ML18043A680: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 21: | Line 21: | ||
| number = ML18043A679 | | number = ML18043A679 | ||
| issue date = 05/15/1979 | | issue date = 05/15/1979 | ||
| title = | | title = LER 79-020/01T-0 on 790501:restraints for Piping Between Power Conversion Sys Safety Injection Tanks B & D Not Adequate.Caused by Program Error Used by Consultant to Determine Hanger Placement | ||
| author name = | | author name = | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), |
Latest revision as of 04:34, 6 March 2020
Date released: 10/31/2018 | Download: ML18043A680 |
---|---|
ML18155A248 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 05/15/1979 |
From: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | KEPPLER J G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML18155A248 (1) | |
ML18043A679 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 05/15/1979 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
Download: ML18043A679 (1) | |