ML19208D392: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19208D395 | | number = ML19208D395 | ||
| issue date = 09/19/1979 | | issue date = 09/19/1979 | ||
| title = | | title = LER 79-095/03L-0:on 790912,hydrogen Gas Concentration Increased Greater than Tech Spec Limit of 4% for 18 Minutes. Caused by Moisture Entering Recombiner | ||
| author name = Baxley S | | author name = Baxley S | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 07:09, 24 January 2020
Date released: 08/10/2019 | Download: ML19208D392 |
---|---|
ML19208D395 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 09/19/1979 |
From: | Baxley S GEORGIA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19208D395 (1) | |
ML19208D391 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 09/19/1979 |
From: | Manry M GEORGIA POWER CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19208D391 (1) | |