{{#Wiki_filter:May 16, | {{#Wiki_filter:May 16, 2005 Mr. Stephen D. Floyd Vice President of Regulatory Affairs Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 | ||
==Dear Mr. Floyd:== | ==Dear Mr. Floyd:== | ||
This response to your letter dated March 2, 2005, takes into consideration the correspondence,dated November 30, 2004, and March 3, 2005, between Adrian Heymer, of the Nuclear | This response to your letter dated March 2, 2005, takes into consideration the correspondence, dated November 30, 2004, and March 3, 2005, between Adrian Heymer, of the Nuclear Energy Institute (NEI), and Richard J. Barrett, of the U.S. Nuclear Regulatory Commission (NRC). In your letter, you correctly asserted that the NRC has identified two seismic issues in its review of the first three early site permit applications. Specifically, these issues are (1) the significance of high-amplitude, high-frequency ground motion, and (2) the determination of the safe shutdown earthquake ground motion (SSE) using the methodologies described in Regulatory Guide (RG) 1.165. The management and staff of the NRC recognize the importance of resolving these seismic issues. | ||
The Electric Power Research Institute (EPRI) made an extensive effort to resolve this issue, as documented in the 1993 EPRI Topical Report, entitled | I agree that the issues are right for consideration, and you correctly ordered the issues in your letter of March 2, 2005. High-frequency ground motion has been a long-term, recurring issue. | ||
S. Floyd | The Electric Power Research Institute (EPRI) made an extensive effort to resolve this issue, as documented in the 1993 EPRI Topical Report, entitled Analysis of High-Frequency Seismic Effects (EPRI TR-102470). EPRI submitted that report for NRC review and acceptance, but little progress has been made following the NRCs request for additional information. | ||
The Office of Nuclear Regulatory Research (RES) staff is already engaged in an effort to resolve these seismic issues associated with RG 1.165 and to investigate the performance-based approach mentioned in your letter for possible incorporation into the revised regulatory guide. At this time, preliminary review has identified substantive issues that require further assessment from the NRC staff. The NRC has formed a Seismic Issues Technical Advisory Group (SITAG) to provide a focused effort toward resolution of the revelant seismic issues and make recommendations to NRC management. The NRC contact is Dr. Andrew J. Murphy, Chairman of the NRCs Seismic Issues Technical Advisory Group, at (301) 415-6011 or by email to AJM1@nrc.gov. The NRC staff is prepared to interact with industry representatives, through NEI, to develop a common understanding of the issues that concern the industry such that their resolution is addressed in the revision of the regulatory guide. | |||
E | S. Floyd The provisional schedule of meetings attached in your letter is an appropriate starting point. | ||
N | Toward that end, my staff had been in contact with Cedric Jobe of NEI to arrange a first meeting in April to discuss a process for cooperating on the resolution of the seismic issues related to early site permit applications. I understand that the first meeting was postponed to May 25, 2005, because the industry experts would not be ready until that time. We look forward to interacting with representatives from NEI and the industry toward a common understanding of the issue and to develop a resolution to support the NP2010 initiative. | ||
Sincerely, | |||
/RA/ | |||
Carl J. Paperiello, Director Office of Nuclear Regulatory Research | |||
S. Floyd The provisional schedule of meetings attached in your letter is an appropriate starting point. | |||
Toward that end, my staff had been in contact with Cedric Jobe of NEI to arrange a first meeting in April to discuss a process for cooperating on the resolution of the seismic issues related to early site permit applications. I understand that the first meeting was postponed to May 25, 2005, because the industry experts would not be ready until that time. We look forward to interacting with representatives from NEI and the industry toward a common understanding of the issue and to develop a resolution to support the NP2010 initiative. | |||
Sincerely, | |||
/RA/ | |||
Carl J. Paperiello, Director Office of Nuclear Regulatory Research DISTRIBUTION: DET r/f ERAB r/f R. Barrett M. Cunningham M. Evans A. Hsia A. Murphy M. Mayfield K. Manoly E. Imbro T. Clark (RES2005076) | |||
DOCUMENT NAME: E:\Filenet\ML051010072.wpd | |||
*See Previous Concurrence OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO: ML051010072 TEMPLATE NO. RES-006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC: 5/17/05 SENSITIVE? N To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy OFFICE RES/DET/ERAB RES/DET/ERAB RES/DET/ERAB RES/DET NAME AMurphy /RA/ AHsia /RA/ MEvans /RA/ RBarrett /RA/ | |||
DATE 5/13/05 5/13/05 5/13/05 5/13/05 OFFICE *Tech Editor N *NRR RES NAME PGarrity MMayfield /RA/ CPaperiello /RA/ | |||
DATE 3/25/05 4/8/05 & 5/13/05 5/16/05 OFFICIAL RECORD COPY OFFICE SISP Review SISP Review NAME AMurphy /MGE for/ MEvans /RA/ | |||
DATE 4/8/05 4/8 /05}} |
Latest revision as of 00:30, 24 November 2019
ML051010072 | |
Person / Time | |
---|---|
Issue date: | 05/16/2005 |
From: | Paperiello C Office of Nuclear Regulatory Research |
To: | Floyd S Nuclear Energy Institute |
References | |
FOIA/PA-2009-0035, RG-1.165 | |
Download: ML051010072 (3) | |
Text
May 16, 2005 Mr. Stephen D. Floyd Vice President of Regulatory Affairs Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
Dear Mr. Floyd:
This response to your letter dated March 2, 2005, takes into consideration the correspondence, dated November 30, 2004, and March 3, 2005, between Adrian Heymer, of the Nuclear Energy Institute (NEI), and Richard J. Barrett, of the U.S. Nuclear Regulatory Commission (NRC). In your letter, you correctly asserted that the NRC has identified two seismic issues in its review of the first three early site permit applications. Specifically, these issues are (1) the significance of high-amplitude, high-frequency ground motion, and (2) the determination of the safe shutdown earthquake ground motion (SSE) using the methodologies described in Regulatory Guide (RG) 1.165. The management and staff of the NRC recognize the importance of resolving these seismic issues.
