ML19257A894: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257A900
| number = ML19257A900
| issue date = 01/04/1980
| issue date = 01/04/1980
| title = Forwards LER 79-063/03L-0
| title = LER 79-063/03L-0:on 791204,flow Path from Bat a Was Inoperable Due to Outlet Valve Being Closed.Caused by Operator Error & Procedural Deficiencies.Valve Opened & Sys Returned to Operation
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.

Latest revision as of 15:41, 23 January 2020

Forwards LER 79-063/03L-0
Date released: 09/28/2019 Download: ML19257A894


LER 79-063/03L-0:on 791204,flow Path from Bat a Was Inoperable Due to Outlet Valve Being Closed.Caused by Operator Error & Procedural Deficiencies.Valve Opened & Sys Returned to Operation
ML19257A900
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/04/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257A900 (1)
Forwards LER 79-063/03L-0
ML19257A893
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/04/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257A893 (1)