ML19261E189: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:W
: w. ..a W
: w...a Nh VERMONT Y AN KEE NUCLEAR POWER CORPORATION Lw SEVENTY SEVEN GROVE STREET Run. Aso, Ven>t o rr osvon WY 79-66 REPLY TO:
Nh VERMONT Y AN KEE NUCLEAR POWER CORPORATION Lw SEVENTY SEVEN GROVE STREET Run. Aso, Ven>t o rr osvon                   WY 79-66 REPLY TO:
ENGINEERING OFFICE 9NPIKE RO AD W EST B 5 4 ASS A CHUSETTS 01581 TELEPHONE 617-366-9011 May 25, 1979 United States Nuclear Regulatory Con =11ssion Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:
ENGINEERING OFFICE 9NPIKE RO AD W EST B 5     4 ASS A CHUSETTS 01581 TELEPHONE 617-366-9011 May 25, 1979 United States Nuclear Regulatory Con =11ssion Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:   Mr. Boyce H. Grier, Director
Mr. Boyce H. Grier, Director


==References:==
==References:==
(a) License No. DPR-28 (Docket no. 50-271)
(a)
(b) USNRC letter to VYNPC dated May 11, 1979 with enclosure IE Bulletin 79-10
License No. DPR-28 (Docket no. 50-271)
(b)
USNRC letter to VYNPC dated May 11, 1979 with enclosure IE Bulletin 79-10


==Dear Sir:==
==Dear Sir:==
==Subject:==
==Subject:==
Response to I&E Bulletin No. 79-10 The enclosed information is provided in response to Reference (b) .
Response to I&E Bulletin No. 79-10 The enclosed information is provided in response to Reference (b).
Should any additional inforn 2 tion be required relative to this subject, please feel free to contact us.
Should any additional inforn 2 tion be required relative to this subject, please feel free to contact us.
Very truly yours, VERMONT YALIEE NUCLEAR POWER CORPORATION
Very truly yours, VERMONT YALIEE NUCLEAR POWER CORPORATION D. E. Moody hanager of Operations DEM/scw Enclosure BG'l
                                              - . <
-[;. J.
D. E. Moody hanager of Operations DEM/scw Enclosure
u-
                                                              '    BG'l u-    '
)
                                                        -[;. J. )
7907050 $ k h
7907050 $ k                   h


.
IE Bulletin No. 79-10 Date:
IE Bulletin No. 79-10 Date:   May 11, 1979 TABLE 1 Utility: Vermont Yankee Nuclear Power Corp.         Date:     May 25, 1979 Facility: Vermont Yankee Nuclear Power Station Operators             Senior Operators Exam Exam Exam Exam       Exam Exam Exam Exam 1   2     3     4         1     2       3   4
May 11, 1979 TABLE 1 Utility: Vermont Yankee Nuclear Power Corp.
: 1. Action 1: Responses A. Total number fai ad           0   0     0     0         0       0     0   0 annual examination B. Percent that failed annual examination           0   0     0     0         0     0     0   0
Date:
: 2. Action 2:   Responses A. Percent required to       100% 42.8% 100%   50%       50% 46% 50% 70.5%
May 25, 1979 Facility: Vermont Yankee Nuclear Power Station Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1
attend additional lectures operators 4essons               operatorsRessons B. Number of operators attending specified         2/1 1/1 1/1 2/3             3/1 4/1 3/1         6 /.'
2 3
nbinoer of lectures (no           1/2 3/2                     1/2 1/2       4/.
4 1
of operators /no. of         3/2 1/3 2/3                 2/2 1/3 1/3         2, 3 lectures)                               1/4                             1/4
2 3
: 3. Action 3:   Responses A. Total number attending accelerated training           o   0     0     0         0     0       0   0 because < 70 percent on annual written examination B. Percent attending accelerated training           0   0     0     0         0     0       0   0 lesson because < 70 percent on annual written examination
4 1.
                                                                            ,    c' U,
Action 1: Responses A.
                                                                'z > ,8 I
Total number fai ad 0
0 0
0 0
0 0
0 annual examination B.
Percent that failed annual examination 0
0 0
0 0
0 0
0 2.
Action 2:
Responses A.
Percent required to 100% 42.8% 100%
50%
50% 46% 50% 70.5%
attend additional lectures operators 4essons operatorsRessons B.
Number of operators attending specified 2/1 1/1 1/1 2/3 3/1 4/1 3/1 6 /.'
nbinoer of lectures (no 1/2 3/2 1/2 1/2 4/.
of operators /no. of 3/2 1/3 2/3 2/2 1/3 1/3 2, 3 lectures) 1/4 1/4 3.
Action 3:
Responses A.
Total number attending accelerated training o
0 0
0 0
0 0
0 because < 70 percent on annual written examination B.
Percent attending accelerated training 0
0 0
0 0
0 0
0 lesson because < 70 percent on annual written examination c
'z >,8 U,
I


