ML19141A398: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 | {{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility: | ||
Weeks of | Quad Cities Nuclear Power Station Date of Examination: | ||
: Facility | Weeks of 7/16/18 and 7/23/18 Developed by: Written: Facility NRC // Operating: Facility NRC Target Date* | ||
Chief | Task Description (Reference) | ||
-b). For NRC | Chief Examiners Initials 11/17/17 | ||
-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). DWR 12/15/17 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). | : 1. | ||
DWR 12/15/17 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the | Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). | ||
-401, D.1.b). | DWR 12/15/17 | ||
N/A 12/15/17 4. Reference material due for NRC | : 2. | ||
-prepared exams (C.1.e; C.3.c; Attachment 3). DWR 12/15/17 5. Corporate notification letter sent (C.2.e). | NRC examiners and facility contact assigned (C.1.d; C.2.f). | ||
DWR 12/11/17 6.a NRC-developed written examination outline (ES | DWR 12/15/17 | ||
-401-1/2 or ES-401N-1/2 and ES | : 3. | ||
-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e | Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b). | ||
-f; C.2.h; C.3.d | N/A 12/15/17 | ||
-e). DWR | : 4. | ||
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable | Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). | ||
, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e). DWR 03/19/18 8. Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC [on-site visit] (C.2.h; C.3.d-e). DWR 04/27/18 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES | DWR 12/15/17 | ||
-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES | : 5. | ||
-401-3 or ES-401N-3); supporting documentation (including Forms ES | Corporate notification letter sent (C.2.e). | ||
-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES | DWR 12/11/17 6.a NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e). | ||
-201-2 and ES-201-3 updates); and reference materials due (C.1.e | DWR 12/29/17 6.b Facility feedback on the written examination outline due (C.1.f). | ||
-h; C.3.d). | DWR 02/19/18 | ||
N/A 04/27/18 05/07/18 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f | : 7. | ||
-g). DWR 05/11/18 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES | Operating test outline(s) and other checklists, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e). | ||
-202). DWR -NONE 05/25/18 06/01/18 12. Written exam and operating test reviews completed (C.3.f). | DWR 03/19/18 | ||
DWR 06/18/18 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k | : 8. | ||
-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. | Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC | ||
DWR 06/15/18 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES | [on-site visit] (C.2.h; C.3.d-e). | ||
-202). DWR | DWR 04/27/18 | ||
-202). DWR 07/06/18 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j | : 9. | ||
-k; C.3.h). | Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d). | ||
DWR 07/06/18 17. Request facility licensee management feedback on the examination (C.2.l). | N/A 04/27/18 05/07/18 | ||
DWR 07/06/18 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; | : 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g). | ||
-202, C.3.j; ES | DWR 05/11/18 | ||
-204). DWR 07/06/18 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). | : 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). | ||
DWR 07/06/18 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). | DWR -NONE 05/25/18 06/01/18 | ||
: 12. Written exam and operating test reviews completed (C.3.f). | |||
DWR 06/18/18 | |||
: 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week. | |||
DWR 06/15/18 | |||
: 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202). | |||
DWR 06/29/18 | |||
: 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202). | |||
DWR 07/06/18 | |||
: 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). | |||
DWR 07/06/18 | |||
: 17. Request facility licensee management feedback on the examination (C.2.l). | |||
DWR 07/06/18 | |||
: 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204). | |||
DWR 07/06/18 | |||
: 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). | |||
DWR 07/06/18 | |||
: 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). | |||
DWR | DWR | ||
* Target dates are based on facility | * Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.}} | ||
-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case | |||
-by-case basis in coordination with the facility licensee.}} | |||
Latest revision as of 02:21, 5 January 2025
| ML19141A398 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 05/21/2019 |
| From: | David Reeser Exelon Generation Co |
| To: | NRC/RGN-III/DRS/OLB |
| Shared Package | |
| ML17165A499 | List: |
| References | |
| Download: ML19141A398 (1) | |
Text
ES-201 Examination Preparation Checklist Form ES-201-1 Facility:
Quad Cities Nuclear Power Station Date of Examination:
Weeks of 7/16/18 and 7/23/18 Developed by: Written: Facility NRC // Operating: Facility NRC Target Date*
Task Description (Reference)
Chief Examiners Initials 11/17/17
- 1.
Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
DWR 12/15/17
- 2.
NRC examiners and facility contact assigned (C.1.d; C.2.f).
DWR 12/15/17
- 3.
Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
N/A 12/15/17
- 4.
Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
DWR 12/15/17
- 5.
Corporate notification letter sent (C.2.e).
DWR 12/11/17 6.a NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).
DWR 12/29/17 6.b Facility feedback on the written examination outline due (C.1.f).
DWR 02/19/18
- 7.
Operating test outline(s) and other checklists, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e).
DWR 03/19/18
- 8.
Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC
[on-site visit] (C.2.h; C.3.d-e).
DWR 04/27/18
- 9.
Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
N/A 04/27/18 05/07/18
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).
DWR 05/11/18
- 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
DWR -NONE 05/25/18 06/01/18
- 12. Written exam and operating test reviews completed (C.3.f).
DWR 06/18/18
- 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
DWR 06/15/18
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
DWR 06/29/18
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
DWR 07/06/18
- 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).
DWR 07/06/18
- 17. Request facility licensee management feedback on the examination (C.2.l).
DWR 07/06/18
- 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).
DWR 07/06/18
- 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
DWR 07/06/18
- 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
DWR
- Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.