ML18043A680: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
| number = ML18043A679
| number = ML18043A679
| issue date = 05/15/1979
| issue date = 05/15/1979
| title = Forwards LER 79-020/01T-0
| title = LER 79-020/01T-0 on 790501:restraints for Piping Between Power Conversion Sys Safety Injection Tanks B & D Not Adequate.Caused by Program Error Used by Consultant to Determine Hanger Placement
| author name =  
| author name =  
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),

Latest revision as of 04:34, 6 March 2020

Forwards LER 79-020/01T-0
Date released: 10/31/2018 Download: ML18043A680


Forwards LER 79-020/01T-0
ML18155A248
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/15/1979
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18155A248 (1)
LER 79-020/01T-0 on 790501:restraints for Piping Between Power Conversion Sys Safety Injection Tanks B & D Not Adequate.Caused by Program Error Used by Consultant to Determine Hanger Placement
ML18043A679
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/15/1979
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML18043A679 (1)