ML16333A426: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:November 28, 2016  
{{#Wiki_filter:November 28, 2016  
   
   
   
   
Line 24: Line 23:
   
   
Mr. Dennis Koehl  
Mr. Dennis Koehl  
President and Chief Executive Officer  
President and Chief Executive Officer  
STP Nuclear Operating Company  
STP Nuclear Operating Company  
P.O. Box 289  
P.O. Box 289  
Wadsworth, TX  77483  
Wadsworth, TX  77483  
   
   
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION  OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301  
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION   
 
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301  
AND 05000499/2017301  
AND 05000499/2017301  
   
   
Dear Mr. Koehl:  
Dear Mr. Koehl:  
   
   
In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for  
In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for  
this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the  
this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the  
administration of licensing examinations at Sout
administration of licensing examinations at South Texas Project Electric Generating Station,  
h Texas Project Electric Generating Station, Units 1 and 2, during the weeks of September 25 and October 9, 2017.  
Units 1 and 2, during the weeks of September 25 and October 9, 2017.  
 
   
   
As agreed during the telephone conversation, your
As agreed during the telephone conversation, your staff will prepare the examinations based on  
staff will prepare the examinations based on  
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power  
the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power  
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power  
 
Plant Operators, Revision 2, Supplement 1.  The NRCs regional office will discuss with your  
Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power  
staff any changes that might be necessary before the examinations are administered.  
 
Plant Operators," Revision 2, Supplement 1.  The NRC's regional office will discuss with your  
 
staff any changes that might be necessary bef
ore the examinations are administered.  
   
   
To meet the above schedule, it will be necessary  
To meet the above schedule, it will be necessary for your staff to furnish the examination  
for your staff to furnish the examination  
outlines by June 26, 2017.  The written examination, operating tests, and supporting reference  
outlines by June 26, 2017.  The written examination, operating tests, and supporting reference  
materials identified in Attachment 3 to ES-201 will be due by July 24, 2017.  Pursuant to Title  
materials identified in Attachment 3 to ES-201 will be due by July 24, 2017.  Pursuant to Title  
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
 
representative of the facility licensee shall approve the outlines, examinations, and tests before  
representative of the facility licensee shall appr
ove the outlines, examinations, and tests before  
they are submitted to the NRC for review and approval.  All materials shall be complete and  
they are submitted to the NRC for review and approval.  All materials shall be complete and  
 
ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards  
ready-to-use.  We request that any personal, pr
oprietary, sensitive unclassified, or safeguards  
information in your response be contained in a separate enclosure and appropriately marked.   
information in your response be contained in a separate enclosure and appropriately marked.   
Any delay in receiving the required examinations and reference materials, or the submittal of  
Any delay in receiving the required examinations and reference materials, or the submittal of  
inadequate or incomplete materials, may cause the examinations to be rescheduled.  
inadequate or incomplete materials, may cause the examinations to be rescheduled.  
   
   
In order to conduct the requested written examinations and operating tests, it will be necessary  
In order to conduct the requested written examinations and operating tests, it will be necessary  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
to make the simulation facility available on the dates noted above and for validation the week of  
to make the simulation facility available on the dates noted above and for validation the week of  
August 14, 2017.  In addition, Appendix E to NUREG-1021 contains a number of NRC policies  
August 14, 2017.  In addition, Appendix E to NUREG-1021 contains a number of NRC policies  
and guidelines that will be in effect while the written examination is being administered.
and guidelines that will be in effect while the written examination is being administered.
UNITED STATES
UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.  
NUCLEAR REGULATORY COMMISSION  
ARLINGTON, TX  76011-4511
REGION IV  
 
1600 E. LAMAR BLVD.  
D. Koehl - 2 -  
ARLINGTON, TX  76011-4511  
 
D. Koehl  
- 2 -  
   
   
To permit timely NRC review and evaluation, your
To permit timely NRC review and evaluation, your staff should submit preliminary operator  
staff should submit preliminary operator  
license applications (Office of Management and Budget (OMB) approval number 3150-0090),  
license applications (Office of Management
medical certifications (OMB approval number 3150-0024), and waiver requests (if any)  
and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval  
(OMB approval number 3150-0090) by August 21, 2017.  Signed applications certifying that all  
number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) by August 21, 2017.  Signed applications certifying that all  
 
training has been completed should be submitted by September 11, 2017.  If the final signed  
training has been completed should be submitted by September 11, 2017.  If the final signed  
applications are not received by that date, a postponement may be necessary.   
applications are not received by that date, a postponement may be necessary.   
   
