ML19247B784: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19247B788 | | number = ML19247B788 | ||
| issue date = 08/03/1979 | | issue date = 08/03/1979 | ||
| title = | | title = LER 79-076/03L-0 on 790712:QA Inspector Observed Both Air Lock Doors in Reactor Bldg Open at Same Time,Breaking Containment.Caused by Malfunction in Limit Switches on Doors Causing Momentary Alarms.Repairs Under Consideration | ||
| author name = Nix R | | author name = Nix R | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 20:58, 23 January 2020
Date released: 09/18/2019 | Download: ML19247B784 |
---|---|
ML19247B788 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/03/1979 |
From: | Nix R GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19247B788 (2) | |
ML19247B783 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 08/03/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19247B783 (1) | |