ML093010327: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER  61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA  30303-8931
{{#Wiki_filter:UNITED STATES  
  October 28, 2009  
NUCLEAR REGULATORY COMMISSION  
  Mr. Tom E. Tynan  
REGION II  
Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  
SAM NUNN ATLANTA FEDERAL CENTER   
61 FORSYTH STREET, SW, SUITE 23T85  
ATLANTA, GEORGIA  30303-8931  
October 28, 2009  
Mr. Tom E. Tynan  
Vice President  
Southern Nuclear Operating Company, Inc.  
Vogtle Electric Generating Plant  
7821 River Road  
Waynesboro, GA 30830  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
Dear Mr. Tynan:
In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations
Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,
Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were
made for the administration of licensing examinations at Vogtle Electric Generating Plant.  The
operating test is scheduled to be administered during the week of February 22, 2010.  The
written examination is scheduled to be administered the week of March 1, 2010.  The on-site
preparatory week is scheduled for the week of January 25, 2010.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors."  The U.S. NRC regional office
will discuss with your staff any changes that might be necessary before the examinations are
administered.  Your staff has also agreed to make copies of all examination materials that are
necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 9, 2009.  Mr. Lea provided the written outline to members of your staff in
September 2009.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by January 8, 2010.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and
ready-to-use. 


  SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
SNC
Dear Mr. Tynan:
2
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
   
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date.  If the applications are not
received at least 30 days before the examination date, a postponement may be necessary. 
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget.  The public reporting burden for this collection of information is
estimated to average 500 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, writing the examinations, and completing and
reviewing the collection of information.  Send comments on any aspect of this collection of
information, including suggestions for reducing the burden, to the Information and Records
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management
and Budget, Washington, DC 20503.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).  


  In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea, Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were made for the administration of licensing examinations at Vogtle Electric Generating PlantThe
SNC
operating test is scheduled to be administered during the week of February 22, 2010. The written examination is scheduled to be administered the week of March 1, 2010. The on-site preparatory week is scheduled for the week of January 25, 2010.
3
  As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office
   
will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies
  To meet the above schedule, it will be necessary for your staff to furnish the operating test
and guidelines referenced in this letter.  If you have any questions regarding the NRC's
outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in September 2009. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before
examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,  
they are submitted to the NRC for review and approvalAll materials shall be complete and ready-to-use.   
(Internet E-mail:  edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:
SNC 2 We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
malcolm.widmann@nrc.gov).  
   
Sincerely,  
   
   
/RA/
   
   
   
   
   
   
   
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
cc: (See Page 4)
   


In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.


  This letter contains information collections that are subject to the Paperwork Reduction Act of
_________________________
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions,
   
gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,
X  SUNSI REVIEW COMPLETE  MTW
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
OFFICE
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
RII:DRS
SNC 3 Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567, (Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:
RII:DRS
malcolm.widmann@nrc.gov).
   
  Sincerely,        /RA/       Malcolm T. Widmann, Chief      Operations Branch      Division of Reactor Safety
   
  Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
   
  cc: (See Page 4)
   
    
SIGNATURE
EXL /RA/  
MTW /RA/  
   
   
NAME
ELea
MWidmann
   
   
   
   
DATE
10/28/2009
10/28/2009
   
   
   
   
E-MAIL COPY?
    YES
NO   YES
NO  YES
NO  YES
NO  YES
NO  YES
NO  YES
NO


_________________________  X  SUNSI REVIEW COMPLETE  MTW OFFICE RII:DRS RII:DRS      SIGNATURE EXL /RA/ MTW /RA/      NAME ELea MWidmann      DATE 10/28/2009 10/28/2009      E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO 
SNC
SNC 4  cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc.  
4  
   
cc w/encl:  
Angela Thornhill  
Managing Attorney and Compliance Officer  
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
N. J. Stringfellow
Manager
Licensing
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Jeffrey T. Gasser
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. Mike Stinson
Vice President
Fleet Operations Support
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Michael A. MacFarlane
Southern Nuclear Operating Company, Inc.  
40 Inverness Center Parkway
P.O. Box 1295
Birmingham, AL  35201-1295
Paula Marino
Vice President
Engineering
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Bob Masse
Resident Manager
Vogtle Electric Generating Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Office of the Attorney General
Electronic Mail Distribution
Lee Foley
Manager of Contracts Generation
Oglethorpe Power Corporation
Electronic Mail Distribution
Mr. N. Holcomb
Commissioner
Department of Natural Resources
Electronic Mail Distribution
Dr. Carol Couch
Director
Environmental Protection
Department of Natural Resources
Electronic Mail Distribution
Cynthia Sanders
Program Manager
Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution  
Electronic Mail Distribution  
  N. J. Stringfellow Manager Licensing
   
