ML18219E082: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:f'IIII('    UIIM          lffii                                          U.lie Illlcl.l.AII III;UULA'IIIII'r l UIAlhlb'.illiW I ) U C I".I. l I ) I I M I I I. I)
{{#Wiki_filter:U.lie Illlcl.l.AII III;UULA'IIIII'rl UIAlhlb'.illiW I 10:
IP Ilil                                                                                                                                      SO<I'5S16 F ILI; NU41I)lan NB(: DISTIIIOUTl(worl,f)RflTb0 DOCKLT MRTERIAL+p I
B.C. Rusche, I'IIOM:Indiana
10:                                                            I'IIOM: Indiana        & Michigan Power Co,                  DAT L'l'DCUMCNT B.C. Rusche,                                                New    York, N.Y;              ~                                8-9-76 J. Tillinghast                                        OATS Ill:CI:IVL'D 8-12-76 X.ILI. r Ttrl                        QNOTOIIIZL'D              Pl loP                              INI'UT I OIIM            NUMUIiflOF COPlta III.CI.IV).i, I)?oslo INAL                    SUNcLAsslr Iso LlcoPv MI>CAIPTION                                                                       L'NCLOSUIIS              ~
& Michigan Power Co, New York, N.Y;
Ltr, re.               Our 7-16-76   ltr......
~
Advising that a submittal shall be filed supplyi requested information pertaining to "FIRE PROTEC ION " for Units 8 1 & 2 together by January 31, 1977   ~ ~ ~ ~ ~ ~ ~
J. Tillinghast X.ILI.rTtrl I)?oslo INAL LlcoPv QNOTOIIIZL'D SUNcLAsslr Iso Pl loP INI'UT I OIIM f'IIII(' UIIM lffii IP Ilil NB(: DISTIIIOUTl(worl,f)RflTb0 DOCKLTMRTERIAL+p I)UC I".I. l I )IIMIII. I)
SO<I'5S16 F ILI; NU41I)lan DATL'l'DCUMCNT 8-9-76 OATS Ill:CI:IVL'D 8-12-76 NUMUIiflOF COPlta III.CI.IV).i, MI>CAIPTION Ltr, re.
Our 7-16-76 ltr......
Advising that a submittal shall be filed supplyi requested information pertaining to "FIRE PROTEC ION " for Units 8
1
& 2 together by January 31, 1977
~ ~ ~
~ ~ ~ ~
L'NCLOSUIIS
~
(1 Signed Cy. Received)
(1 Signed Cy. Received)
(1 Page)
(1 Page)
PLANT NAME:                   Cook 8 1 & 2
PLANT NAME:
          . DISTP.XBUTION GF Pil'E PP.OTECTXON PER SHIRI;:Y S'!EPPARD 6-10-76 SAFETY                               FOB ACTION/I                                                                          SAB        8-16-7O Q     ASSXGNED AD:                                                                                     ASSIGli~D i    D
Cook 8
        )RANCH CIIILF:                                       a                            ~Zu)UCE                  CU
1
        '1'OJECT l IANAGER:                         Fletcherl/Benedict                                 PRO,V~V i<I) l gL' Di s Lee                                                          ~
& 2
INTEIINAL0          I? I BUTION
. DISTP.XBUTION GF Pil'E PP.OTECTXON PER SHIRI;:Y S'!EPPARD 6-10-76 SAFETY Q ASSXGNED AD:
      'EG                                       SYSTEMS SAFETY                                    Qlgl~le      rtt
)RANCH CIIILF:
                          '2)
'1'OJECT lIANAGER:
                                                'Sl
FOB ACTION/I a
      .,RC PDR                                   IIEINFHWN                                        EBS C                                ENVX'.?0              h&#xc3;liIgS.,~
Fletcherl/Benedict Di s Lee ASSIGli~D i D
