valves & Requesting Schedule for Justifying Unlimited Purging.Will Submit Proposed Tech Specs to Limit Purging to 90-h Per Year
ML19261A851
Person / Time
Site: Arkansas Nuclear 
Issue date: 01/30/1979
From: David Williams
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
1-019-17, 1-19-17, NUDOCS 7902080234
Download: ML19261A851 (2)


Text

,.

e7 -

g ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501)371-4000 January 30, 1979 1-019-17 Director of Nuclear Reactor Regulation ATTN:

Mr. R.W. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Containment Purging During Operation (File:

1510)

Gentlemen:

Your letter of November 29, 1978, related concerns relative to potential failures of purge penetration valves which could lead to a degradation in containment integrity, and requested either:

(1) A proposed Technical Specification which requires that there be no purging during operation, or (2) A schedule for proposing a Technical Specification which will limit purging to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year and justification by test or by test and analysis, or (3) A schedule for justification of unlimited purging.

We are presently attempting to obtain test data on our purge valves from our vendor.

Ilowever, due to the large number of similar requests, his schedule for submitting this information to us has not been determined.

When we receive the necessary information, we will propose a Technical Specification unich wil) limit purging during operation to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year and submit our justification for y aur approval.

We expect to complete this item before April 1,1979.

Prior to our submittal and during your review, Arkansas Nuclear One - Unit 1 (ANO-1) will limit purging during operation to 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year.

Your letter also requested that we review our safety actuation signal circuits which have a manual override feature to ensure that over-riding of one safety actuation signal does not cause the bypass of h

%Q kkf 7 9 0 2 0 8 0.23 f

(

ueueen u, cote sours uritiries svsreu

f

=

Mr. R. W. Reid, Chief January 31, 1979 another. Our review of safety actuation signal circuitry has not revealed any manual override features which unintentionally disables additional safety actuation signal circuits.

Very truly yours, d

i un Danici 11. Williams Manager, Licensing DilW: ERG:nm