ML19209A512: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,-.ARKANSAS POWER & LIGHT COMPANY POST CFFICE BOX 551 UTTLE ROCK ARKANSAS 72203 (501) 371-.*.000
{{#Wiki_filter:,-
.September 25, 1979 1-099-15 Mr. K.V. Seyfrit, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
ARKANSAS POWER & LIGHT COMPANY POST CFFICE BOX 551 UTTLE ROCK ARKANSAS 72203 (501) 371-.*.000 September 25, 1979 1-099-15 Mr. K.V. Seyfrit, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011


==Subject:==
==Subject:==
Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File: 0520.2)Gentlemen:
Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File:
0520.2)
Gentlemen:
Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1)
Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1)
Technical Specification 6.12.2.1, attached is the subject report.
Technical Specification 6.12.2.1, attached is the subject report.
Very truly yours, f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc: Mr. Ncrman M. Haller, Director
Very truly yours,
@q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\Washington, D.C.
: f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc:
20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3()ljj 7 910 040 A 7/
Mr. Ncrman M. Haller, Director
veveemeets scur- urur:es svsrau}}
@q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\\
Washington, D.C.
20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3()
ljj 7 910 040 A 7/
veveemeets scur-urur:es svsrau}}

Latest revision as of 23:05, 4 January 2025

Forwards Cycle 4 Startup Rept for Period Ending 790704
ML19209A512
Person / Time
Site: Arkansas Nuclear 
Issue date: 09/25/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19209A513 List:
References
1-099-15, 1-99-15, NUDOCS 7910040271
Download: ML19209A512 (1)


Text

,-

ARKANSAS POWER & LIGHT COMPANY POST CFFICE BOX 551 UTTLE ROCK ARKANSAS 72203 (501) 371-.*.000 September 25, 1979 1-099-15 Mr. K.V. Seyfrit, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Subject:

Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File:

0520.2)

Gentlemen:

Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1)

Technical Specification 6.12.2.1, attached is the subject report.

Very truly yours,

f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc:

Mr. Ncrman M. Haller, Director

@q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\\

Washington, D.C.

20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3()

ljj 7 910 040 A 7/

veveemeets scur-urur:es svsrau