ML052730152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML052730152
| number = ML052730152
| issue date = 10/03/2005
| issue date = 10/03/2005
| title = 09/21/2005: Summary of Meeting with the Nuclear Energy Institute, Electric Power Research Institute and Industry Representatives on Risk Management Technical Specifications Guidelines for Initiative 4b
| title = Summary of Meeting with the Nuclear Energy Institute, Electric Power Research Institute and Industry Representatives on Risk Management Technical Specifications Guidelines for Initiative 4b
| author name = Tjader T
| author name = Tjader T
| author affiliation = NRC/NRR/DIPM/IROB
| author affiliation = NRC/NRR/DIPM/IROB
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:October 3, 2005 Mr. Biff Bradley Nuclear Energy Institute
{{#Wiki_filter:October 3, 2005 Mr. Biff Bradley Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
 
Suite 400 1776 I Street, NW
 
Washington, DC 20006-3708


==SUBJECT:==
==SUBJECT:==
SEPTEMBER 21, 2005:
SEPTEMBER 21, 2005:  


==SUMMARY==
==SUMMARY==
OF MEETING WITH THE NUCLEAR ENERGY INSTITUTE, ELECTRIC POWER RESEARCH INSTITUTE AND
OF MEETING WITH THE NUCLEAR ENERGY INSTITUTE, ELECTRIC POWER RESEARCH INSTITUTE AND INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b
 
INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL
 
SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b


==Dear Mr. Bradley:==
==Dear Mr. Bradley:==


The purpose of this letter is to transmit the summary of a meeting with the Industry representatives on Risk Management Technical Specifications Guidelines. The meeting was
The purpose of this letter is to transmit the summary of a meeting with the Industry representatives on Risk Management Technical Specifications Guidelines. The meeting was held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on September 21, 2005.
 
Sincerely,
held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on  
                                                /RA/
 
T. R. Tjader, Senior Reactor Engineer Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
September 21, 2005.
Sincerely,/RA/T. R. Tjader, Senior Reactor Engineer Technical Specifications Section
 
Reactor Operations Branch
 
Division of Inspection Program Management
 
Office of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
Line 53: Line 37:
: 4. Risk Management Guidelines (RMG) Requests for Additional Information (RAIs)
: 4. Risk Management Guidelines (RMG) Requests for Additional Information (RAIs)
: 5. RMG Comments
: 5. RMG Comments
: 6. RMTS Guidelines cc w/encl: See attached page  
: 6. RMTS Guidelines cc w/encl: See attached page
 
PACKAGE: ML052730142, LETTER, ML052730152, ENCLOSURE 4: ML052730161, ENCLOSURE 5: ML052730165, ENCLOSURE 5: ML052730170OFFICETSS:IROB-A:DIPMSC:TSS:IROB-A:DIPM NAMETRTjaderTHBoyce DATE10/03/200510/03/2005


cc via e-mail
PACKAGE: ML052730142, LETTER, ML052730152, ENCLOSURE 4: ML052730161, ENCLOSURE 5: ML052730165, ENCLOSURE 5: ML052730170 OFFICE TSS:IROB-A:DIPM                SC:TSS:IROB-A:DIPM NAME TRTjader                        THBoyce DATE      10/03/2005                10/03/2005 cc via e-mail:
: Mr. Tony Pietrangelo
Mr. Tony Pietrangelo               General Electric Nuclear Energy Nuclear Energy Institute Mr. Michael S. Kitlan, Jr.
 
