ML18155A609: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* | {{#Wiki_filter:Reactor Oversight Process | ||
* Resident Inspectors and Regional Specialist | |||
* Inspection Planning and Assessment | |||
* Inspection Techniques | |||
* Communication with the Licensee | |||
* Best Practices and Challenges | |||
Reactor Oversight Process | |||
*RIGID but Flexible | |||
Role of the Resident Inspector | |||
* Event Response | |||
* Inspection | |||
* Assessment | |||
* Communication | |||
Resident Inspectors | |||
* Eyes and Ears of the Agency | |||
* Overall Inspection Plan | |||
* Importance of Plant Status | |||
Resident Inspectors Overall Inspection Plan | |||
* Design and Licensing Basis | |||
* Outages and Site Changes | |||
* Risk Significant Areas | |||
Resident Inspectors Plant Status | |||
* Information Gathering | |||
* Field Presence | |||
* Interactions with Licensee | |||
Resident Inspectors Sample Selection | |||
* Risk Informed | |||
* Experience / Operating Experience A frog in a well does not know the great sea. | |||
* Site Challenges | |||
* Potential Challenges | |||
Inspection Implementation | |||
* Questioning Attitude | |||
* Field Observations | |||
* Preparation | |||
Inspection Implementation Best Practices | |||
* Always Inspecting | |||
* Going to the Source | |||
* Thorough Review | |||
Inspection Assessment | |||
* Process | |||
* Risk Assessment | |||
* Peer Input | |||
* Integrated | |||
Resident - Specialist Interface | |||
* Inspector followup issues and emergent items | |||
* Corrective action reviews | |||
* Design and team inspections | |||
Interaction with Licensees | |||
* Ongoing and Continuous | |||
* Transparent and Open | |||
* Separate but Approachable | |||
* Professional | |||
Questions}} |
Latest revision as of 21:23, 2 February 2020
ML18155A609 | |
Person / Time | |
---|---|
Issue date: | 06/04/2018 |
From: | Glenn Dentel Engineering Region 1 Branch 2 |
To: | |
Dentel G | |
References | |
Download: ML18155A609 (13) | |
Text
Reactor Oversight Process
- Resident Inspectors and Regional Specialist
- Inspection Planning and Assessment
- Inspection Techniques
- Communication with the Licensee
- Best Practices and Challenges
Reactor Oversight Process
- RIGID but Flexible
Role of the Resident Inspector
- Event Response
- Inspection
- Assessment
- Communication
Resident Inspectors
- Eyes and Ears of the Agency
- Overall Inspection Plan
- Importance of Plant Status
Resident Inspectors Overall Inspection Plan
- Design and Licensing Basis
- Outages and Site Changes
- Risk Significant Areas
Resident Inspectors Plant Status
- Information Gathering
- Field Presence
- Interactions with Licensee
Resident Inspectors Sample Selection
- Risk Informed
- Experience / Operating Experience A frog in a well does not know the great sea.
- Site Challenges
- Potential Challenges
Inspection Implementation
- Questioning Attitude
- Field Observations
- Preparation
Inspection Implementation Best Practices
- Always Inspecting
- Going to the Source
- Thorough Review
Inspection Assessment
- Process
- Risk Assessment
- Peer Input
- Integrated
Resident - Specialist Interface
- Inspector followup issues and emergent items
- Corrective action reviews
- Design and team inspections
Interaction with Licensees
- Ongoing and Continuous
- Transparent and Open
- Separate but Approachable
- Professional
Questions