ML19253B821: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19253B821
| number = ML19253B821
| issue date = 10/09/1979
| issue date = 10/09/1979
| title = Responds to 790925 Ltr Requesting Addl Info Re IE Bulletin 79-01, Environ Qualification of Class IE Equipment. Forwards Equipment Descriptions.Describes Insp Methods Used in Verifying Components & Mods to Transmitters
| title = Responds to Requesting Addl Info Re IE Bulletin 79-01, Environ Qualification of Class IE Equipment. Forwards Equipment Descriptions.Describes Insp Methods Used in Verifying Components & Mods to Transmitters
| author name = Fay C
| author name = Fay C
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| author affiliation = WISCONSIN ELECTRIC POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7910220282
| document report number = NUDOCS 7910220282
| title reference date = 09-25-1979
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
| page count = 4
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:Tll 1
Tll
Wisconsin Electnc rom cower 231 W. MICHIGAN, P.O. BOX 2046. MitWAUKEE, WI 53201 October 9, 1979 Mr. J. G. Keppler, Director Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. R. F. Heishman Gentlemen:
.                            1 Wisconsin Electnc rom cower 231 W. MICHIGAN, P.O. BOX 2046. MitWAUKEE, WI 53201
                                                                                .
                                                                                ,
      .
October 9, 1979 Mr. J. G. Keppler, Director Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. R. F. Heishman Gentlemen:
                                '
DOCKET NOS. 50-266 AND 50-301 IE BULLETIN 79-01 ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT
DOCKET NOS. 50-266 AND 50-301 IE BULLETIN 79-01 ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT
                                                                        ~
~
                                                                              .
This is in response to your letter of September 25, 1979, requesting additional information in response to IE Bulletin 79-01 The additional infor-mation is as follows:
This is in response to your letter of September 25, 1979, requesting additional information in response to IE Bulletin 79-01 The additional infor-mation is as follows:
: 1. The equipment descriptions are included in the attached Table A.
1.
2     Several methcds were used to verify that the components included in our equipment description are, in fact, installed and are the same as those for which qualifi-cation documentation exists. These methods include a combination of direct observation by plant personnel,             _
The equipment descriptions are included in the attached Table A.
_
2 Several methcds were used to verify that the components included in our equipment description are, in fact, installed and are the same as those for which qualifi-cation documentation exists. These methods include a combination of direct observation by plant personnel, review of maintenance records, and review of original purchase docurants.
review of maintenance records, and review of original purchase docurants.
3.
: 3. The limit switches identified as Item 5 in our response to Bulletin 79-01 provide valve position indication in the control room for the air operated containment isola-tion valves located inside containment. These switches
The limit switches identified as Item 5 in our response to Bulletin 79-01 provide valve position indication in the control room for the air operated containment isola-tion valves located inside containment. These switches are environmentall:- qualified as described in our response to Bulletin 79-01 4
        ,        are environmentall:- qualified as described in our response
        -
to Bulletin 79-01 4
The modifications to the Foxboro transmitters were:
The modifications to the Foxboro transmitters were:
a) Liberal use of RTV sealant in the conduit connections; b) Breather assembly replaced with a blow-out disc;               1150  1 34 7 910220 EN DCT 111979
a) Liberal use of RTV sealant in the conduit connections; 1150 34 1
b) Breather assembly replaced with a blow-out disc; 7 910220 EN DCT 111979


