ML18155A609: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:*RIGID
{{#Wiki_filter:Reactor Oversight Process
* Resident Inspectors and Regional Specialist
* Inspection Planning and Assessment
* Inspection Techniques
* Communication with the Licensee
* Best Practices and Challenges


"A frog in a well does not know the great sea."}}
Reactor Oversight Process
*RIGID but Flexible
 
Role of the Resident Inspector
* Event Response
* Inspection
* Assessment
* Communication
 
Resident Inspectors
* Eyes and Ears of the Agency
* Overall Inspection Plan
* Importance of Plant Status
 
Resident Inspectors Overall Inspection Plan
* Design and Licensing Basis
* Outages and Site Changes
* Risk Significant Areas
 
Resident Inspectors Plant Status
* Information Gathering
* Field Presence
* Interactions with Licensee
 
Resident Inspectors Sample Selection
* Risk Informed
* Experience / Operating Experience A frog in a well does not know the great sea.
* Site Challenges
* Potential Challenges
 
Inspection Implementation
* Questioning Attitude
* Field Observations
* Preparation
 
Inspection Implementation Best Practices
* Always Inspecting
* Going to the Source
* Thorough Review
 
Inspection Assessment
* Process
* Risk Assessment
* Peer Input
* Integrated
 
Resident - Specialist Interface
* Inspector followup issues and emergent items
* Corrective action reviews
* Design and team inspections
 
Interaction with Licensees
* Ongoing and Continuous
* Transparent and Open
* Separate but Approachable
* Professional
 
Questions}}

Latest revision as of 21:23, 2 February 2020

Japan ROP 2018 Framework Presentation
ML18155A609
Person / Time
Issue date: 06/04/2018
From: Glenn Dentel
Engineering Region 1 Branch 2
To:
Dentel G
References
Download: ML18155A609 (13)


Text

Reactor Oversight Process

  • Resident Inspectors and Regional Specialist
  • Inspection Planning and Assessment
  • Inspection Techniques
  • Communication with the Licensee
  • Best Practices and Challenges

Reactor Oversight Process

  • RIGID but Flexible

Role of the Resident Inspector

  • Event Response
  • Inspection
  • Assessment
  • Communication

Resident Inspectors

  • Eyes and Ears of the Agency
  • Overall Inspection Plan
  • Importance of Plant Status

Resident Inspectors Overall Inspection Plan

  • Design and Licensing Basis
  • Outages and Site Changes
  • Risk Significant Areas

Resident Inspectors Plant Status

  • Information Gathering
  • Field Presence
  • Interactions with Licensee

Resident Inspectors Sample Selection

  • Risk Informed
  • Experience / Operating Experience A frog in a well does not know the great sea.
  • Site Challenges
  • Potential Challenges

Inspection Implementation

  • Questioning Attitude
  • Field Observations
  • Preparation

Inspection Implementation Best Practices

  • Always Inspecting
  • Going to the Source
  • Thorough Review

Inspection Assessment

  • Process
  • Risk Assessment
  • Peer Input
  • Integrated

Resident - Specialist Interface

  • Inspector followup issues and emergent items
  • Corrective action reviews
  • Design and team inspections

Interaction with Licensees

  • Ongoing and Continuous
  • Transparent and Open
  • Separate but Approachable
  • Professional

Questions