ML19242D286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19242D300
| number = ML19242D300
| issue date = 08/09/1979
| issue date = 08/09/1979
| title = Forwards LER 79-079/03L-0
| title = LER 79-079/03L-0 on 790712:while Repositioning Group 8, Absolute Position Indication for Rod 4 Shifted from 25% to 0% Position.Caused by Oxide Film Buildup on Reed Switch Contacts.Corrective Maint Performed
| author name = Naylor R
| author name = Naylor R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 22:49, 23 January 2020

Forwards LER 79-079/03L-0
Date released: 09/13/2019 Download: ML19242D286


LER 79-079/03L-0 on 790712:while Repositioning Group 8, Absolute Position Indication for Rod 4 Shifted from 25% to 0% Position.Caused by Oxide Film Buildup on Reed Switch Contacts.Corrective Maint Performed
ML19242D300
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/09/1979
From: Naylor R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19242D300 (2)
Forwards LER 79-079/03L-0
ML19242D285
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/09/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19242D285 (1)