    ,
Mr. J. G. Keppler, Director October 9,1979 4.
  ',  Mr. J. G. Keppler, Director                   October 9,1979
c) Viton 0-rings for cover and zero adjustment; and d) Teflon lead wires.
'
  .
: 4. c) Viton 0-rings for cover and zero adjustment; and d) Teflon lead wires.
AslistedinourresponsetoBulletin79-01,themodifiedi transmitters will perform their intended safety function -
AslistedinourresponsetoBulletin79-01,themodifiedi transmitters will perform their intended safety function -
under the specific LOCA conditions to which they would be
under the specific LOCA conditions to which they would be exposed. Chemical spray is not applicable since the intended function of the transmitters would be completed prior to chemical spray initiation.
          -
5.
exposed. Chemical spray is not applicable since the intended function of the transmitters would be completed prior to chemical spray initiation.
Ancillary components and parts were qualified with, and as part of, the equipment listed in our response to Bulletin 79-01.
: 5. Ancillary components and parts were qualified with, and as part of, the equipment listed in our response to Bulletin 79-01. In all cases where safety-related equipment is involved, maintenance or replacement parts are replaced with like parts. Substitution is not allowed. Should a part be no longer available, a substitute will be used only when it has been determined that the substitute part has been qualified and is equal to or better than the original part for the intended service.
In all cases where safety-related equipment is involved, maintenance or replacement parts are replaced with like parts. Substitution is not allowed. Should a part be no longer available, a substitute will be used only when it has been determined that the substitute part has been qualified and is equal to or better than the original part for the intended service.
                          ,
While we do not have much difficulty in providing this requested information in this case, we believe that the seven-day response time you requested is inappropriate.
While we do not have much difficulty in providing this requested information in this case, we believe that the seven-day response time you requested is inappropriate. It appears arbitrary and unreasonable to require a seven-day response when the original Bulletin allowed 120 days for our review and our response to that Bulletin has been in your hands for over three months.
It appears arbitrary and unreasonable to require a seven-day response when the original Bulletin allowed 120 days for our review and our response to that Bulletin has been in your hands for over three months.
The numerous bulletins from your office and additional requests for infonnati.on and action from NRR are placing unprecedented burdens on licensees, resulting in diversion of strategic personnel. We are sure you are aware that we are trying to make full and complete responses to these many inquiries in a timely manner without jeopardizing the safety of our nuclear plant operations.
The numerous bulletins from your office and additional requests for infonnati.on and action from NRR are placing unprecedented burdens on licensees, resulting in diversion of strategic personnel. We are sure you are aware that we are trying to make full and complete responses to these many inquiries in a timely manner without jeopardizing the safety of our nuclear plant operations.
Your understanding and cooperation in this regard is appreciated.
Your understanding and cooperation in this regard is appreciated.
Very truly yours, C. W. Fay, Director Nuclear Power Department Attachments
Very truly yours, C. W. Fay, Director Nuclear Power Department Attachments i
            .
L 1150 i35
:
i L
1150 i35


1     _ _ - ...
1 TABLE A EQUIPMENT DESCRIPTIONS MODEL ITEM NAME MANUFACTURER OR TYPE EQUIPMENT _NO.
                                                                                                            .      .
SYSTEM FUNCTION 1
                                                                                                                %
Containnent Fan Westinghouse Frame 504US WlAl Containment Provide post-accident cooling Cooler Motor -
                                                                                                                    %
WlB1 150 hp WlC1 WlD1 2
                    ...,                          TABLE A                                   .
Valve Motor Reliance /
EQUIPMENT DESCRIPTIONS         .
SMB/0 M0V-852A&B Safety Injection Reactor Vessel Injection Operators Limitorque Isolation Peerless /
MODEL ITEM     NAME         MANUFACTURER OR TYPE           EQUIPMENT _NO. SYSTEM             FUNCTION 1 Containnent Fan   Westinghouse Frame 504US       WlAl           Containment     Provide post-accident Cooler Motor -                                   WlB1     -                      cooling 150 hp                                           WlC1 WlD1 2 Valve Motor       Reliance /   SMB/0             M0V-852A&B     Safety Injection Reactor Vessel Injection Operators         Limitorque                                                       Isolation Peerless /   SMB/00             M0V-8788&D                       Cold Leg Injection Limitorque                                                       Isolation Reliance /   SMB/2             MOV-841A&B                       Accumulator Isolation Limitorque                                                       (lockedopen) 3 Instrument       Foxboro     611GM-DSI         PT-429, -430,   Reactor         Pressurizer Pressure Transmitters                                     -431, -449     Protection       Transmitters 613HM-MAI         LT-426, -427,                   Pressurizer Level
SMB/00 M0V-8788&D Cold Leg Injection Limitorque Isolation Reliance /
                                                          -428, -461                       Transmitters
SMB/2 MOV-841A&B Accumulator Isolation Limitorque (lockedopen) 3 Instrument Foxboro 611GM-DSI PT-429, -430, Reactor Pressurizer Pressure Transmitters
                                                          -462, -463,                     Steam Generator
-431, -449 Protection Transmitters 613HM-MAI LT-426, -427, Pressurizer Level
                                                          -471, -472,                     Level Transmitters
-428, -461 Transmitters
                                                          -473 4 Solenoid Pilct   ASCO         8320A7             V-3213         Containment     Exhaust isolation Valves                                           V-3245         Purge           Supply isolation LBX831616         V-1296           Aux, charging   Isolation 8302C25F           V-3200C         Air sample       Isolation
-462, -463, Steam Generator
: 5. Stem Mounted     NAMCO       EA180             V-3213         Containment     Val.ve Position
-471, -472, Level Transmitters
-473 4
Solenoid Pilct ASCO 8320A7 V-3213 Containment Exhaust isolation Valves V-3245 Purge Supply isolation LBX831616 V-1296 Aux, charging Isolation 8302C25F V-3200C Air sample Isolation 5.
Stem Mounted NAMCO EA180 V-3213 Containment Val.ve Position Limit Switches V-3245 Isolation Indication
~
~
Limit Switches                                    V-3245          Isolation        Indication V-1296 cy,                                                       V-3200C CD 6 Level Indicator   Magnetrol   A-153             LC-942 A&B     Residual Heat   Containment Sump
V-1296 V-3200C cy, CD 6
---                                                        LC-943 A&B     Removal         Level Indication tu c7' 7   Power and Control Kerite       HT Kerite/         N.A.           Various         Maintain insulation Cable                         FR                                                 and conductor integrity.
Level Indicator Magnetrol A-153 LC-942 A&B Residual Heat Containment Sump LC-943 A&B Removal Level Indication tu c7' 7 Power and Control Kerite HT Kerite/
N.A.
Various Maintain insulation Cable FR and conductor integrity.
1 of ?
1 of ?


