ML19259C690: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19259C692
| number = ML19259C692
| issue date = 08/03/1979
| issue date = 08/03/1979
| title = Forwards LER 79-013/03L-0
| title = LER 79-013/031-0 on 790712:while Performing Motor Operated Valve Operability Test,Thermal Overload Relay for Pump Suction Valve 1C RHR Tripped & Could Not Be Reopened.Caused by Loose Electrical Connections at Breaker
| author name = Hoeller J
| author name = Hoeller J
| author affiliation = COMMONWEALTH EDISON CO.
| author affiliation = COMMONWEALTH EDISON CO.

Latest revision as of 15:05, 23 January 2020

Forwards LER 79-013/03L-0
Date released: 09/30/2019 Download: ML19259C690


LER 79-013/031-0 on 790712:while Performing Motor Operated Valve Operability Test,Thermal Overload Relay for Pump Suction Valve 1C RHR Tripped & Could Not Be Reopened.Caused by Loose Electrical Connections at Breaker
ML19259C692
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/03/1979
From: Hoeller J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19259C692 (1)
Forwards LER 79-013/03L-0
ML19259C689
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/03/1979
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19259C689 (1)