a    E                                 SCIIROEDER                                        ENAROYA                              D~RR        QV~~~~YYi      Y~ .
~Zu)UCE CU PRO,V~V i<I) l gL'
ELD                                                                                   AXHA GOSSICK & STAFF                             ENGXNEEI?XNG                                IPPOLITO                                    E~N\r        iiO~QH MIPC                                       i)IACCARRY                                  KIPl;<.OOD                                  "),H CASE                                       KNIG11T                                                                                          L    K llAliAUER                                   S  II!MI'. IL                              OPERATING REACTORS IIARLES                                     PAWLICKI                                            ~
~
cL PROJECT lfhViAGElfENT                       REACTOR      SAFETl                        OPEPATT I+I~~~CH                            C4I~~L 130YD                                       I?OSS                                      E XSEiN!IUT P                                           NOVAK                                      Sl'fAO COLLINS'IOUSTON ROSZTOCZY                                  BAER                                                                          i Pl) TI'.I? SON                             C11ECK                                      BUTT.ER                                      STRE          A.~ALXSXS=
SAB 8-16-7O
Hl'.LTZ                                                                                 GRXHL'S I IELTEHF.S S KOVlIOLT                                   SALTZHI)N                                                                                                    GIB RUTI3EI? G                                                                                TZZZ EXTE I?NAL DISTf? IDUTION                                                                  CON TfIOL NUii'IBLI)
'EG
        .PUK:           St. Jose     h,'I.         rlh L IJ)I)                                13ROOKIIIAVI;ri lwgP~L))I 4 TXC;                                         REG. VIF.                                  l)LRXKSON (ORNL I- ..'SIC.                                     IA    PDlt ASI.!3:                                     CONSUI.TANTS                                                                                8212 CIllslCY!i m)Mi)'iili/!I'.N Nllc I:onM Iab               {2 )llf                                             ~,             I''
.,RC PDR a
E '2)
ELD GOSSICK & STAFF MIPC CASE llAliAUER IIARLES PROJECT lfhViAGElfENT 130YD P
COLLINS'IOUSTON Pl)TI'.I?SON Hl'.LTZ IIELTEHF.S S KOVlIOLT
.PUK: St. Jose h,'I.
4 TXC; I-..'SIC.
ASI.!3:
CIllslCY!i m)Mi)'iili/!
INTEIINAL0 SYSTEMS SAFETY IIEINFHWN SCIIROEDER ENGXNEEI?XNG i)IACCARRY KNIG11T SII!MI'.IL PAWLICKI REACTOR SAFETl I?OSS NOVAK ROSZTOCZY C11ECK SALTZHI)N RUTI3EI?G EXTEI?NAL DISTf? IDUTION rlh L IJ)I)
REG.
VIF.
IA PDlt CONSUI.TANTS I'.N
'Sl I? I BUTION Qlgl~le rtt EBS C ENAROYA AXHA IPPOLITO KIPl;<.OOD OPERATING REACTORS
~ cL OPEPATT I+I~~~CH E XSEiN!IUT Sl'fAO BAER BUTT.ER GRXHL'S 13ROOKIIIAVI;ri lwgP~L))I l)LRXKSON (ORNL ENVX'.?0 h&#xc3;liIgS.,~
D~RR QV~~~~YYiY~
E~N\\r iiO~QH
"),H L K C4I~~L i
STRE A.~ALXSXS=
GIB TZZZ CON TfIOLNUii'IBLI) 8212 Nllc I:onM Iab {2 )llf
~,
I''


