ML19209A512: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:,- | {{#Wiki_filter:,- | ||
ARKANSAS POWER & LIGHT COMPANY POST CFFICE BOX 551 UTTLE ROCK ARKANSAS 72203 (501) 371-.*.000 September 25, 1979 1-099-15 Mr. K.V. Seyfrit, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 | |||
==Subject:== | ==Subject:== | ||
Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File: 0520.2)Gentlemen: | Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File: | ||
0520.2) | |||
Gentlemen: | |||
Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1) | Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1) | ||
Technical Specification 6.12.2.1, attached is the subject report. | Technical Specification 6.12.2.1, attached is the subject report. | ||
Very truly yours, f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc: Mr. Ncrman M. Haller, Director | Very truly yours, | ||
@q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\Washington, D.C. | : f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc: | ||
20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3()ljj 7 910 040 A 7/ | Mr. Ncrman M. Haller, Director | ||
veveemeets scur- urur:es svsrau}} | @q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\\ | ||
Washington, D.C. | |||
20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3() | |||
ljj 7 910 040 A 7/ | |||
veveemeets scur-urur:es svsrau}} | |||
Latest revision as of 23:05, 4 January 2025
| ML19209A512 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/25/1979 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19209A513 | List: |
| References | |
| 1-099-15, 1-99-15, NUDOCS 7910040271 | |
| Download: ML19209A512 (1) | |
Text
,-
ARKANSAS POWER & LIGHT COMPANY POST CFFICE BOX 551 UTTLE ROCK ARKANSAS 72203 (501) 371-.*.000 September 25, 1979 1-099-15 Mr. K.V. Seyfrit, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Subject:
Arkansas Nuclear One-Unit 1 Docket No. 50-315 License No. DPR-51 Startup Report - Cycle 4 (File:
0520.2)
Gentlemen:
Pursuant to the requirements of Arkansas Nuclear One-Unit 1 (ANO-1)
Technical Specification 6.12.2.1, attached is the subject report.
Very truly yours,
- f. f David C. Trimble Manager, Licensing DCT: ERG:gp cc:
Mr. Ncrman M. Haller, Director
@q Office of Management 5 Program Analysis U. S. Nuclear Regulatory Commission g\\
Washington, D.C.
20555 Mr. R. N. Reid, Chief Operating Reactor Branch #4 U. S. Nuclear Regulatory Commission Nashington, D.C. 20555 ll)3()
ljj 7 910 040 A 7/
veveemeets scur-urur:es svsrau