ML19259C262: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19259C265 | | number = ML19259C265 | ||
| issue date = 05/30/1979 | | issue date = 05/30/1979 | ||
| title = | | title = LER 79-041/01T-0 on 790523:during Maint Outage,Review Indicated Solenoid on Reactor Sample Isolation Valve Did Not Have Complete Qualification Testing.Caused by Design Error. Solenoid Will Be Replaced | ||
| author name = Greene T | | author name = Greene T | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 15:08, 23 January 2020
Date released: 09/30/2019 | Download: ML19259C262 |
---|---|
ML19259C265 | |
Person / Time | |
---|---|
Site: | Hatch ![]() |
Issue date: | 05/30/1979 |
From: | Thomas Greene GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19259C265 (3) | |
ML19259C261 | |
Person / Time | |
---|---|
Site: | Hatch ![]() |
Issue date: | 05/30/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19259C261 (1) | |