ML18024A841: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18024A842
| number = ML18024A842
| issue date = 06/06/1979
| issue date = 06/06/1979
| title = Forwards LER 79-009/03L-0
| title = LER 79-009/03L-0 on 790510:scram Accumulator Level Switch LS-2-85-34 for Control Rod Drivelines 58-39 & 58-19 Failed to Give Annunciation for High Accumulator Level.Caused by Switch Failure
| author name =  
| author name =  
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY

Latest revision as of 12:29, 6 March 2020

Forwards LER 79-009/03L-0
Date released: 09/27/2018 Download: ML18024A841


LER 79-009/03L-0 on 790510:scram Accumulator Level Switch LS-2-85-34 for Control Rod Drivelines 58-39 & 58-19 Failed to Give Annunciation for High Accumulator Level.Caused by Switch Failure
ML18024A842
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/06/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024A842 (4)
Forwards LER 79-009/03L-0
ML18024A840
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/06/1979
From: Fox H
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18024A840 (2)