0' i)
0' i)


q;Le
~ y~go~j peg INDIANA 5 MICHIGAN P ER=COMPANY q;Le J',
                                                      ~
peg y~go~j                   J',
INDIANA 5 MICHIGAN             P   ER=COMPANY
: 0. BOX 18 BOWLING GREEN STATION~
: 0. BOX 18 BOWLING GREEN STATION~
NEW YORK N Y, 10004 t 2
NEW YORK N
AQUA,~~          usta,~              6 8    Cf (C Donald C. Cook Nuclear Plant Docket No. 50-315 and 50-316                               ~ECEh DPR No. 58 and CPPR .No. 61                             AUG12 19768 9  PtS. teems aieuurOay COlV4 I SS Ott      pg Nell Sect tott Mr. Benard Rusche,       Director                                               l~
Y, 10004 t
Office of Nuclear Reactor Regulation                                         yF U.S. Nuclear Regulatory Commission Nashington, D.C. 20555
~ECEh AUG12 19768 Donald C.
Cook Nuclear Plant Docket No. 50-315 and 50-316 DPR No.
58 and CPPR.No.
61 2
AQUA,~~
usta,~
6 8
Cf(C Mr. Benard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Nashington, D.C.
20555


==Dear lfr. Rusche:==
==Dear lfr. Rusche:==
9 PtS. teems aieuurOay pg COlV4ISS Ott Nell Sect tott l~
yF This is in response to Mr. Victor Stello, Jr.'s letter of July 16, 1976, which was received on July 19, 1976, requesting that we submit within 20 days of receiving his letter a date when we would submit certain requested information pertaining to fire protection at the Donald, C.
Cook Nuclear Plant Unit No.
1 and the new NRC guidelines in Standard Review Plan,-"9.5.1 "Fire Protection".
This same. information was requested for the Donald C.
Cook Nuclear Plant Unit No.
2 in Mr. Roger S. Boyd's letter to us of July 30, 1976.
This letter was received on August 2, 1976, and gave us 20 days to reply for Unit No. 2.
This response is for both Unit No.
1 and Unit No.
2 of the Donald C.
Cook Nuclear Plant.
Ne shall file a submittal supplying the requested information for both Unit No.
1 and Unit No.
2 together by January 31, 1977.
Very truly yours, cc:
G. Charnoff R. J. Vollen R.
C. Callen P.
W. Steketee R. Nalsh R..S. Hunter R.
N. Jurgensen
- Bridgman ohn T'llingha Vice President


This is in response to Mr. Victor Stello, Jr.'s letter of July 16, 1976, which was received on July 19, 1976, requesting that we submit within 20 days of receiving his letter a date when we would submit certain requested information pertaining to fire protection at the Donald, C. Cook Nuclear Plant Unit No. 1 and the new NRC guidelines in Standard Review Plan,-"9.5.1 "Fire Protection". This same. information was requested for the Donald                        C.
I
Cook Nuclear Plant Unit No. 2 in Mr. Roger S. Boyd's letter to us of July 30, 1976. This letter was received on August 2, 1976, and gave us 20 days to reply for Unit No. 2.
~
This response is for both Unit No. 1 and Unit No. 2 of the Donald C. Cook Nuclear Plant. Ne shall file a submittal supplying the requested information for both Unit No. 1 and Unit No. 2 together by January 31, 1977.
~
Very      truly yours, ohn    T'llingha Vice President cc:  G. Charnoff R. J. Vollen R. C. Callen P. W. Steketee R. Nalsh R..S. Hunter R. N. Jurgensen      -  Bridgman
I I
I
~
I


