ML19256A689: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19256A693
| number = ML19256A693
| issue date = 01/02/1979
| issue date = 01/02/1979
| title = Forwards Supplemental Info Sheet of LER 78-101/03L-0
| title = LER 78-101/03L-0,supplemental Info Sheet:On 781005,Component Cooling Water Loop 1 Inoperable Due to Inoperability of Heat Exchanger Outlet Valve.Caused by Missing Nut on Actuator Linkage for Valve.Replaced Linkage Arm Bolt & Set Stroke
| author name =  
| author name =  
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.

Latest revision as of 18:08, 23 January 2020

Forwards Supplemental Info Sheet of LER 78-101/03L-0
Date released: 09/27/2019 Download: ML19256A689


LER 78-101/03L-0,supplemental Info Sheet:On 781005,Component Cooling Water Loop 1 Inoperable Due to Inoperability of Heat Exchanger Outlet Valve.Caused by Missing Nut on Actuator Linkage for Valve.Replaced Linkage Arm Bolt & Set Stroke
ML19256A693
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/02/1979
From:
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256A693 (1)
Forwards Supplemental Info Sheet of LER 78-101/03L-0
ML19256A687
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/02/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256A687 (1)