ML18162A043: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE | {{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE Introduction to Industry Guidance, Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors. | ||
Introduction to Industry Guidance, Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors. | |||
ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 June 19, 2018 Topic Presenter(s) Time | ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 June 19, 2018 Topic Presenter(s) Time | ||
: 1. Opening Remarks Mr. Dennis Bley, ACRS 8:30 - 8:35 AM | : 1. Opening Remarks Mr. Dennis Bley, ACRS 8:30 - 8:35 AM |
Latest revision as of 22:16, 2 February 2020
ML18162A043 | |
Person / Time | |
---|---|
Issue date: | 06/19/2018 |
From: | Derek Widmayer Advisory Committee on Reactor Safeguards |
To: | |
Widmayer D | |
References | |
Download: ML18162A043 (1) | |
Text
AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE Introduction to Industry Guidance, Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors.
ROCKVILLE, MARYLAND June 19, 2018 Cognizant Staff Engineer/DFO: Derek A. Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 June 19, 2018 Topic Presenter(s) Time
- 1. Opening Remarks Mr. Dennis Bley, ACRS 8:30 - 8:35 AM
- 2. Staff Introduction John Segala, NRO 8:35 - 8:40 AM Draft Guidance Paper - Modernization of Technical Requirements for Licensing of Advanced NonLight Water Reactors
- Background George Apostolakis/
- 3.
- Guidance Development Karl Fleming, Licensing 8:40-10:15 AM o Selection of LBEs Modernization Project o PRA Approach o SSC Classification Break 10:15-10:30 AM Draft Guidance Paper (cont.)
- Guidance Development (cont.) George Apostolakis/ 10:30-11:00 AM 4.
o Evaluation of Defense-in-Depth Karl Fleming Staff Review of Draft Guidance
- 5.
- Next Steps
- 6. Subcommittee Discussion Mr. Dennis Bley, ACRS 11:45 AM - Noon Adjourn Noon Notes:
- During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
- Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
- Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
- One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.