I        I ~
~
I I ~ ~       I  ~
I ~
I~
~,
              ~,
~
                            ~ ~
~
~ ~
~
~
IV
IV


7 V.S. NVCLE*A AEGVLATOIIYCOMMISSION DOCI'ET NVMOI A f NRC FOIIM 195
7
.
}
IZ 70)                           r.                                                           50-315 t                                                                                               FILE NUMOEA MAC DISTRIBUTI(ggioA.PART 50 DOCKET MATERIAL%K TO:                                             FROM:                                     DATE OF DOCVMf!NT Indiana   & Michigan .Power Co.           8/2/76 Mr. Benard Rusche                      ,New York, N. Y.                         DATE RECEIVED Mr. John   Tillinghast ...'"               8/6/76 PALETTE R                 QNOTORIZED             PROP                   INPVT FOAM         NUfAOEA OF COPIES RECEIVED gPRIGINAL            j8fVNCLASSIFIED QCOP Y                                                                                    One signed DESCRIPTION                                                    ENCLOSURE Ltr. re     our 6/29/76   ltr,.....furnishirig information concerning Inservice Inspection,
f NRC FOIIM 195 V.S. NVCLE*AAEGVLATOIIYCOMMISSION
. IZ 70) r.
t MAC DISTRIBUTI(ggioA.PART 50 DOCKET MATERIAL%K DOCI'ET NVMOI A 50-315 FILE NUMOEA TO:
Mr. Benard Rusche FROM:
Indiana & Michigan.Power Co.
,New York, N. Y.
Mr. John Tillinghast...'"
DATE OF DOCVMf!NT 8/2/76 DATE RECEIVED 8/6/76 PALETTE R gPRIGINAL QCOP Y DESCRIPTION QNOTORIZED j8fVNCLASSIFIED PROP INPVT FOAM ENCLOSURE NUfAOEA OF COPIES RECEIVED One signed Ltr. re our 6/29/76 ltr,.....furnishirig information concerning Inservice Inspection,
(
(
PLANT NAME:
PLANT NAME:
PggQ~
Co.ok f31
Co.ok f31
          'I pO ~Op SAFETY                         ,  FOR ACTION/INFORMATION ASSIGNED AD:                                                         ASSX iNED BRANCH     CHIEF:                 Ziemann                                        AD'RO PROJECT IIANAGER:                                                         E    ~iRNA LXC, ASSTo:                       Diggs                             L INTERNAL D ISTRI BUTION
'I pO ~Op PggQ~
        'GFI                             SYSTEMS SAFETY                                             SITE   SA NRC PDR                          HEXNEMAN                                                    NVIR"O h&#xc3;hg+S~~
SAFETY ASSIGNED AD:
X & E                            SCHROEDER                      BENAROYA GELD GOSSICK & STAFF                  ENGINEERING                    IPPOLXTO MXPC                              MACCARRY                      KIRKHOOD CASE                              KNXGIIT HANAUER                          SXIiMEXL                      OPERATING RFACTORS HARLES                            PAMLXCKI PROJECT IIANAGEIIEN               REACTOR SAFEIIY                OPERATXN    TECI BOYD           h ROSS                          EXSENII P COLLINS                         NOVAK                          SHAO HOUSTON                           ROSZTOCZY                      BAER PETERSON                         CHECK                          BUTLER                      S      N I IELTZ                                                          GRII IES HELTEMF.S                         AT&X SKOVHOLT                         SALTZMAN RUTBERG EXTE RNAL DISTR IOUTION                                      CONTROL NUiVIBER LPDR:     St. Jose h   Mi~       NAT LAB:                       BROGr IIAVElv TXC:                              REGS VXE                      UL'RIKSON ORNL NSX    ~                        LA PDR ASLB:
BRANCH CHIEF:
ACRS       CYS   %8HRH&- FN     ':/
PROJECT IIANAGER:
CONSULTANTS NAC FOAM 19G (2 7III
LXC, ASSTo:
Ziemann Diggs
, FOR ACTION/INFORMATION ASSX iNED AD'RO E
~iRNA L
'GFI NRC PDR X & E GELD GOSSICK & STAFF MXPC CASE HANAUER HARLES INTERNALD SYSTEMS SAFETY HEXNEMAN SCHROEDER ENGINEERING MACCARRY KNXGIIT SXIiMEXL PAMLXCKI ISTRI BUTION BENAROYA IPPOLXTO KIRKHOOD OPERATING RFACTORS SITE SA NVIR"O h&#xc3;hg+S~~
PROJECT IIANAGEIIEN BOYD h
P COLLINS HOUSTON PETERSON IIELTZ HELTEMF.S SKOVHOLT LPDR: St. Jose h
Mi~
TXC:
NSX
~
ASLB:
REACTOR SAFEIIY ROSS NOVAK ROSZTOCZY CHECK AT&X SALTZMAN RUTBERG EXTERNAL DISTR IOUTION NAT LAB:
REGS VXE LA PDR CONSULTANTS OPERATXN TECI EXSENII SHAO BAER BUTLER GRIIIES BROGr IIAVElv UL'RIKSON ORNL S
N CONTROL NUiVIBER ACRS CYS
%8HRH&- FN ':/
NAC FOAM 19G (2 7III


W 4
W 4
    ~ ~
~
        ~ >'
~
~ >'
I
I
                        ~ ~ 4 ~ ~ ~
~ ~ 4 ~ ~ ~
            ~ n '''p i("~'
~
n
'''p i("~'
(
(
                  *1 h
*1 h


INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004 Donald C. Cook Nuclear Plant Docket No. 50-315 y    Rf)f~
INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BOWLING GREEN STATION Donald C.
License No. DPR-58                     AUG 8 t976I v.S. tease ~gI4gg   I   Augus    1976 IRegUIatop DockeII Rt~              CCWJA jes
Cook Docket No. 50-315 License No.
                                              ++ QASI  8&#xb9; Mr. Benard Rusche,     Director                                       ~+  p Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 205//
DPR-58 IRegUIatop DockeII Rt~
AUG 8 t976I v.S. tease ~gI4gg I
CCWJAjes8&#xb9;
++QASI NEW YORK, N. Y. 10004 Nuclear Plant y
Rf)f~
Augus 1976 Mr. Benard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
205//