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Jim Sommerville
  Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
(Acting) Chief
 
Environmental Protection Division
L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.  
Department of Natural Resources
Electronic Mail Distribution  
   
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution  
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution  
Electronic Mail Distribution  
Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway
P.O. Box 1295 Birmingham, AL  35201-1295
Paula Marino Vice President
Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Bob Masse
Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution
Moanica Caston Vice President and General Counsel
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Office of the Attorney General Electronic Mail Distribution
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution
Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution
   
   
Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution
Office of the County Commissioner
 
Burke County Commission
Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources
Electronic Mail Distribution  
Electronic Mail Distribution  
  Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia
   
Arthur H. Domby, Esq.  
Troutman Sanders
Electronic Mail Distribution  
Electronic Mail Distribution  
  Mr. Reece McAlister Executive Secretary Georgia Public Service Commission
   
(cc continued next page)
 
SNC
5
cc continued
Director
Consumers' Utility Counsel Division
Govenor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA  30334-4600
Susan E. Jenkins
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution  
Electronic Mail Distribution  
Office of the County Commissioner Burke County Commission Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution
(cc continued next page)
   
   
 
Richard D. Brigdon
SNC 5  cc continued
Plant Training and
Director Consumers' Utility Counsel Division
Emergency Preparedness Manager
Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA  30334-4600
Southern Nuclear Operating Company, Inc.  
Electronic Mail Distribution
   
   
Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
   
   
Richard D. Brigdon Plant Training and Emergency Preparedness Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution


 
SNC
SNC 6  Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009  
6  
  SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301  
   
  Distribution w/encl
Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009  
: C. Evans, RII  L. Slack, RII  OE Mail   
   
RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301  
   
Distribution w/encl:
C. Evans, RII   
L. Slack, RII   
OE Mail   
RIDSNRRDIRS  
PUBLIC  
RidsNrrPMVogtle Resource
}}
}}

Latest revision as of 08:38, 14 January 2025

Notification of Licensed Operator Initial Examination 05000424/2010301 and 05000425/2010301
ML093010327
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/28/2009
From: Widmann M
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
50-424/10-301, 50-425/10-301
Download: ML093010327 (7)


See also: IR 05000424/2010301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

October 28, 2009

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Dear Mr. Tynan:

In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations

Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,

Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were

made for the administration of licensing examinations at Vogtle Electric Generating Plant. The

operating test is scheduled to be administered during the week of February 22, 2010. The

written examination is scheduled to be administered the week of March 1, 2010. The on-site

preparatory week is scheduled for the week of January 25, 2010.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office

will discuss with your staff any changes that might be necessary before the examinations are

administered. Your staff has also agreed to make copies of all examination materials that are

necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in

September 2009. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

SNC

2

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, writing the examinations, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management

and Budget, Washington, DC 20503.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

SNC

3

Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,

(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:

malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: (See Page 4)

_________________________

X SUNSI REVIEW COMPLETE MTW

OFFICE

RII:DRS

RII:DRS

SIGNATURE

EXL /RA/

MTW /RA/

NAME

ELea

MWidmann

DATE

10/28/2009

10/28/2009

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

SNC

4

cc w/encl:

Angela Thornhill

Managing Attorney and Compliance Officer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Manager

Licensing

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Jeffrey T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. Mike Stinson

Vice President

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Michael A. MacFarlane

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

P.O. Box 1295

Birmingham, AL 35201-1295

Paula Marino

Vice President

Engineering

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Bob Masse

Resident Manager

Vogtle Electric Generating Plant

Oglethorpe Power Corporation

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Office of the Attorney General

Electronic Mail Distribution

Lee Foley

Manager of Contracts Generation

Oglethorpe Power Corporation

Electronic Mail Distribution

Mr. N. Holcomb

Commissioner

Department of Natural Resources

Electronic Mail Distribution

Dr. Carol Couch

Director

Environmental Protection

Department of Natural Resources

Electronic Mail Distribution

Cynthia Sanders

Program Manager

Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Jim Sommerville

(Acting) Chief

Environmental Protection Division

Department of Natural Resources

Electronic Mail Distribution

Mr. Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. Reece McAlister

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution

Office of the County Commissioner

Burke County Commission

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distribution

(cc continued next page)

SNC

5

cc continued

Director

Consumers' Utility Counsel Division

Govenor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Susan E. Jenkins

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Richard D. Brigdon

Plant Training and

Emergency Preparedness Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

SNC

6

Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Distribution w/encl:

C. Evans, RII

L. Slack, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMVogtle Resource