ML19253B003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19253B005
| number = ML19253B005
| issue date = 09/10/1979
| issue date = 09/10/1979
| title = Forwards LER 79-071/03L-0
| title = LER 79-071/03L-0:on 790831,torus Level Was Below Tech Spec Limit.Caused by Failure of Personnel to Monitor Level Decrease Adequately.Level Returned to within Normal Limits. Plant Personnel Reinstructed to Prevent Recurrence
| author name = Baxley S
| author name = Baxley S
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 18:59, 23 January 2020

Forwards LER 79-071/03L-0
Date released: 09/24/2019 Download: ML19253B003


LER 79-071/03L-0:on 790831,torus Level Was Below Tech Spec Limit.Caused by Failure of Personnel to Monitor Level Decrease Adequately.Level Returned to within Normal Limits. Plant Personnel Reinstructed to Prevent Recurrence
ML19253B005
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1979
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253B005 (1)
Forwards LER 79-071/03L-0
ML19253B002
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/10/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253B002 (1)