_        _ . .  .
TABLE A (Cont'd)
                                                                                                                  .-    .
MODEL ITEM NAfE MANUFACTURER OR TYPE EQUIPMENT NO.
_
SYSTEM FUNCTION 8
                                                                                                                          %
Instrument and Boston Insulated Silicone /
                                                                                                .
N.A.
                        ..,                          TABLE A (Cont'd)                             .
Various Maintain insulation Control Cable Wire Silicone and conductor integrity 9
MODEL ITEM           NAfE             MANUFACTURER     OR TYPE       EQUIPMENT NO. SYSTEM                   FUNCTION 8         Instrument and     Boston Insulated Silicone /     N.A.         Various             Maintain insulation Control Cable       Wire             Silicone                                         and conductor
Penetration Splices Raychem SFR N.A.
                                                                        .                        integrity 9         Penetration Splices Raychem         SFR           N.A.         Various             Provide electrical insulation and moisture seal for splices 10         Electrical         Westiaghouse     Welded,       El-E58       Containment         Maintain containment penetrations                         Cannister                                         pressure boundary 11         Residual Heat       Westinghouse     Frame         P10A, P10B   Residual Heat       Pump motor Removal Pump Motor,                 445TS                       Removal 200 hp 12         Safety Injection   Westinghouse     Frame         PISA, P15B   Safety Injection     Pump motor Pump Motor, 700 hp                   688.5H
Various Provide electrical insulation and moisture seal for splices 10 Electrical Westiaghouse
    -
: Welded, El-E58 Containment Maintain containment penetrations Cannister pressure boundary 11 Residual Heat Westinghouse Frame P10A, P10B Residual Heat Pump motor Removal Pump Motor, 445TS Removal 200 hp 12 Safety Injection Westinghouse Frame PISA, P15B Safety Injection Pump motor Pump Motor, 700 hp 688.5H tn c3
                                                                                                      . . . .
    -
tn c3
    . - _ .
(.a N
(.a N
Page 2 of 2}}
Page 2 of 2}}

Latest revision as of 08:26, 4 January 2025

Responds to Requesting Addl Info Re IE Bulletin 79-01, Environ Qualification of Class IE Equipment. Forwards Equipment Descriptions.Describes Insp Methods Used in Verifying Components & Mods to Transmitters
ML19253B821
Person / Time
Site: Point Beach  
Issue date: 10/09/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7910220282
Download: ML19253B821 (4)


Text

Tll 1

Wisconsin Electnc rom cower 231 W. MICHIGAN, P.O. BOX 2046. MitWAUKEE, WI 53201 October 9, 1979 Mr. J. G. Keppler, Director Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. R. F. Heishman Gentlemen:

DOCKET NOS. 50-266 AND 50-301 IE BULLETIN 79-01 ADDITIONAL INFORMATION POINT BEACH NUCLEAR PLANT

~

This is in response to your letter of September 25, 1979, requesting additional information in response to IE Bulletin 79-01 The additional infor-mation is as follows:

1.

The equipment descriptions are included in the attached Table A.

2 Several methcds were used to verify that the components included in our equipment description are, in fact, installed and are the same as those for which qualifi-cation documentation exists. These methods include a combination of direct observation by plant personnel, review of maintenance records, and review of original purchase docurants.