Mr. Biff Bradley                  Duke Energy Corporation Nuclear Energy Institute Mr. Noel Clarkson Mr. Mike Schoppman                Duke Energy Corporation Nuclear Energy Institute Mr. Donald Hoffman Mr. Alan Hackerott, Chairman      EXCEL Services Corporation Omaha Public Power District Mr. Ted Book Mr. Jim Kenny                      Framatech-ANP Pennsylvania Power & Light Company Mr. R. J. Schomaker Mr. James Andrachek                Framatech-ANP Westinghouse Electric Company Mr. J. E. Rhoads Mr. Jack Stringfellow              Energy Northwest Southern Nuclear Operating Company Ms. Deann Raleigh Mr. Ray Schneider                  Scientech Westinghouse Mr. Ken Canavan Mr. John Gaertner                  DS&S EPRI Mr. Steven Dolly Mr. Frank Rahn                    Platts EPRI Mr. Gabe Salamon Mr. Wayne Harrison                PSEG Nuclear STP Mr. Courtney Smyth Mr. Drew Richards                  PSEG Nuclear LLC STP Mr. Jerry Andre Mr. Rick Grantom                  Westinghouse Electric Company STP Mr. David Helher Mr. Gary Chung                    Exelon SCE-SONGS Mr. Eugene Kelly Mr. Glenn Stewart                  Exelon Exelon Mr. James Liming Mr. Phil Tarpinian                ABSG Exelon Mr. Stanley Levinson Ms. Nancy Chapman                  Framatone ANP SERCH/Bechtel Mr. Rick Hill
Nuclear Energy Institute Mr. Biff Bradley Nuclear Energy Institute Mr. Mike Schoppman Nuclear Energy Institute Mr. Alan Hackerott, Chairman Omaha Public Power District Mr. Jim Kenny Pennsylvania Power & Light Company Mr. James Andrachek Westinghouse Electric CompanyMr. Jack Stringfellow Southern Nuclear Operating Company Mr. Ray Schneider Westinghouse Mr. John Gaertner EPRI Mr. Frank Rahn EPRI Mr. Wayne Harrison STP Mr. Drew Richards STP Mr. Rick Grantom STP Mr. Gary Chung SCE-SONGS Mr. Glenn Stewart Exelon Mr. Phil Tarpinian Exelon Ms. Nancy Chapman SERCH/BechtelMr. Rick Hill General Electric Nuclear Energy Mr. Michael S. Kitlan, Jr.
Duke Energy Corporation Mr. Noel Clarkson Duke Energy Corporation Mr. Donald HoffmanEXCEL Services Corporation Mr. Ted Book Framatech-ANP Mr. R. J. Schomaker Framatech-ANP Mr. J. E. Rhoads Energy Northwest Ms. Deann Raleigh Scientech Mr. Ken Canavan DS&S Mr. Steven Dolly Platts Mr. Gabe Salamon PSEG Nuclear Mr. Courtney Smyth PSEG Nuclear LLC Mr. Jerry Andre Westinghouse Electric Company Mr. David Helher Exelon Mr. Eugene Kelly ExelonMr. James Liming ABSG Mr. Stanley Levinson Framatone ANP  


==SUMMARY==
==SUMMARY==
OF THE SEPTEMBER 21, 2005 MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI), ELECTRIC POWER RESEARCH INSTITUTE (EPRI) AND INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b The NRC staff met with Industry representatives on September 21, 2005, from 9:00 a.m. to 12:30 p.m. The meeting attendees are listed in Enclosure 2.
OF THE SEPTEMBER 21, 2005 MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI), ELECTRIC POWER RESEARCH INSTITUTE (EPRI) AND INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b The NRC staff met with Industry representatives on September 21, 2005, from 9:00 a.m. to 12:30 p.m. The meeting attendees are listed in Enclosure 2.
The agenda (Enclosure 3) consisted of major discussion topics/requests for additional information (RAIs) (Enclosure 4) and related comments (Enclosure 5) to the latest version of
The agenda (Enclosure 3) consisted of major discussion topics/requests for additional information (RAIs) (Enclosure 4) and related comments (Enclosure 5) to the latest version of the Industrys proposed Risk Management Technical Specifications (RMTS) Guidelines (Enclosure 6) for RMTS Initiative 4b, Risk-Informed Completion Times.
 