   
This letter contains information collections that are subject to the  
This letter contains information collections that are subject to the Paperwork Reduction Act of  
Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under  
approval number 3150-0018.  The public reporting burden for this collection of information is  
approval number 3150-0018.  The public reporting burden for this collection of information is  
estimated to average 50 hours per response, including the time for reviewing instructions,  
estimated to average 50 hours per response, including the time for reviewing instructions,  
gathering and maintaining the data needed, and completing and reviewing the collection of  
gathering and maintaining the data needed, and completing and reviewing the collection of  
information.  Send comments regarding this burden estimate or any other aspect of these  
information.  Send comments regarding this burden estimate or any other aspect of these  
information collections, including suggestions for reducing the burden, to the Records and  
information collections, including suggestions for reducing the burden, to the Records and  
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,  
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,  
DC 20555-0001, or by Internet electronic mail to  
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
INFOCOLLECTS@NRC.GOV.   The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
information collection, unless it displays a currently valid OMB control number.  
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of  
 
this letter and its enclosures will be available electronically for public inspection in the NRCs
this letter and its enclosures will be available electronically for public inspection in the NRC's
Public Document Room or from the Publicly Available Records (PARS) component of the NRCs
 
Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible  
Public Document Room or from the Publicly  
from the electronic Reading Room page of the NRCs public Web site at  
Available Records (PARS) component of the NRC's
http://www.nrc.gov/reading-rm/adams.html.
Agencywide Documents Access and Management Sy
   
stem (ADAMS).  ADAMS is accessible  
Thank you for your cooperation in this matter.  Mr. Hurley has been advised of the policies  
from the electronic Reading Room page of the NRC's public Web site at  
and guidelines referenced in this letter.  If you have any questions regarding the NRCs
 
http://www.nrc.gov/reading-rm/adams.html
. Thank you for your cooperation in this matter.  Mr. Hurley has been advised of the policies  
 
and guidelines referenced in this letter.  If you have any questions regarding the NRC's
 
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or  
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or  
myself at 817-200-1159.  
myself at 817-200-1159.  
   
   
  Sincerely,   
   
 
Sincerely,   
  /RA/  
  Vincent G. Gaddy, Chief  
  Operations Branch  
/RA/  
  Division of Reactor Safety  
   
 
Vincent G. Gaddy, Chief  
   
Operations Branch  
   
Division of Reactor Safety  
   
   
Docket Nos. 50-498 and 50-499  
Docket Nos. 50-498 and 50-499  
License Nos. NPF-76 and NPF-80  
License Nos. NPF-76 and NPF-80  
cc:  Electronic Distribution


D. Koehl
- 2 -
   
   
cc:  Electronic Distribution 
To permit timely NRC review and evaluation, your staff should submit preliminary operator  
D. Koehl - 2 -
license applications (Office of Management and Budget (OMB) approval number 3150-0090),  
medical certifications (OMB approval number 3150-0024), and waiver requests (if any)  
To permit timely NRC review and evaluation, your
(OMB approval number 3150-0090) by August 21, 2017.  Signed applications certifying that all  
staff should submit preliminary operator  
license applications (Office of Management
and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval  
number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) by August 21, 2017.  Signed applications certifying that all  
 
training has been completed should be submitted by September 11, 2017.  If the final signed  
training has been completed should be submitted by September 11, 2017.  If the final signed  
applications are not received by that date, a postponement may be necessary.   
applications are not received by that date, a postponement may be necessary.   
   
   
This letter contains information collections that are subject to the  
This letter contains information collections that are subject to the Paperwork Reduction Act of  
Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under  
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under  
approval number 3150-0018.  The public reporting burden for this collection of information is  
approval number 3150-0018.  The public reporting burden for this collection of information is  
estimated to average 50 hours per response, including the time for reviewing instructions,  
estimated to average 50 hours per response, including the time for reviewing instructions,  
gathering and maintaining the data needed, and completing and reviewing the collection of  
gathering and maintaining the data needed, and completing and reviewing the collection of  
information.  Send comments regarding this burden estimate or any other aspect of these  
information.  Send comments regarding this burden estimate or any other aspect of these  
information collections, including suggestions for reducing the burden, to the Records and  
information collections, including suggestions for reducing the burden, to the Records and  
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,  
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001, or by Internet electronic mail to  
Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
INFOCOLLECTS@NRC.GOV.   The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
information collection, unless it displays a currently valid OMB control number.  
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of  
 
this letter and its enclosures will be available electronically for public inspection in the NRCs
this letter and its enclosures will be available electronically for public inspection in the NRC's
Public Document Room or from the Publicly Available Records (PARS) component of the NRCs
 
Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible  
Public Document Room or from the Publicly  
from the electronic Reading Room page of the NRCs public Web site at  
Available Records (PARS) component of the NRC's
http://www.nrc.gov/reading-rm/adams.html.
Agencywide Documents Access and Management Sy
   
stem (ADAMS).  ADAMS is accessible  
Thank you for your cooperation in this matter.  Mr. Hurley has been advised of the policies  
from the electronic Reading Room page of the NRC's public Web site at  
and guidelines referenced in this letter.  If you have any questions regarding the NRCs
 
http://www.nrc.gov/reading-rm/adams.html
. Thank you for your cooperation in this matter.  Mr. Hurley has been advised of the policies  
 
and guidelines referenced in this letter.  If you have any questions regarding the NRC's
 
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or  
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or  
myself at 817-200-1159.  
myself at 817-200-1159.  
   
