ML19256G093: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19256G098 | | number = ML19256G098 | ||
| issue date = 12/20/1979 | | issue date = 12/20/1979 | ||
| title = | | title = LER 79-116/03L-0:on 791123,Control Rod Group 5 Rod 11 Absolute Position Indication Declared Inoperable.Caused by Position Indication Assembly & Cabling Between Electrical Penetration & Rod.Investigation Continues | ||
| author name = Werner J | | author name = Werner J | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. |
Latest revision as of 16:13, 23 January 2020
Date released: 09/27/2019 | Download: ML19256G093 |
---|---|
ML19256G098 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/20/1979 |
From: | Werner J TOLEDO EDISON CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19256G098 (3) | |
ML19256G092 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/20/1979 |
From: | Murray T TOLEDO EDISON CO. |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML19256G092 (1) | |