ML072420543: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Enlergy Nuclear Operations, inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d) U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report | {{#Wiki_filter:Enlergy Nuclear Operations, inc. | ||
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d) | |||
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007. | In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007. | ||
Enclosures 1 and 2 summarize the test results at the PNP. Summary of Commitments This letter contains no new commitments and no revisions to existing commitments. | Enclosures 1 and 2 summarize the test results at the PNP. | ||
Site Vice President Palisades Nuclear Plant Enclosures (2) CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE | Summary of Commitments This letter contains no new commitments and no revisions to existing commitments. | ||
Site Vice President Palisades Nuclear Plant Enclosures (2) | |||
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC | |||
ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE | |||
==SUMMARY== | ==SUMMARY== | ||
January "1thougk June 30,2007 1. MANAGEMENT | January "1thougk June 30,2007 | ||
: 1. MANAGEMENT | |||
==SUMMARY== | ==SUMMARY== | ||
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results: Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results. 9 1 Random testing identified no positive drug/alcohol results. The percentage of random tests conducted during this period was 55%. The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors: | A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results: | ||
Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results. | |||
9 1 Random testing identified no positive drug/alcohol results. | |||
The percentage of random tests conducted during this period was 55%. | |||
The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors: | |||
Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results. | Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results. | ||
Page 1 of 2 C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative. D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing. | Page 1 of 2 | ||
C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative. | |||
D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing. | |||
E. APPEALS The appeals process was not initiated during this reporting period | E. APPEALS The appeals process was not initiated during this reporting period | ||
: 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73. Page 2 of 2 ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. | : 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73. | ||
FITNESS FOR DUTY PROGRAM PERFORMANCE | Page 2 of 2 | ||
ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc. | |||
Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode) | Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode) | ||
Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1 Cocaine 300 / 150 Phencyclidine 25 / 25 1 Opiates 300 / 300 Alcohol (% BAC)* 0.04 / 0.04 1 "Anv detectable amount for situations other than random. | Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1 | ||
Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post- Accident Observed Behavior #Tested 36 0 1 153 20 0 21 0 Random Follow-UP Other TOTAL #Positive 0 0 0 0 0 0 0 Long-Term Contractor Personnel N/A #Tested | Cocaine 300 / 150 Phencyclidine 25 / 25 1 | ||
Opiates 300 / 300 Alcohol (% BAC)* | |||
0.04 / 0.04 1 | |||
"Anv detectable amount for situations other than random. | |||
Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post-Accident Observed Behavior | |||
#Tested 36 0 | |||
1 153 20 0 | |||
21 0 Random Follow-UP Other TOTAL | |||
#Positive 0 | |||
0 0 | |||
0 0 | |||
0 0 | |||
Long-Term Contractor Personnel N/A | |||
#Tested Short-Term Contractor Personnel 348 | |||
#Positive | |||
#Tested 247 0 | |||
0 9 1 14 0 | |||
352 | |||
#Positive 1 | |||
0 0 | |||
0 0 | |||
0 1 | |||
Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana Cocaine 1 | |||
1 Opiates Amphe-tamines Phency-clidine Alcohol Refusal to Test 1 | |||
2 I I 3 | |||
4 5}} | |||
Latest revision as of 22:12, 14 January 2025
| ML072420543 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/23/2007 |
| From: | Schwarz C Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML072420543 (5) | |
Text
Enlergy Nuclear Operations, inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Mi 49043 August 23,2007 10 CFR 26.71 (d)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness for Dutv Pro~ram Performance Report
Dear Sir or Madam:
In accordance with 10 CFR 26.71 (d), Entergy Nuclear Operations, Inc, is providing the Fitness for Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of January 1, 2007, through June 30, 2007.
Enclosures 1 and 2 summarize the test results at the PNP.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Site Vice President Palisades Nuclear Plant Enclosures (2)
CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ENCLOSURE 1 PALBSADESNUCLEARPLANT SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE
SUMMARY
January "1thougk June 30,2007
- 1. MANAGEMENT
SUMMARY
A. RANDOM TESTING During this reporting period, a total of 244 random tests were conducted with the following results:
Donor Group Random Tests Results Employees Contractors 153 Random testing identified no positive drug/alcohol results.
9 1 Random testing identified no positive drug/alcohol results.
The percentage of random tests conducted during this period was 55%.
The positive drug/alcohol rate for 2007 indicates a stable trend for employees and contractors:
Random Tests Positive Rate Leading Substance Emplovees C/V1s Emplovees C/V1s Cocaine THC B. PRE-ACCESS TESTING A total of 283 pre-access tests were conducted during this reporting period. One individual was denied access based on positive test results.
Page 1 of 2
C. FOR CAUSEIPOST-ACCIDENT TESTING One for-cause test was required during the reporting period. The test was given because of observed behavior. The results of the test were negative.
D. FOLLOW-UP TESTING No individuals tested positive during "follow-up" testing.
E. APPEALS The appeals process was not initiated during this reporting period
- 2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant encountered no Fitness for Duty events that required reporting in accordance with 10 CFR 26.73.
Page 2 of 2
ENCLOSURE 2 PALlSABESNUCLEARPLANT SEMI-ANNUAL. FITNESS FOR DUTY PROGRAM PERFORMANCE D N A January "1tkrough June 30,2007 Entergy Nuclear Operations, Inc.
Company Palisades Nuclear Plant Location Brian Rabideau Contact Name June 30.2007 6 Months Ending 269-764-2575 Phone (include Areacode)
Cutoffs: Screen/Confirmation (nglml) : Appendix A to 10 CFR 26 Marijuana 100 / 15 Amphetamines 1000 / 500 1
Cocaine 300 / 150 Phencyclidine 25 / 25 1
Opiates 300 / 300 Alcohol (% BAC)*
0.04 / 0.04 1
"Anv detectable amount for situations other than random.
Page 1 of 2 Testing Results Average Number With Unescorted Access Categories Pre-Access FOR CAUSE Licensee Employees 541 Post-Accident Observed Behavior
- Tested 36 0
1 153 20 0
21 0 Random Follow-UP Other TOTAL
- Positive 0
0 0
0 0
0 0
Long-Term Contractor Personnel N/A
- Tested Short-Term Contractor Personnel 348
- Positive
- Tested 247 0
0 9 1 14 0
352
- Positive 1
0 0
0 0
0 1
Breakdown of Confirmed Positive Tests for Specific Substances Page 2 of 2 Licensee Employees Long-Term Contractors Short-Term Contractors Total Marijuana Cocaine 1
1 Opiates Amphe-tamines Phency-clidine Alcohol Refusal to Test 1
2 I I 3
4 5