ML092890341: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Dominion Resources Services, Inc.)(100 Dominion Boulevard, Glen Allen, VL\'3',t'-'\\"1.*\ddress: www.dom.comOctober15,2009U.S.NuclearRegulatoryCommissionAttention:DocumentControlDeskWashington,D.C.20555SerialNo.NLOS/RPCDocketNos.LicenseNos.
{{#Wiki_filter:Dominion Resources Services, Inc.
)(100 Dominion Boulevard, Glen Allen, VL\\ '3',t'-'
\\\\"1.*\\ddress: www.dom.com October 15, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.
NLOS/RPC Docket Nos.
License Nos.
09-654 RO 50-338 50-339 NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
09-654 RO 50-338 50-339 NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATIONUNITS1AND2 DRAFT SAFETY EVALUATION REPORT (SER)COMMENTS LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATEInaMarch26,2009letter(SerialNo.09-033),DominionrequestedamendmentstoOperatingLicensesNPF-4andNPF-7forNorthAnnaPowerStationUnits1and2,respectively.Thismeasurementuncertaintyrecapture(MUR)poweruprateLicenseAmendmentRequest(LAR)wouldincreaseeachunit'sratedthermalpower(RTP)levelfrom2893megawattsthermal(MWt)to2940MWtandmakeTechnical Specificationschangesasnecessarytosupportoperationattheupratedpowerlevel.Inaletterdated October9,2009,theNRCprovidedadraftSERforcommentsregardingthe proprietarycontentinthedraftSER.DominionhasreviewedthedraftSERandhas determinedthattheSERdoesnotcontainproprietaryinformation.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactMr.ThomasShaubat(804)273-2763.
NORTH ANNA POWER STATION UNITS 1 AND 2 DRAFT SAFETY EVALUATION REPORT (SER) COMMENTS LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE In a {{letter dated|date=March 26, 2009|text=March 26, 2009 letter}} (Serial No. 09-033), Dominion requested amendments to Operating Licenses NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. This measurement uncertainty recapture (MUR) power uprate License Amendment Request (LAR) would increase each unit's rated thermal power (RTP) level from 2893 megawatts thermal (MWt) to 2940 MWt and make Technical Specifications changes as necessary to support operation at the uprated power level. In a {{letter dated|date=October 9, 2009|text=letter dated October 9, 2009}}, the NRC provided a draft SER for comments regarding the proprietary content in the draft SER.
Sincerely,"¥>yz-C.L.FunderburkDirector,NuclearLicensingandOperationsSupport DominionResourcesServices,Inc.forVirginiaElectricandPowerCompany cc:U.S.Nuclear Regulatory Commission Region II Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303Mr.J.E.Reasor, Jr.Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.Suite 300 Glen Allen, Virginia 23060 State Health Commissioner Virginia DepartmentofHealth James Madison Building-7th Floor 109 Governor Street Suite 730 Richmond, Virginia 23219 NRC Senior Resident Inspector North Anna Power StationMs.K.R.Cotton NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorth Mail Stop16E15 11555 Rockville Pike Rockville, Maryland 20852Dr.V.Sreenivas NRC Project ManagerU.S.Nuclear Regulatory Commission One WhiteFlintNorthMaiI Stop8H4A 11555 Rockville Pike Rockville, Maryland 20852SerialNo.09-654DocketNos.50-338/339 Page 2 of 2}}
Dominion has reviewed the draft SER and has determined that the SER does not contain proprietary information.
If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.
Sincerely,
"¥>yz-C. L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
for Virginia Electric and Power Company
 
cc:
U.S. Nuclear Regulatory Commission Region II Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street Suite 730 Richmond, Virginia 23219 NRC Senior Resident Inspector North Anna Power Station Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, Maryland 20852 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Serial No. 09-654 Docket Nos. 50-338/339 Page 2 of 2}}

Latest revision as of 08:52, 14 January 2025

Draft Safety Evaluation Report (SER) Comments License Amendment Request, Measurement Uncertainty Recapture Power Uprate
ML092890341
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/15/2009
From: Funderburk C
Dominion, Dominion Resources, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-654
Download: ML092890341 (2)


Text

Dominion Resources Services, Inc.

)(100 Dominion Boulevard, Glen Allen, VL\\ '3',t'-'

\\\\"1.*\\ddress: www.dom.com October 15, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.

NLOS/RPC Docket Nos.

License Nos.09-654 RO 50-338 50-339 NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2 DRAFT SAFETY EVALUATION REPORT (SER) COMMENTS LICENSE AMENDMENT REQUEST MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE In a March 26, 2009 letter (Serial No.09-033), Dominion requested amendments to Operating Licenses NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. This measurement uncertainty recapture (MUR) power uprate License Amendment Request (LAR) would increase each unit's rated thermal power (RTP) level from 2893 megawatts thermal (MWt) to 2940 MWt and make Technical Specifications changes as necessary to support operation at the uprated power level. In a letter dated October 9, 2009, the NRC provided a draft SER for comments regarding the proprietary content in the draft SER.

Dominion has reviewed the draft SER and has determined that the SER does not contain proprietary information.

If you have any questions or require additional information, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerely,

"¥>yz-C. L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

for Virginia Electric and Power Company

cc:

U.S. Nuclear Regulatory Commission Region II Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 State Health Commissioner Virginia Department of Health James Madison Building - 7th Floor 109 Governor Street Suite 730 Richmond, Virginia 23219 NRC Senior Resident Inspector North Anna Power Station Ms. K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 16 E15 11555 Rockville Pike Rockville, Maryland 20852 Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North MaiI Stop 8 H4A 11555 Rockville Pike Rockville, Maryland 20852 Serial No.09-654 Docket Nos. 50-338/339 Page 2 of 2