ML19092A362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19092A362
| number = ML19092A362
| issue date = 04/02/2019
| issue date = 04/02/2019
| title = Audit Summary for the Regulatory Audit of Nuscale Power, LLC Design Certification Application Final Safety Analysis Report Section 4.2, Fuel Systems Design, Section 4.3, Nuclear Design, and Section 4.4, Thermal and Hydraulic Design - Memo
| title = Audit Summary for the Regulatory Audit of NuScale Power, LLC Design Certification Application Final Safety Analysis Report Section 4.2, Fuel Systems Design, Section 4.3, Nuclear Design, and Section 4.4, Thermal and Hydraulic Design - Memo
| author name = Bavol B
| author name = Bavol B
| author affiliation = NRC/NRO/DLSE/LB1
| author affiliation = NRC/NRO/DLSE/LB1
Line 13: Line 13:
| document type = Memoranda
| document type = Memoranda
| page count = 2
| page count = 2
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION April 2, 2019 MEMORANDUM TO:                 Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM:                         Bruce M. Bavol, Project Manager /RA/
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION April 2, 2019 MEMORANDUM TO:
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM:
Bruce M. Bavol, Project Manager /RA/
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 29:
FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN The U.S. Nuclear Regulatory Commission staff conducted an audit from March 19, 2018 until April 30, 2018, to review Final Safety Evaluation Report (FSAR) Sections 4.2, Fuel Systems Design, 4.3, Nuclear Design, and 4.4, Thermal and Hydraulic Design. The purpose of the NRCs regulatory audit of NuScales TR was to: (1) gain a better understanding of the bases underlying the NuScale Subchannel Analysis Methodology and confirm the staffs understanding; (2) better understand if the methodology meets NRC regulations and conforms to any applicable regulatory guidance; and; (3) develop requests for additional information (RAI).
FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN The U.S. Nuclear Regulatory Commission staff conducted an audit from March 19, 2018 until April 30, 2018, to review Final Safety Evaluation Report (FSAR) Sections 4.2, Fuel Systems Design, 4.3, Nuclear Design, and 4.4, Thermal and Hydraulic Design. The purpose of the NRCs regulatory audit of NuScales TR was to: (1) gain a better understanding of the bases underlying the NuScale Subchannel Analysis Methodology and confirm the staffs understanding; (2) better understand if the methodology meets NRC regulations and conforms to any applicable regulatory guidance; and; (3) develop requests for additional information (RAI).
The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.
The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.
Project No. 0769                                             Document transmitted herewith contains sensitive unclassified information. When separated from the
Project No. 0769  


==Enclosures:==
==Enclosures:==
enclosure, this document is
: 1. Audit Summary - (Non-Proprietary)
: 1. Audit Summary - (Non-Proprietary)                         DECONTROLLED.
: 2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)
: 2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)
CONTACT:       Bruce Bavol, NRO/DLSE 301-415-6715 OFFICIAL USE ONLY - PROPRIETARY INFORMATION
CONTACT:
Bruce Bavol, NRO/DLSE 301-415-6715 Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.


OFFICIAL USE ONLY - PROPRIETARY INFORMATION
OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION  


==SUBJECT:==
==SUBJECT:==
Line 41: Line 45:
FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN DATED: April 2, 2019 DISTRIBUTION:
FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN DATED: April 2, 2019 DISTRIBUTION:
PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter BKaras, NRO JSchmidt GCranston, NRO CVWert, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra ADAMS Accession Number:
PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter BKaras, NRO JSchmidt GCranston, NRO CVWert, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra ADAMS Accession Number:
Pkg: ML19092A359 Memo: ML19092A362 Enclosure No. 2: ML19092A361               *via email     NRO-002 NRO/DLSE/LB1:     NRO/DLSE/LB1:  NRO/DSRA/SRSB    NRO/DLSE/LB1 OFFICE                    (LA)            (BC)            (BC)
Pkg: ML19092A359 Memo: ML19092A362 Enclosure No. 2: ML19092A361  
*via email NRO-002 OFFICE NRO/DLSE/LB1:
(PM)
(PM)
NAME   BBavol             MMoore         BKaras           SLee DATE   04/02/2019         03/27/2019     04/02/2019       04/02/2019 OFFICIAL RECORD COPY OFFICIAL USE ONLY - PROPRIETARY INFORMATION}}
NRO/DLSE/LB1:
(LA)
NRO/DSRA/SRSB (BC)
NRO/DLSE/LB1 (BC)
NAME BBavol MMoore BKaras SLee DATE 04/02/2019 03/27/2019 04/02/2019 04/02/2019 OFFICIAL RECORD COPY}}

Latest revision as of 03:55, 5 January 2025

Audit Summary for the Regulatory Audit of NuScale Power, LLC Design Certification Application Final Safety Analysis Report Section 4.2, Fuel Systems Design, Section 4.3, Nuclear Design, and Section 4.4, Thermal and Hydraulic Design - Memo
ML19092A362
Person / Time
Site: PROJ0769
Issue date: 04/02/2019
From: Bavol B
NRC/NRO/DLSE/LB1
To: Samson Lee
NRC/NRO/DLSE/LB1
Bavol B
Shared Package
ML19092A359 List:
References
Download: ML19092A362 (2)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION April 2, 2019 MEMORANDUM TO:

Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM:

Bruce M. Bavol, Project Manager /RA/

Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

AUDIT

SUMMARY

FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN The U.S. Nuclear Regulatory Commission staff conducted an audit from March 19, 2018 until April 30, 2018, to review Final Safety Evaluation Report (FSAR) Sections 4.2, Fuel Systems Design, 4.3, Nuclear Design, and 4.4, Thermal and Hydraulic Design. The purpose of the NRCs regulatory audit of NuScales TR was to: (1) gain a better understanding of the bases underlying the NuScale Subchannel Analysis Methodology and confirm the staffs understanding; (2) better understand if the methodology meets NRC regulations and conforms to any applicable regulatory guidance; and; (3) develop requests for additional information (RAI).

The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.

Project No. 0769

Enclosures:

1. Audit Summary - (Non-Proprietary)
2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)

CONTACT:

Bruce Bavol, NRO/DLSE 301-415-6715 Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION

SUBJECT:

AUDIT

SUMMARY

FOR THE REGULATORY AUDIT OF NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION FINAL SAFETY ANALYSIS REPORT SECTION 4.2, FUEL SYSTEMS DESIGN, SECTION 4.3, NUCLEAR DESIGN, AND SECTION 4.4, THERMAL AND HYDRAULIC DESIGN DATED: April 2, 2019 DISTRIBUTION:

PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter BKaras, NRO JSchmidt GCranston, NRO CVWert, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra ADAMS Accession Number:

Pkg: ML19092A359 Memo: ML19092A362 Enclosure No. 2: ML19092A361

  • via email NRO-002 OFFICE NRO/DLSE/LB1:

(PM)

NRO/DLSE/LB1:

(LA)

NRO/DSRA/SRSB (BC)

NRO/DLSE/LB1 (BC)

NAME BBavol MMoore BKaras SLee DATE 04/02/2019 03/27/2019 04/02/2019 04/02/2019 OFFICIAL RECORD COPY