Major topics of discussion and areas needing enhancement in the RMTS Guidance (RMG) document are:
the Industry's proposed Risk Management Technical Specifications (RMTS) Guidelines (Enclosure 6) for RMTS Initiative 4b, Risk-Informed Completion Times.
     - The RMG should be restructured to provide requirements that can be invoked by the Administrative Controls Section of the technical specifications (TS). To the extent possible the RMG should be procedure like and utilize imperative directives such as shall. Reducing redundancy, maintaining consistency and simplifying the RMG should be a goal in restructuring. It is not deemed necessary to make the RMG document a Regulatory Guide since it will be referenced explicitly in the TS.
Major topics of discussion and areas needing enhancement in the RMTS Guidance (RMG) document are:    -The RMG should be restructured to provide requirements that can be invoked by the Administrative Controls Section of the technical specifications (TS). To the extent
     - It should be clear that the cause of an ICDP increase above 10 -6 and an approach to the limit of 10-5 is due to emergent conditions and not a routine planned increase. Guidance is needed on the accumulation of risk, to avoid exceeding the 10 -5 limit. Guidance should be included on the periodic evaluation of the accumulation of risk, and the consideration of actions to improve the implementation of RICTs. A member of the staff proposed that a possible means controlling aggregate risk would be to add a goal to the Administrative Controls Section of the TS to keep the accumulation of risk as low as reasonably achievable.
 
    - The discussion of Common Cause Failure (CCF) needs to be enhanced by including specific actions, considerations and examples.
possible the RMG should be procedure like and utilize imperative directives such as
     - The discussion of TS Operability versus PRA functionality needs to be enhanced by including specific considerations and examples.
 
     - A thorough discussion is needed of the application of a RICT, with examples provided of various scenarios; how the actions associated with a RICT are entered and exited.
"shall.Reducing redundancy, maintaining consistency and simplifying the RMG should
    - It must be clear that every use of a RICT requires documentation of the associated risk assessment.
 
     - The RMG should thoroughly discuss the use of qualitative and bounding assessments; e.g., how risk concerns can be qualitatively ruled out, and how quantitatively risk concerns can be bounded.
be a goal in restructuring. It is not deemed necessary to make the RMG document a
Enclosure 1
 
  -   Consideration of applying a Safety Function Determination Program test, such as that provided in the Standard TS, to LCO 3.0.3 entries to determine if it is acceptable to utilize a RICT; it is not acceptable to use a RICT for an LCO 3.0.3 entry required by a bonafide loss-of-funtion. It is recognized that RICTs can be used with the actions to restore equipment to Operable status that have been created through RMTS Initiative 6.
Regulatory Guide since it will be referenced explicitly in the TS.    -It should be clear that the cause of an ICDP increase above 10 -6 and an approach to the limit of 10
  -    The processes described in the STP and CE pilot plant proposals must be consistent with the RMG.
-5 is due to emergent conditions and not a routine planned increase. Guidance is needed on the accumulation of risk, to avoid exceeding the 10 -5 limit. Guidance should be included on the periodic evaluation of the accumulation of risk, and the
The intent is to meet again soon after a revised RMG document is developed and provided for review.
 
consideration of actions to improve the implementation of RICTs. A member of the staff
 
proposed that a possible means controlling aggregate risk would be to add a goal to the
 
Administrative Controls Section of the TS to keep the accumulation of risk as low as
 
reasonably achievable.     -The discussion of Common Cause Failure (CCF) needs to be enhanced by including specific actions, considerations and examples.    -The discussion of TS Operability versus PRA functionality needs to be enhanced by including specific considerations and examples.    -A thorough discussion is needed of the application of a RICT, with examples provided of various scenarios; how the actions associated with a RICT are entered and exited.     -It must be clear that every use of a RICT requires documentation of the associated riskassessment.    -The RMG should thoroughly discuss the use of qualitative and bounding assessments; e.g., how risk concerns can be qualitatively ruled out, and how quantitatively risk
 