==Dear Mr,==
==Dear Mr,==
Rusche:
Rusche:
This   is in   response   to Mr. Karl Kniel's le of June 29, 1976, which 1ras received. on July 2, 1976, requesting: (a) the date on which our               facility's next 40 month ASME Section Xl inservice inspection period commences and; (b) the date of submittal of an amendment request to the Appendix "A" Technical Specification to conform to certain ASME Section Xl inservice inspection and testing requirements.
This is in response to Mr. Karl Kniel's le of June 29, 1976, which 1ras received.
In response to part (a) of the above request, please be advised. that the date of commercial operation of the Donald C. Cook Nuclear Plant Unit No. 1 was August 23, 1975. Therefore, the date on which our next regular 40 month inspection period begins is December 24, 1978.
on July 2, 1976, requesting:
(a) the date on which our facility's next 40 month ASME Section Xl inservice inspection period commences and; (b) the date of submittal of an amendment request to the Appendix "A" Technical Specification to conform to certain ASME Section Xl inservice inspection and testing requirements.
~+ p In response to part (a) of the above request, please be advised. that the date of commercial operation of the Donald C.
Cook Nuclear Plant Unit No.
1 was August 23, 1975.
Therefore, the date on which our next regular 40 month inspection period begins is December 24, 1978.
The regulations require us to perform the inspections for this period and. each succeeding 40 month cycle to the code edition and addenda in effect 6 months prior to the start of the new cycle, to the extent practical within the limitations of design, geometry and materials of construction.
The regulations require us to perform the inspections for this period and. each succeeding 40 month cycle to the code edition and addenda in effect 6 months prior to the start of the new cycle, to the extent practical within the limitations of design, geometry and materials of construction.
This edition would. be the winter of 1977 addendum for the period beginning December 24, 1978.
This edition would. be the winter of 1977 addendum for the period beginning December 24, 1978.
Your letter states that a technical specification amendment request required to meet the inservice inspection and testing requirements of the Code of Federal Regulations must be submitted 6 months prior to the start of the next regular 40 month inspection period. For the 40 month period beginning December 2I+, 1978, this amendment request is due in June, 1978. Although an amendment can be requested that will conform to the suggested. wording in the Enclosure to your July 2, 1976 letter, these words are not meaningful because they do not detail the inspection to be carried. out.
Your letter states that a technical specification amendment request required to meet the inservice inspection and testing requirements of the Code of Federal Regulations must be submitted 6 months prior to the start of the next regular 40 month inspection period.
For the 40 month period beginning December 2I+, 1978, this amendment request is due in June, 1978.
Although an amendment can be requested that will conform to the suggested.
wording in the Enclosure to your {{letter dated|date=July 2, 1976|text=July 2, 1976 letter}}, these words are not meaningful because they do not detail the inspection to be carried. out.
7930
7930


0
0
                                                ~ . ~
~
                            ~   ~
~
, II 1 1
~
II
~
                            )
, II 1
III I
1 II III
                            ~ 'L
)
                            ~     g (
I
l a
~ 'L
I I,
~
g
(
l I
I, a
4 h
4 h
                                        't 4
't II 4
II