IE Bulletin No. 79-10 Date: May 11, 1979 TABLE 1 (Continued)
IE Bulletin No. 79-10 Date:
Operators           Senior Operators Exam Exam Exam Exam     Exam Exam Exam Exam 1   2     3   4       1   2   3     4 C. Total number attending           0   0     0   0     0     0   0   0 accelerated trainiaa because unsatisfactory oral examination D. Percent attending                           -
May 11, 1979 TABLE 1 (Continued)
accelerated training because unsatisfactory           0   0     0   0     0     0   0,   0 ,
Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1
or'.1 examination
2 3
                                                                              .
4 1
Date of Exam i       sept /Oct 1975
2 3
        *
4 C.
  .            2    June / July 1976 3   May/ June 1977 4   May/ June 1978     .
Total number attending 0
200}}
0 0
0 0
0 0
0 accelerated trainiaa because unsatisfactory oral examination D.
Percent attending accelerated training because unsatisfactory 0
0 0
0 0
0 0,
0 or'.1 examination Date of Exam i sept /Oct 1975 2
June / July 1976 3
May/ June 1977 4
May/ June 1978 200}}

Latest revision as of 10:28, 3 January 2025

Forwards Response to IE Bulletin 79-10 Re Reactor Operator Training
ML19261E189
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/25/1979
From: Moody D
VERMONT YANKEE NUCLEAR POWER CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
WVY-79-66, NUDOCS 7907050255
Download: ML19261E189 (3)


Text

W

w...a Nh VERMONT Y AN KEE NUCLEAR POWER CORPORATION Lw SEVENTY SEVEN GROVE STREET Run. Aso, Ven>t o rr osvon WY 79-66 REPLY TO:

ENGINEERING OFFICE 9NPIKE RO AD W EST B 5 4 ASS A CHUSETTS 01581 TELEPHONE 617-366-9011 May 25, 1979 United States Nuclear Regulatory Con =11ssion Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:

Mr. Boyce H. Grier, Director

References:

(a)

License No. DPR-28 (Docket no. 50-271)

(b)

USNRC letter to VYNPC dated May 11, 1979 with enclosure IE Bulletin 79-10

Dear Sir:

Subject:

Response to I&E Bulletin No. 79-10 The enclosed information is provided in response to Reference (b).

Should any additional inforn 2 tion be required relative to this subject, please feel free to contact us.

Very truly yours, VERMONT YALIEE NUCLEAR POWER CORPORATION D. E. Moody hanager of Operations DEM/scw Enclosure BG'l

-[;. J.

u-

)

7907050 $ k h

IE Bulletin No. 79-10 Date:

May 11, 1979 TABLE 1 Utility: Vermont Yankee Nuclear Power Corp.

Date:

May 25, 1979 Facility: Vermont Yankee Nuclear Power Station Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1

2 3

4 1

2 3

4 1.

Action 1: Responses A.

Total number fai ad 0

0 0

0 0

0 0

0 annual examination B.

Percent that failed annual examination 0

0 0

0 0

0 0

0 2.

Action 2:

Responses A.

Percent required to 100% 42.8% 100%

50%

50% 46% 50% 70.5%

attend additional lectures operators 4essons operatorsRessons B.

Number of operators attending specified 2/1 1/1 1/1 2/3 3/1 4/1 3/1 6 /.'

nbinoer of lectures (no 1/2 3/2 1/2 1/2 4/.

of operators /no. of 3/2 1/3 2/3 2/2 1/3 1/3 2, 3 lectures) 1/4 1/4 3.

Action 3:

Responses A.

Total number attending accelerated training o

0 0

0 0

0 0

0 because < 70 percent on annual written examination B.

Percent attending accelerated training 0

0 0

0 0

0 0

0 lesson because < 70 percent on annual written examination c

'z >,8 U,

I

IE Bulletin No. 79-10 Date:

May 11, 1979 TABLE 1 (Continued)

Operators Senior Operators Exam Exam Exam Exam Exam Exam Exam Exam 1

2 3

4 1

2 3

4 C.

Total number attending 0

0 0

0 0

0 0

0 accelerated trainiaa because unsatisfactory oral examination D.

Percent attending accelerated training because unsatisfactory 0

0 0

0 0

0 0,

0 or'.1 examination Date of Exam i sept /Oct 1975 2

June / July 1976 3

May/ June 1977 4

May/ June 1978 200