3.

The limit switches identified as Item 5 in our response to Bulletin 79-01 provide valve position indication in the control room for the air operated containment isola-tion valves located inside containment. These switches are environmentall:- qualified as described in our response to Bulletin 79-01 4

The modifications to the Foxboro transmitters were:

a) Liberal use of RTV sealant in the conduit connections; 1150 34 1

b) Breather assembly replaced with a blow-out disc; 7 910220 EN DCT 111979

Mr. J. G. Keppler, Director October 9,1979 4.

c) Viton 0-rings for cover and zero adjustment; and d) Teflon lead wires.

AslistedinourresponsetoBulletin79-01,themodifiedi transmitters will perform their intended safety function -

under the specific LOCA conditions to which they would be exposed. Chemical spray is not applicable since the intended function of the transmitters would be completed prior to chemical spray initiation.

5.

Ancillary components and parts were qualified with, and as part of, the equipment listed in our response to Bulletin 79-01.

In all cases where safety-related equipment is involved, maintenance or replacement parts are replaced with like parts. Substitution is not allowed. Should a part be no longer available, a substitute will be used only when it has been determined that the substitute part has been qualified and is equal to or better than the original part for the intended service.

While we do not have much difficulty in providing this requested information in this case, we believe that the seven-day response time you requested is inappropriate.

It appears arbitrary and unreasonable to require a seven-day response when the original Bulletin allowed 120 days for our review and our response to that Bulletin has been in your hands for over three months.

The numerous bulletins from your office and additional requests for infonnati.on and action from NRR are placing unprecedented burdens on licensees, resulting in diversion of strategic personnel. We are sure you are aware that we are trying to make full and complete responses to these many inquiries in a timely manner without jeopardizing the safety of our nuclear plant operations.

Your understanding and cooperation in this regard is appreciated.

Very truly yours, C. W. Fay, Director Nuclear Power Department Attachments i

L 1150 i35

1 TABLE A EQUIPMENT DESCRIPTIONS MODEL ITEM NAME MANUFACTURER OR TYPE EQUIPMENT _NO.

SYSTEM FUNCTION 1

Containnent Fan Westinghouse Frame 504US WlAl Containment Provide post-accident cooling Cooler Motor -

WlB1 150 hp WlC1 WlD1 2

Valve Motor Reliance /

SMB/0 M0V-852A&B Safety Injection Reactor Vessel Injection Operators Limitorque Isolation Peerless /

SMB/00 M0V-8788&D Cold Leg Injection Limitorque Isolation Reliance /

SMB/2 MOV-841A&B Accumulator Isolation Limitorque (lockedopen) 3 Instrument Foxboro 611GM-DSI PT-429, -430, Reactor Pressurizer Pressure Transmitters

-431, -449 Protection Transmitters 613HM-MAI LT-426, -427, Pressurizer Level

-428, -461 Transmitters

-462, -463, Steam Generator

-471, -472, Level Transmitters

-473 4

Solenoid Pilct ASCO 8320A7 V-3213 Containment Exhaust isolation Valves V-3245 Purge Supply isolation LBX831616 V-1296 Aux, charging Isolation 8302C25F V-3200C Air sample Isolation 5.

Stem Mounted NAMCO EA180 V-3213 Containment Val.ve Position Limit Switches V-3245 Isolation Indication

~

V-1296 V-3200C cy, CD 6

Level Indicator Magnetrol A-153 LC-942 A&B Residual Heat Containment Sump LC-943 A&B Removal Level Indication tu c7' 7 Power and Control Kerite HT Kerite/

N.A.

Various Maintain insulation Cable FR and conductor integrity.

1 of ?

TABLE A (Cont'd)

MODEL ITEM NAfE MANUFACTURER OR TYPE EQUIPMENT NO.

SYSTEM FUNCTION 8

Instrument and Boston Insulated Silicone /

N.A.

Various Maintain insulation Control Cable Wire Silicone and conductor integrity 9

Penetration Splices Raychem SFR N.A.

Various Provide electrical insulation and moisture seal for splices 10 Electrical Westiaghouse

Welded, El-E58 Containment Maintain containment penetrations Cannister pressure boundary 11 Residual Heat Westinghouse Frame P10A, P10B Residual Heat Pump motor Removal Pump Motor, 445TS Removal 200 hp 12 Safety Injection Westinghouse Frame PISA, P15B Safety Injection Pump motor Pump Motor, 700 hp 688.5H tn c3

(.a N

Page 2 of 2