Mr. Benard   R   'he                                   August 2, 1976
Mr. Benard R
'he August 2, 1976
<"We believe the proper approach is to submit to you the inspections that can be performed and request relief for those that cannot be performed.
<"We believe the proper approach is to submit to you the inspections that can be performed and request relief for those that cannot be performed.
We are concerned with the feasibility of meeting ASME Code   requirements issued, shortly (less than one year) before the next 40 month inspection period due to the potentially long lead time necessary to evaluate the new or revised requirements and to develop the program necessary to implement them where practical or to compile the information supporting any determinations that conformance with certain ASME code requirements is impracticable.
We are concerned with the feasibility of meeting ASME Code requirements issued, shortly (less than one year) before the next 40 month inspection period due to the potentially long lead time necessary to evaluate the new or revised requirements and to develop the program necessary to implement them where practical or to compile the information supporting any determinations that conformance with certain ASME code requirements is impracticable.
Also, a subsequent time period is required to plan, contract for, and obtain new tools for the physical task of conducting an inspection.     Therefore, if the addenda in effect 6 months prior to a new inspection period were extensive we may well not be able to meet their requirements and, we may well have to fall back to an earlier addenda.
: Also, a subsequent time period is required to plan, contract for, and obtain new tools for the physical task of conducting an inspection.
Therefore, if the addenda in effect 6 months prior to a new inspection period were extensive we may well not be able to meet their requirements and, we may well have to fall back to an earlier addenda.
Please note that for the first 40 month cycle which commenced at the start of commercial operation, we are performing our ASME Section XI inspection and. testing in accordance with our existing Technical Specification.
Please note that for the first 40 month cycle which commenced at the start of commercial operation, we are performing our ASME Section XI inspection and. testing in accordance with our existing Technical Specification.
Paragraph 2 of your letter is unclear regarding the require-ments for the initial cycle. Since their issuance, we have interpreted. the regulations 10 CFR 50.5$ (a) (g) (4)
Paragraph 2 of your letter is unclear regarding the require-ments for the initial cycle.
(v) to allow inspections during this initial 40 month cycle in accordance with our existing Technical Specifications, and accordingly we have not undertaken the planning and development that would permit us to perform the additional inspection in this period to the new regulations effective September   1, 1976.
Since their issuance, we have interpreted.
Very truly yours, ZZ/ jd                                      Vice Presiden cc: R. C. Callen
the regulations 10 CFR 50.5$ (a) (g) (4)
: p. W. Steketee R. Walsh
(v) to allow inspections during this initial 40 month cycle in accordance with our existing Technical Specifications, and accordingly we have not undertaken the planning and development that would permit us to perform the additional inspection in this period to the new regulations effective September 1, 1976.
      ~
ZZ/jd Very truly yours, Vice Presiden cc: R.
R. J. Vollen R. S. Hunter R. W. Jurgensen-Bridgman G. Charnoff
p.
R.
~ R.
R.
R.
G.
C. Callen W. Steketee Walsh J. Vollen S. Hunter W. Jurgensen-Bridgman Charnoff


C 4
C 4
4w J I ~
4w J
            )
I
U}}
~
U
)}}

Latest revision as of 15:29, 5 January 2025

Response to Letter of 7/16 & 7/31/1976, Advising, Will Submit Requested Information on Fire Protection for Both Units 1 & 2 by 1/31/1977
ML18219E082
Person / Time
Site: Cook  
Issue date: 08/09/1976
From: Tillinghast J
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18219E082 (10)


Text

U.lie Illlcl.l.AII III;UULA'IIIII'rl UIAlhlb'.illiW I 10:

B.C. Rusche, I'IIOM:Indiana

& Michigan Power Co, New York, N.Y;

~

J. Tillinghast X.ILI.rTtrl I)?oslo INAL LlcoPv QNOTOIIIZL'D SUNcLAsslr Iso Pl loP INI'UT I OIIM f'IIII(' UIIM lffii IP Ilil NB(: DISTIIIOUTl(worl,f)RflTb0 DOCKLTMRTERIAL+p I)UC I".I. l I )IIMIII. I)

SO<I'5S16 F ILI; NU41I)lan DATL'l'DCUMCNT 8-9-76 OATS Ill:CI:IVL'D 8-12-76 NUMUIiflOF COPlta III.CI.IV).i, MI>CAIPTION Ltr, re.

Our 7-16-76 ltr......

Advising that a submittal shall be filed supplyi requested information pertaining to "FIRE PROTEC ION " for Units 8

1

& 2 together by January 31, 1977

~ ~ ~

~ ~ ~ ~

L'NCLOSUIIS

~

(1 Signed Cy. Received)

(1 Page)

PLANT NAME:

Cook 8

1

& 2

. DISTP.XBUTION GF Pil'E PP.OTECTXON PER SHIRI;:Y S'!EPPARD 6-10-76 SAFETY Q ASSXGNED AD:

)RANCH CIIILF:

'1'OJECT lIANAGER:

FOB ACTION/I a

Fletcherl/Benedict Di s Lee ASSIGli~D i D

~Zu)UCE CU PRO,V~V i<I) l gL'

~

SAB 8-16-7O

'EG

.,RC PDR a

E '2)

ELD GOSSICK & STAFF MIPC CASE llAliAUER IIARLES PROJECT lfhViAGElfENT 130YD P

COLLINS'IOUSTON Pl)TI'.I?SON Hl'.LTZ IIELTEHF.S S KOVlIOLT

.PUK: St. Jose h,'I.

4 TXC; I-..'SIC.

ASI.!3:

CIllslCY!i m)Mi)'iili/!