I agree that the issues are right for consideration, and you correctly ordered the issues in your letter of March 2, 2005. High-frequency ground motion has been a long-term, recurring issue.
The Electric Power Research Institute (EPRI) made an extensive effort to resolve this issue, as documented in the 1993 EPRI Topical Report, entitled Analysis of High-Frequency Seismic Effects (EPRI TR-102470). EPRI submitted that report for NRC review and acceptance, but little progress has been made following the NRCs request for additional information.
The Office of Nuclear Regulatory Research (RES) staff is already engaged in an effort to resolve these seismic issues associated with RG 1.165 and to investigate the performance-based approach mentioned in your letter for possible incorporation into the revised regulatory guide. At this time, preliminary review has identified substantive issues that require further assessment from the NRC staff. The NRC has formed a Seismic Issues Technical Advisory Group (SITAG) to provide a focused effort toward resolution of the revelant seismic issues and make recommendations to NRC management. The NRC contact is Dr. Andrew J. Murphy, Chairman of the NRCs Seismic Issues Technical Advisory Group, at (301) 415-6011 or by email to AJM1@nrc.gov. The NRC staff is prepared to interact with industry representatives, through NEI, to develop a common understanding of the issues that concern the industry such that their resolution is addressed in the revision of the regulatory guide.
S. Floyd The provisional schedule of meetings attached in your letter is an appropriate starting point.
Toward that end, my staff had been in contact with Cedric Jobe of NEI to arrange a first meeting in April to discuss a process for cooperating on the resolution of the seismic issues related to early site permit applications. I understand that the first meeting was postponed to May 25, 2005, because the industry experts would not be ready until that time. We look forward to interacting with representatives from NEI and the industry toward a common understanding of the issue and to develop a resolution to support the NP2010 initiative.
Sincerely,
/RA/
Carl J. Paperiello, Director Office of Nuclear Regulatory Research
S. Floyd The provisional schedule of meetings attached in your letter is an appropriate starting point.
Toward that end, my staff had been in contact with Cedric Jobe of NEI to arrange a first meeting in April to discuss a process for cooperating on the resolution of the seismic issues related to early site permit applications. I understand that the first meeting was postponed to May 25, 2005, because the industry experts would not be ready until that time. We look forward to interacting with representatives from NEI and the industry toward a common understanding of the issue and to develop a resolution to support the NP2010 initiative.
Sincerely,
/RA/
Carl J. Paperiello, Director Office of Nuclear Regulatory Research DISTRIBUTION: DET r/f ERAB r/f R. Barrett M. Cunningham M. Evans A. Hsia A. Murphy M. Mayfield K. Manoly E. Imbro T. Clark (RES2005076)
DOCUMENT NAME: E:\Filenet\ML051010072.wpd
- See Previous Concurrence OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO: ML051010072 TEMPLATE NO. RES-006 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC: 5/17/05 SENSITIVE? N To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy OFFICE RES/DET/ERAB RES/DET/ERAB RES/DET/ERAB RES/DET NAME AMurphy /RA/ AHsia /RA/ MEvans /RA/ RBarrett /RA/
DATE 5/13/05 5/13/05 5/13/05 5/13/05 OFFICE *Tech Editor N *NRR RES NAME PGarrity MMayfield /RA/ CPaperiello /RA/
DATE 3/25/05 4/8/05 & 5/13/05 5/16/05 OFFICIAL RECORD COPY OFFICE SISP Review SISP Review NAME AMurphy /MGE for/ MEvans /RA/
DATE 4/8/05 4/8 /05