concerns can be bounded.
    -Consideration of applying a Safety Function Determination Program test, such as that provided in the Standard TS, to LCO 3.0.3 entries to determine if it is acceptable to


utilize a RICT; it is not acceptable to use a RICT for an LCO 3.0.3 entry required by a
NRC/INDUSTRY MEETING ON THE RISK MANAGEMENT GUIDELINES FOR RMTS INITIATIVE 4b ATTENDANCE LIST SEPTEMBER 21, 2005 NAME                    AFFILIATION BIFF BRADLEY            NUCLEAR ENERGY INSTITUTE JOHN GAERTNER            EPRI RICK GRANTOM            STP NOC WAYNE HARRISON          STP NOC BILL STILLWELL          STP NOC DREW RICHARDS            STP NOC ALAN HACKEROTT          OPPD RAY SCHNEIDER            WESTINGHOUSE PSA JAMES LIMING            ABSG PAT HILAND              NRC/NRR/DIPM/IROB TOM BOYCE                NRC/NRR/DIPM/IROB/TSS BOB TJADER              NRC/NRR/DIPM/IROB/TSS DAVID ROTH              NRC/NRR/DIPM/IROB/TSS SARA BERNAL              NRC/NRR/DIPM/IROB/TSS MARK REINHART            NRC/NRR/DSSA/SPSB ANDREW HOWE              NRC/NRR/DSSA/SPSB JIM VAIL                NRC/NRR/DSSA/SPSB NANCY SALGADO            NRC/NRR/DSSA/SPSB DAVID SHUM            NRC/NRR/DSSA/SPLB STEPHEN ALEXANDER        NRC/NRR/DIPM/IPSB HUKAM GARG              NRC/NRR/DE/EEIB MIKE SNODDERLY          NRC/ACRS Enclosure 2


bonafide loss-of-funtion. It is recognized that RICTs can be used with the actions to
AGENDA RISK MANAGEMENT TECHNICAL SPECIFICATIONS INITIATIVE 4b, RISK-INFORMED COMPLETION TIMES RISK MANAGEMENT GUIDANCE DOCUMENT C Risk Management Guidance (RMG) Document Comment Overview B Improving: content largely there, needs change in emphasis to support Tech Specs B Re-structure to support Tech Spec Requirements (e.g., procedure-like)
 