INTEIINAL0 SYSTEMS SAFETY IIEINFHWN SCIIROEDER ENGXNEEI?XNG i)IACCARRY KNIG11T SII!MI'.IL PAWLICKI REACTOR SAFETl I?OSS NOVAK ROSZTOCZY C11ECK SALTZHI)N RUTI3EI?G EXTEI?NAL DISTf? IDUTION rlh L IJ)I)

REG.

VIF.

IA PDlt CONSUI.TANTS I'.N

'Sl I? I BUTION Qlgl~le rtt EBS C ENAROYA AXHA IPPOLITO KIPl;<.OOD OPERATING REACTORS

~ cL OPEPATT I+I~~~CH E XSEiN!IUT Sl'fAO BAER BUTT.ER GRXHL'S 13ROOKIIIAVI;ri lwgP~L))I l)LRXKSON (ORNL ENVX'.?0 hÃliIgS.,~

D~RR QV~~~~YYiY~

E~N\\r iiO~QH

"),H L K C4I~~L i

STRE A.~ALXSXS=

GIB TZZZ CON TfIOLNUii'IBLI) 8212 Nllc I:onM Iab {2 )llf

~,

I

0' i)

~ y~go~j peg INDIANA 5 MICHIGAN P ER=COMPANY q;Le J',

0. BOX 18 BOWLING GREEN STATION~

NEW YORK N

Y, 10004 t

~ECEh AUG12 19768 Donald C.

Cook Nuclear Plant Docket No. 50-315 and 50-316 DPR No.

58 and CPPR.No.

61 2

AQUA,~~

usta,~

6 8

Cf(C Mr. Benard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Nashington, D.C.

20555

Dear lfr. Rusche:

9 PtS. teems aieuurOay pg COlV4ISS Ott Nell Sect tott l~

yF This is in response to Mr. Victor Stello, Jr.'s letter of July 16, 1976, which was received on July 19, 1976, requesting that we submit within 20 days of receiving his letter a date when we would submit certain requested information pertaining to fire protection at the Donald, C.

Cook Nuclear Plant Unit No.

1 and the new NRC guidelines in Standard Review Plan,-"9.5.1 "Fire Protection".

This same. information was requested for the Donald C.

Cook Nuclear Plant Unit No.

2 in Mr. Roger S. Boyd's letter to us of July 30, 1976.

This letter was received on August 2, 1976, and gave us 20 days to reply for Unit No. 2.

This response is for both Unit No.

1 and Unit No.

2 of the Donald C.

Cook Nuclear Plant.

Ne shall file a submittal supplying the requested information for both Unit No.

1 and Unit No.

2 together by January 31, 1977.

Very truly yours, cc:

G. Charnoff R. J. Vollen R.

C. Callen P.

W. Steketee R. Nalsh R..S. Hunter R.

N. Jurgensen

- Bridgman ohn T'llingha Vice President

I

~

~

I I

I

~

I

~

I ~

~,

~

~

~

~

IV

7

}

f NRC FOIIM 195 V.S. NVCLE*AAEGVLATOIIYCOMMISSION

. IZ 70) r.

t MAC DISTRIBUTI(ggioA.PART 50 DOCKET MATERIAL%K DOCI'ET NVMOI A 50-315 FILE NUMOEA TO:

Mr. Benard Rusche FROM:

Indiana & Michigan.Power Co.

,New York, N. Y.

Mr. John Tillinghast...'"

DATE OF DOCVMf!NT 8/2/76 DATE RECEIVED 8/6/76 PALETTE R gPRIGINAL QCOP Y DESCRIPTION QNOTORIZED j8fVNCLASSIFIED PROP INPVT FOAM ENCLOSURE NUfAOEA OF COPIES RECEIVED One signed Ltr. re our 6/29/76 ltr,.....furnishirig information concerning Inservice Inspection,

(

PLANT NAME:

Co.ok f31

'I pO ~Op PggQ~

SAFETY ASSIGNED AD:

BRANCH CHIEF:

PROJECT IIANAGER:

LXC, ASSTo:

Ziemann Diggs

, FOR ACTION/INFORMATION ASSX iNED AD'RO E

~iRNA L

'GFI NRC PDR X & E GELD GOSSICK & STAFF MXPC CASE HANAUER HARLES INTERNALD SYSTEMS SAFETY HEXNEMAN SCHROEDER ENGINEERING MACCARRY KNXGIIT SXIiMEXL PAMLXCKI ISTRI BUTION BENAROYA IPPOLXTO KIRKHOOD OPERATING RFACTORS SITE SA NVIR"O hÃhg+S~~

