ML19141A398: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1   Facility: Quad Cities Nuclear Power Station Date of Examination:
{{#Wiki_filter:ES-201 Examination Preparation Checklist Form ES-201-1 Facility:
Weeks of 7/16/18 and 7/23/18 Developed by: Written
Quad Cities Nuclear Power Station Date of Examination:
: Facility       NRC       //   Operating:   Facility       NRC     Target Date* Task Description (Reference)
Weeks of 7/16/18 and 7/23/18 Developed by: Written: Facility NRC // Operating: Facility NRC Target Date*
Chief Examiner's Initials 11/17/17 1. Examination administration date confirmed (C.1.a; C.2.a
Task Description (Reference)
-b). For NRC
Chief Examiners Initials 11/17/17
-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3). DWR 12/15/17 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
: 1.
DWR 12/15/17 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility's prescreening process (ES
Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
-401, D.1.b).
DWR 12/15/17
N/A 12/15/17 4. Reference material due for NRC
: 2.
-prepared exams (C.1.e; C.3.c; Attachment 3). DWR 12/15/17 5. Corporate notification letter sent (C.2.e).
NRC examiners and facility contact assigned (C.1.d; C.2.f).
DWR 12/11/17 6.a NRC-developed written examination outline (ES
DWR 12/15/17
-401-1/2 or ES-401N-1/2 and ES
: 3.
-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e
Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
-f; C.2.h; C.3.d
N/A 12/15/17
-e). DWR 12/29/17 6.b Facility feedback on the written examination outline due (C.1.f). DWR 02/19/18 7. Operating test outline(s) and other checklists, including Forms ES
: 4.
-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable
Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e). DWR 03/19/18 8. Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC [on-site visit] (C.2.h; C.3.d-e). DWR 04/27/18 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES
DWR 12/15/17
-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES
: 5.
-401-3 or ES-401N-3); supporting documentation (including Forms ES
Corporate notification letter sent (C.2.e).
-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES
DWR 12/11/17 6.a NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).
-201-2 and ES-201-3 updates); and reference materials due (C.1.e
DWR 12/29/17 6.b Facility feedback on the written examination outline due (C.1.f).
-h; C.3.d).
DWR 02/19/18
N/A 04/27/18 05/07/18 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f
: 7.
-g). DWR 05/11/18 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES
Operating test outline(s) and other checklists, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e).
-202). DWR -NONE 05/25/18 06/01/18 12. Written exam and operating test reviews completed (C.3.f).
DWR 03/19/18
DWR 06/18/18 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k
: 8.
-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC
DWR 06/15/18 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES
[on-site visit] (C.2.h; C.3.d-e).
-202). DWR 0 6/29/18 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES
DWR 04/27/18
-202). DWR 07/06/18 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j
: 9.
-k; C.3.h).
Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
DWR 07/06/18 17. Request facility licensee management feedback on the examination (C.2.l).
N/A 04/27/18 05/07/18
DWR 07/06/18 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; Attachment 5; ES
: 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).
-202, C.3.j; ES
DWR 05/11/18
-204). DWR 07/06/18 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
: 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
DWR 07/06/18 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
DWR -NONE 05/25/18 06/01/18
: 12. Written exam and operating test reviews completed (C.3.f).
DWR 06/18/18
: 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
DWR 06/15/18
: 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
DWR 06/29/18
: 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
DWR 07/06/18
: 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).
DWR 07/06/18
: 17. Request facility licensee management feedback on the examination (C.2.l).
DWR 07/06/18
: 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).
DWR 07/06/18
: 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
DWR 07/06/18
: 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
DWR
DWR
* Target dates are based on facility
* Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.}}
-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case
-by-case basis in coordination with the facility licensee.}}

Latest revision as of 02:21, 5 January 2025

2018 Quad Cities Nuclear Station Initial License Examination Prep Checklist ES-201-1
ML19141A398
Person / Time
Site: Quad Cities  
Issue date: 05/21/2019
From: David Reeser
Exelon Generation Co
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML17165A499 List:
References
Download: ML19141A398 (1)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility:

Quad Cities Nuclear Power Station Date of Examination:

Weeks of 7/16/18 and 7/23/18 Developed by: Written: Facility NRC // Operating: Facility NRC Target Date*

Task Description (Reference)

Chief Examiners Initials 11/17/17

1.

Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

DWR 12/15/17

2.

NRC examiners and facility contact assigned (C.1.d; C.2.f).

DWR 12/15/17

3.

Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).

N/A 12/15/17

4.

Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).

DWR 12/15/17

5.

Corporate notification letter sent (C.2.e).

DWR 12/11/17 6.a NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

DWR 12/29/17 6.b Facility feedback on the written examination outline due (C.1.f).

DWR 02/19/18

7.

Operating test outline(s) and other checklists, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable, sent to the facility contact for review and feedback (C.1.e-f; C.3.d-e).

DWR 03/19/18

8.

Operating test outline(s) reviewed with the facility licensee and feedback provided to the NRC

[on-site visit] (C.2.h; C.3.d-e).

DWR 04/27/18

9.

Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3); supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

N/A 04/27/18 05/07/18

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).

DWR 05/11/18

11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

DWR -NONE 05/25/18 06/01/18

12. Written exam and operating test reviews completed (C.3.f).

DWR 06/18/18

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.

DWR 06/15/18

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).

DWR 06/29/18

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).

DWR 07/06/18

16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

DWR 07/06/18

17. Request facility licensee management feedback on the examination (C.2.l).

DWR 07/06/18

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).

DWR 07/06/18

19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).

DWR 07/06/18

20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).

DWR

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.