   
  Sincerely,   
   
 
Sincerely,   
  /RA/   Vincent G. Gaddy, Chief  
  Operations Branch  
  Division of Reactor Safety  
/RA/  
 
Vincent G. Gaddy, Chief  
   
Operations Branch  
   
Division of Reactor Safety  
   
   
Docket Nos. 50-498 and 50-499  
Docket Nos. 50-498 and 50-499  
License Nos. NPF-76 and NPF-80  
License Nos. NPF-76 and NPF-80  
   
   
cc: Electronic Distribution  
cc: Electronic Distribution  
 
Distribution:   
Distribution:   
See next page  
See next page  
ADAMS ACCESSION NUMBER:  ML16333A426  SUNSI Review By:  VGaddy
ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE SOE:OB C:OB      NAME KClayton VGaddy      SIGNATURE /RA/ /RA/      DATE 11/18/16 11/28/16     
Letter to Dennis Koehl from Vincent G. Gaddy, dated November 28, 2016
   
   
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301
ADAMS ACCESSION NUMBER: ML16333A426
SUNSI Review
By:  VGaddy
ADAMS
Yes    No
Publicly Available
Non-Publicly Available
  Non-Sensitive
Sensitive
Keyword:
NRC-002
OFFICE
SOE:OB
C:OB
NAME
KClayton
VGaddy
SIGNATURE
/RA/
/RA/
DATE
11/18/16
11/28/16


Letter to Dennis Koehl from Vincent G. Gaddy, dated November 28, 2016
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION 
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301
AND 05000499/2017301  
AND 05000499/2017301  
   
   
Electronic Distribution by RIV:  
Electronic Distribution by RIV:  
Regional Administrator (Kriss.Kennedy@nrc.gov)  
Regional Administrator (Kriss.Kennedy@nrc.gov)  
Deputy Regional Administrator (Scott.Morris@nrc.gov)  
Deputy Regional Administrator (Scott.Morris@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)   
DRS Deputy Director (Jeff.Clark@nrc.gov)   
Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov)  
Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov)  
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)  
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)  
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
Project Engineer, DRP/B (Jim.Melfi@nrc.gov)  
Project Engineer, DRP/B (Jim.Melfi@nrc.gov)  
STP Administrative Assistant (Lynn.Wright@nrc.gov)  
STP Administrative Assistant (Lynn.Wright@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Project Manager (Lisa.Regner@nrc.gov)  
Project Manager (Lisa.Regner@nrc.gov)  
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)  
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)  
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)  
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)  
RIV RSLO (Bill.Maier@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
}}
}}

Latest revision as of 18:57, 9 January 2025

Notification of NRC Initial Operator Licensing Examination 05000498/2017301 and 05000499/2017301
ML16333A426
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/28/2016
From: Vincent Gaddy
Operations Branch IV
To: Koehl D
South Texas
References
IR 2017301
Download: ML16333A426 (4)


See also: IR 05000498/2017301

Text

November 28, 2016

Mr. Dennis Koehl

President and Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION

OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301

AND 05000499/2017301

Dear Mr. Koehl:

In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for

this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the

administration of licensing examinations at South Texas Project Electric Generating Station,

Units 1 and 2, during the weeks of September 25 and October 9, 2017.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power

Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your

staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by June 26, 2017. The written examination, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by July 24, 2017. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above and for validation the week of

August 14, 2017. In addition, Appendix E to NUREG-1021 contains a number of NRC policies

and guidelines that will be in effect while the written examination is being administered.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

D. Koehl

- 2 -

To permit timely NRC review and evaluation, your staff should submit preliminary operator

license applications (Office of Management and Budget (OMB) approval number 3150-0090),

medical certifications (OMB approval number 3150-0024), and waiver requests (if any)

(OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all

training has been completed should be submitted by September 11, 2017. If the final signed

applications are not received by that date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosures will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the electronic Reading Room page of the NRCs public Web site at

http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or

myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

cc: Electronic Distribution

D. Koehl

- 2 -

To permit timely NRC review and evaluation, your staff should submit preliminary operator

license applications (Office of Management and Budget (OMB) approval number 3150-0090),

medical certifications (OMB approval number 3150-0024), and waiver requests (if any)

(OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all

training has been completed should be submitted by September 11, 2017. If the final signed

applications are not received by that date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosures will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the electronic Reading Room page of the NRCs public Web site at

http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or

myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

cc: Electronic Distribution

Distribution:

See next page

ADAMS ACCESSION NUMBER: ML16333A426

SUNSI Review

By: VGaddy

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

SOE:OB

C:OB

NAME

KClayton

VGaddy

SIGNATURE

/RA/

/RA/

DATE

11/18/16

11/28/16

Letter to Dennis Koehl from Vincent G. Gaddy, dated November 28, 2016

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION

OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301

AND 05000499/2017301

Electronic Distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Project Engineer, DRP/B (Jim.Melfi@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)