PROJECT IIANAGEIIEN BOYD h

P COLLINS HOUSTON PETERSON IIELTZ HELTEMF.S SKOVHOLT LPDR: St. Jose h

Mi~

TXC:

NSX

~

ASLB:

REACTOR SAFEIIY ROSS NOVAK ROSZTOCZY CHECK AT&X SALTZMAN RUTBERG EXTERNAL DISTR IOUTION NAT LAB:

REGS VXE LA PDR CONSULTANTS OPERATXN TECI EXSENII SHAO BAER BUTLER GRIIIES BROGr IIAVElv UL'RIKSON ORNL S

N CONTROL NUiVIBER ACRS CYS

%8HRH&- FN ':/

NAC FOAM 19G (2 7III

W 4

~

~

~ >'

I

~ ~ 4 ~ ~ ~

~

n

p i("~'

(

  • 1 h

INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BOWLING GREEN STATION Donald C.

Cook Docket No. 50-315 License No.

DPR-58 IRegUIatop DockeII Rt~

AUG 8 t976I v.S. tease ~gI4gg I

CCWJAjes8¹

++QASI NEW YORK, N. Y. 10004 Nuclear Plant y

Rf)f~

Augus 1976 Mr. Benard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

205//

Dear Mr,

Rusche:

This is in response to Mr. Karl Kniel's le of June 29, 1976, which 1ras received.

on July 2, 1976, requesting:

(a) the date on which our facility's next 40 month ASME Section Xl inservice inspection period commences and; (b) the date of submittal of an amendment request to the Appendix "A" Technical Specification to conform to certain ASME Section Xl inservice inspection and testing requirements.

~+ p In response to part (a) of the above request, please be advised. that the date of commercial operation of the Donald C.

Cook Nuclear Plant Unit No.

1 was August 23, 1975.

Therefore, the date on which our next regular 40 month inspection period begins is December 24, 1978.

The regulations require us to perform the inspections for this period and. each succeeding 40 month cycle to the code edition and addenda in effect 6 months prior to the start of the new cycle, to the extent practical within the limitations of design, geometry and materials of construction.

This edition would. be the winter of 1977 addendum for the period beginning December 24, 1978.

Your letter states that a technical specification amendment request required to meet the inservice inspection and testing requirements of the Code of Federal Regulations must be submitted 6 months prior to the start of the next regular 40 month inspection period.

For the 40 month period beginning December 2I+, 1978, this amendment request is due in June, 1978.

Although an amendment can be requested that will conform to the suggested.

wording in the Enclosure to your July 2, 1976 letter, these words are not meaningful because they do not detail the inspection to be carried. out.

7930

0

~

~

~

~

, II 1

1 II III

)

I

~ 'L

~

g

(

l I

I, a

4 h

't II 4

Mr. Benard R

'he August 2, 1976

<"We believe the proper approach is to submit to you the inspections that can be performed and request relief for those that cannot be performed.

We are concerned with the feasibility of meeting ASME Code requirements issued, shortly (less than one year) before the next 40 month inspection period due to the potentially long lead time necessary to evaluate the new or revised requirements and to develop the program necessary to implement them where practical or to compile the information supporting any determinations that conformance with certain ASME code requirements is impracticable.

Also, a subsequent time period is required to plan, contract for, and obtain new tools for the physical task of conducting an inspection.

Therefore, if the addenda in effect 6 months prior to a new inspection period were extensive we may well not be able to meet their requirements and, we may well have to fall back to an earlier addenda.

Please note that for the first 40 month cycle which commenced at the start of commercial operation, we are performing our ASME Section XI inspection and. testing in accordance with our existing Technical Specification.

Paragraph 2 of your letter is unclear regarding the require-ments for the initial cycle.

Since their issuance, we have interpreted.

the regulations 10 CFR 50.5$ (a) (g) (4)

(v) to allow inspections during this initial 40 month cycle in accordance with our existing Technical Specifications, and accordingly we have not undertaken the planning and development that would permit us to perform the additional inspection in this period to the new regulations effective September 1, 1976.

ZZ/jd Very truly yours, Vice Presiden cc: R.

p.

R.

~ R.

R.

R.

G.

C. Callen W. Steketee Walsh J. Vollen S. Hunter W. Jurgensen-Bridgman Charnoff

C 4

4w J

I

~

U

)