              - State shall requirements, followed by implementation guidance B Larger Scope Deficiencies
restore equipment to Operable status that have been created through RMTS Initiative 6.    -The processes described in the STP and CE pilot plant proposals must be consistent with the RMG.
              - RICT Threshold of 10-5 ICDP seems high (see RAI comments 43, 13)
The intent is to meet again soon after a revised RMG document is developed and provided for review.
Implications for control of aggregate risk (e.g., ALARA concept)
NRC/INDUSTRY MEETING ON THE RISK MANAGEMENT GUIDELINES FOR RMTS INITIATIVE 4b ATTENDANCE LIST SEPTEMBER 21, 2005 NAME AFFILIATIONBIFF BRADLEYNUCLEAR ENERGY INSTITUTEJOHN GAERTNEREPRI RICK GRANTOMSTP NOC WAYNE HARRISONSTP NOC BILL STILLWELLSTP NOC DREW RICHARDSSTP NOC ALAN HACKEROTTOPPD RAY SCHNEIDERWESTINGHOUSE PSA JAMES LIMINGABSG PAT HILANDNRC/NRR/DIPM/IROB TOM BOYCENRC/NRR/DIPM/IROB/TSS BOB TJADERNRC/NRR/DIPM/IROB/TSS DAVID ROTHNRC/NRR/DIPM/IROB/TSS SARA BERNALNRC/NRR/DIPM/IROB/TSS MARK REINHARTNRC/NRR/DSSA/SPSB ANDREW HOWENRC/NRR/DSSA/SPSB JIM VAILNRC/NRR/DSSA/SPSB NANCY SALGADONRC/NRR/DSSA/SPSB DAVID SHUM NRC/NRR/DSSA/SPLB STEPHEN ALEXANDERNRC/NRR/DIPM/IPSB HUKAM GARGNRC/NRR/DE/EEIB MIKE SNODDERLYNRC/ACRS AGENDA RISK MANAGEMENT TECHNICAL SPECIFICATIONS INITIATIVE 4b, RISK-INFORMED COMPLETION TIMES RISK MANAGEMENT GUIDANCE DOCUMENT Risk Management Guidance (RMG) Document Comment Overview Improving: content largely there, needs change in emphasis to support Tech Specs Re-structure to support Tech Spec Requirements (e.g., procedure-like)- State "shall" requirements, followed by implementation guidance Larger Scope Deficiencies- RICT Threshold of 10
              - Tech Spec Operability vs PRA Functionality, (see RAI comment 19) needs to be addressed more fully in Guidance
-5 ICDP seems high (see RAI comments 43, 13)
              - CCF needs to be addressed more fully in Guidance (see RAI comment 1)
Implications for control of aggregate risk (e.g., ALARA concept)- Tech Spec Operability vs PRA Functionality, (see RAI comment 19) needs to be addressed more fully in Guidance- CCF needs to be addressed more fully in Guidance (see RAI comment 1)
              - Use of Qualitative and Bounding Assessments, used to support RICTs, needs to be addressed more fully in Guidance (see RAI comment 20)
- Use of Qualitative and Bounding Assessments, used to support RICTs, needs to be addressed more fully in Guidance (see RAI comment 20)- Simplify RMG, (see RAI comment 42) Detailed Deficiencies (see other RAI comments); a few are mentioned below:- Correct Flow Chart
              - Simplify RMG, (see RAI comment 42)
- Every use of a RICT requires documentation
B Detailed Deficiencies (see other RAI comments); a few are mentioned below:
- Correct means of calculating RICT (see RAI comment 46)
              - Correct Flow Chart
- Address PRA/CRMP maintenance/updates (see RAI comment 47)
              - Every use of a RICT requires documentation
- Consistency needed: for example, RICT & TS 3.0.3 applications, uncertainty Pilots shall be consistent with RMG Schedule/Process Closing Comments }}
              - Correct means of calculating RICT (see RAI comment 46)
              - Address PRA/CRMP maintenance/updates (see RAI comment 47)
              - Consistency needed: for example, RICT & TS 3.0.3 applications, uncertainty C Pilots shall be consistent with RMG C Schedule/Process C Closing Comments Enclosure 3}}

Latest revision as of 14:48, 14 March 2020

Summary of Meeting with the Nuclear Energy Institute, Electric Power Research Institute and Industry Representatives on Risk Management Technical Specifications Guidelines for Initiative 4b
ML052730152
Person / Time
Issue date: 10/03/2005
From: Tjader T
NRC/NRR/DIPM/IROB
To: Bradley B
Nuclear Energy Institute
Tjader T., NRC/IROB, 415-1187
Shared Package
ML052730142 List:
References
Download: ML052730152 (7)


Text

October 3, 2005 Mr. Biff Bradley Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

SEPTEMBER 21, 2005:

SUMMARY

OF MEETING WITH THE NUCLEAR ENERGY INSTITUTE, ELECTRIC POWER RESEARCH INSTITUTE AND INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b

Dear Mr. Bradley:

The purpose of this letter is to transmit the summary of a meeting with the Industry representatives on Risk Management Technical Specifications Guidelines. The meeting was held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on September 21, 2005.

Sincerely,

/RA/

T. R. Tjader, Senior Reactor Engineer Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation

Enclosures:

1. Meeting Summary
2. Attendance List
3. Agenda
4. Risk Management Guidelines (RMG) Requests for Additional Information (RAIs)
5. RMG Comments
6. RMTS Guidelines cc w/encl: See attached page

PACKAGE: ML052730142, LETTER, ML052730152, ENCLOSURE 4: ML052730161, ENCLOSURE 5: ML052730165, ENCLOSURE 5: ML052730170 OFFICE TSS:IROB-A:DIPM SC:TSS:IROB-A:DIPM NAME TRTjader THBoyce DATE 10/03/2005 10/03/2005 cc via e-mail:

Mr. Tony Pietrangelo General Electric Nuclear Energy Nuclear Energy Institute Mr. Michael S. Kitlan, Jr.

Mr. Biff Bradley Duke Energy Corporation Nuclear Energy Institute Mr. Noel Clarkson Mr. Mike Schoppman Duke Energy Corporation Nuclear Energy Institute Mr. Donald Hoffman Mr. Alan Hackerott, Chairman EXCEL Services Corporation Omaha Public Power District Mr. Ted Book Mr. Jim Kenny Framatech-ANP Pennsylvania Power & Light Company Mr. R. J. Schomaker Mr. James Andrachek Framatech-ANP Westinghouse Electric Company Mr. J. E. Rhoads Mr. Jack Stringfellow Energy Northwest Southern Nuclear Operating Company Ms. Deann Raleigh Mr. Ray Schneider Scientech Westinghouse Mr. Ken Canavan Mr. John Gaertner DS&S EPRI Mr. Steven Dolly Mr. Frank Rahn Platts EPRI Mr. Gabe Salamon Mr. Wayne Harrison PSEG Nuclear STP Mr. Courtney Smyth Mr. Drew Richards PSEG Nuclear LLC STP Mr. Jerry Andre Mr. Rick Grantom Westinghouse Electric Company STP Mr. David Helher Mr. Gary Chung Exelon SCE-SONGS Mr. Eugene Kelly Mr. Glenn Stewart Exelon Exelon Mr. James Liming Mr. Phil Tarpinian ABSG Exelon Mr. Stanley Levinson Ms. Nancy Chapman Framatone ANP SERCH/Bechtel Mr. Rick Hill

SUMMARY

OF THE SEPTEMBER 21, 2005 MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI), ELECTRIC POWER RESEARCH INSTITUTE (EPRI) AND INDUSTRY REPRESENTATIVES ON RISK MANAGEMENT TECHNICAL SPECIFICATIONS GUIDELINES FOR INITIATIVE 4b The NRC staff met with Industry representatives on September 21, 2005, from 9:00 a.m. to 12:30 p.m. The meeting attendees are listed in Enclosure 2.

The agenda (Enclosure 3) consisted of major discussion topics/requests for additional information (RAIs) (Enclosure 4) and related comments (Enclosure 5) to the latest version of the Industrys proposed Risk Management Technical Specifications (RMTS) Guidelines (Enclosure 6) for RMTS Initiative 4b, Risk-Informed Completion Times.

Major topics of discussion and areas needing enhancement in the RMTS Guidance (RMG) document are:

- The RMG should be restructured to provide requirements that can be invoked by the Administrative Controls Section of the technical specifications (TS). To the extent possible the RMG should be procedure like and utilize imperative directives such as shall. Reducing redundancy, maintaining consistency and simplifying the RMG should be a goal in restructuring. It is not deemed necessary to make the RMG document a Regulatory Guide since it will be referenced explicitly in the TS.

- It should be clear that the cause of an ICDP increase above 10 -6 and an approach to the limit of 10-5 is due to emergent conditions and not a routine planned increase. Guidance is needed on the accumulation of risk, to avoid exceeding the 10 -5 limit. Guidance should be included on the periodic evaluation of the accumulation of risk, and the consideration of actions to improve the implementation of RICTs. A member of the staff proposed that a possible means controlling aggregate risk would be to add a goal to the Administrative Controls Section of the TS to keep the accumulation of risk as low as reasonably achievable.

- The discussion of Common Cause Failure (CCF) needs to be enhanced by including specific actions, considerations and examples.

- The discussion of TS Operability versus PRA functionality needs to be enhanced by including specific considerations and examples.

- A thorough discussion is needed of the application of a RICT, with examples provided of various scenarios; how the actions associated with a RICT are entered and exited.

- It must be clear that every use of a RICT requires documentation of the associated risk assessment.

- The RMG should thoroughly discuss the use of qualitative and bounding assessments; e.g., how risk concerns can be qualitatively ruled out, and how quantitatively risk concerns can be bounded.

Enclosure 1

- Consideration of applying a Safety Function Determination Program test, such as that provided in the Standard TS, to LCO 3.0.3 entries to determine if it is acceptable to utilize a RICT; it is not acceptable to use a RICT for an LCO 3.0.3 entry required by a bonafide loss-of-funtion. It is recognized that RICTs can be used with the actions to restore equipment to Operable status that have been created through RMTS Initiative 6.

- The processes described in the STP and CE pilot plant proposals must be consistent with the RMG.

The intent is to meet again soon after a revised RMG document is developed and provided for review.

NRC/INDUSTRY MEETING ON THE RISK MANAGEMENT GUIDELINES FOR RMTS INITIATIVE 4b ATTENDANCE LIST SEPTEMBER 21, 2005 NAME AFFILIATION BIFF BRADLEY NUCLEAR ENERGY INSTITUTE JOHN GAERTNER EPRI RICK GRANTOM STP NOC WAYNE HARRISON STP NOC BILL STILLWELL STP NOC DREW RICHARDS STP NOC ALAN HACKEROTT OPPD RAY SCHNEIDER WESTINGHOUSE PSA JAMES LIMING ABSG PAT HILAND NRC/NRR/DIPM/IROB TOM BOYCE NRC/NRR/DIPM/IROB/TSS BOB TJADER NRC/NRR/DIPM/IROB/TSS DAVID ROTH NRC/NRR/DIPM/IROB/TSS SARA BERNAL NRC/NRR/DIPM/IROB/TSS MARK REINHART NRC/NRR/DSSA/SPSB ANDREW HOWE NRC/NRR/DSSA/SPSB JIM VAIL NRC/NRR/DSSA/SPSB NANCY SALGADO NRC/NRR/DSSA/SPSB DAVID SHUM NRC/NRR/DSSA/SPLB STEPHEN ALEXANDER NRC/NRR/DIPM/IPSB HUKAM GARG NRC/NRR/DE/EEIB MIKE SNODDERLY NRC/ACRS Enclosure 2

AGENDA RISK MANAGEMENT TECHNICAL SPECIFICATIONS INITIATIVE 4b, RISK-INFORMED COMPLETION TIMES RISK MANAGEMENT GUIDANCE DOCUMENT C Risk Management Guidance (RMG) Document Comment Overview B Improving: content largely there, needs change in emphasis to support Tech Specs B Re-structure to support Tech Spec Requirements (e.g., procedure-like)

- State shall requirements, followed by implementation guidance B Larger Scope Deficiencies

- RICT Threshold of 10-5 ICDP seems high (see RAI comments 43, 13)

Implications for control of aggregate risk (e.g., ALARA concept)

- Tech Spec Operability vs PRA Functionality, (see RAI comment 19) needs to be addressed more fully in Guidance

- CCF needs to be addressed more fully in Guidance (see RAI comment 1)

- Use of Qualitative and Bounding Assessments, used to support RICTs, needs to be addressed more fully in Guidance (see RAI comment 20)

- Simplify RMG, (see RAI comment 42)

B Detailed Deficiencies (see other RAI comments); a few are mentioned below:

- Correct Flow Chart

- Every use of a RICT requires documentation

- Correct means of calculating RICT (see RAI comment 46)

- Address PRA/CRMP maintenance/updates (see RAI comment 47)

- Consistency needed: for example, RICT & TS 3.0.3 applications, uncertainty C Pilots shall be consistent with RMG C Schedule/Process C Closing Comments Enclosure 3