{{#Wiki_filter:Emphasis on ROP Enhancement}}
{{#Wiki_filter:Reactor Oversight Process Monthly Public Meeting Emphasis on ROP Enhancement January 17, 2019 1
 
Agenda 8:30am Opening Remarks and Introductions    Margaret Doane, Ho Nieh, Chris Miller, Industry 9:00am  ROP Enhancement Introductory Remarks Russell Gibbs 9:15am  ROP Enhancement SDP area            Antonios Zoulis 10:15am ROP Enhancement Assessment area      Alex Garmoe 11:15am ROP Enhancement Inspection area      Eric Thomas 12:15pm Lunch 1:15pm  ROP Enhancement ISFSI area          Carla Roque-Cruz 1:30pm  ROP Enhancement MSPI area            Industry 2:00pm  Performance Indicator FAQs          Joylynn Quinones 2:15pm  Ongoing SDP Updates                  David Aird 2:30pm  Closing Remarks 2
 
ROP Enhancement Website https://www.nrc.gov/reactors/operating/oversight/rop-enhancement.html 3
 
SDP Infrastructure 4
 
5 SDP Infrastructure - Antonios Zoulis
#    Description 3B    Combine BDB into One SDP 3C    Stop Appendix M Revision 3D    Standardize PRA Inputs to SDP 3E    Develop Procedure to Align on PRA Inputs Early 3F    Develop NRC Interface for Licensee PRAs 3G    Eliminate Use of SPAR in SDP Staff 336 842 840 619 621 6
 
Assessment 7
 
8 9
Assessment - Alex Garmoe
#    Description 2A    Revise Public Communications on White Findings 2B    Revise the Structure of the Action Matrix 2B.1  Combine Columns 1 and 2 2B.2  Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.5  Promptly Close White Findings 2B.6  Redefine Finding Labels 4C    Open Up Communications about Inspection Results 4D    Standardize Issue Escalation Practices Staff  278 250 337 339 340 153 231 618 627 839 10
 
ROP Inspection 11
 
12 13 ROP Inspection - Eric Thomas
#    Description 1D    Reduce Baseline Hours for Higher Performers 1E    Remove PI&R Inspection from Baseline Program 1F    Refrain from Expanding Baseline Inspection Effort in Future 2B.2  Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.3  Redirect IP 95001: Change the IP 95001 from a stand-alone supplemental procedure for Whites to become a follow-up to Yellow or Red findings as an initial inspection 2B.4  Revise IP 71152 to be reactive Staff 624 583 617 078 375 622 428 186 266 203 14
 
Independent Spent Fuel Storage Installation (ISFSI) 15
 
16 ISFSI - Carla Roque-Cruz
#    Description 1H  Eliminate Materials Inspections of ISFSIs 17
 
Mitigating Systems Performance Index (MSPI) 18
 
19 MSPI - Alex Garmoe
#    Description 1G    Revise Use of Mitigating Systems Performance Index Staff 171 587 20
 
ROP Performance Indicator Program Frequently Asked Questions (FAQs)
Joylynn Quinones-Navarro 21
 
Ongoing SDP Updates David Aird 22
 
Next Steps and Closing Remarks 23
 
Radiation Protection 24
 
25 26 Radiation Protection - David Garmon
#    Description 1A  Revise RP Inspections 3A.1 Expand [EP SDP] Approach to All Deterministic SDPs 27
 
Security 28
 
29 30 Security - Alonzo Richardson
#    Description 1C  Revise Security Inspections 3A.1 Expand [EP SDP] Approach to All Deterministic SDPs 31
 
Licensing/Backfit 32
 
33 Licensing/Backfit - Tim Reed
#    Description 4A  Establish Policy to Respect Licensing Basis 4B  Establish Means of Resolving Very Low-Risk Licensing Basis Concerns 34
 
Emergency Preparedness 35
 
36 37 Emergency Preparedness - Don Johnson
#  Description 1B  Revise EP Inspections 3A  Revise EP SDP 38}}

Latest revision as of 06:37, 20 October 2019

Reactor Oversight Process Enhancement Public Meeting 01/17/2019
ML19018A128
Person / Time
Issue date: 01/18/2019
From: Mary Anderson
NRC/NRR/DIRS/IRGB
To:
Anderson M, 415-7126, NRR/DIRS
References
Download: ML19018A128 (38)


Text

Reactor Oversight Process Monthly Public Meeting Emphasis on ROP Enhancement January 17, 2019 1

Agenda 8:30am Opening Remarks and Introductions Margaret Doane, Ho Nieh, Chris Miller, Industry 9:00am ROP Enhancement Introductory Remarks Russell Gibbs 9:15am ROP Enhancement SDP area Antonios Zoulis 10:15am ROP Enhancement Assessment area Alex Garmoe 11:15am ROP Enhancement Inspection area Eric Thomas 12:15pm Lunch 1:15pm ROP Enhancement ISFSI area Carla Roque-Cruz 1:30pm ROP Enhancement MSPI area Industry 2:00pm Performance Indicator FAQs Joylynn Quinones 2:15pm Ongoing SDP Updates David Aird 2:30pm Closing Remarks 2

ROP Enhancement Website https://www.nrc.gov/reactors/operating/oversight/rop-enhancement.html 3

SDP Infrastructure 4

5 SDP Infrastructure - Antonios Zoulis

  1. Description 3B Combine BDB into One SDP 3C Stop Appendix M Revision 3D Standardize PRA Inputs to SDP 3E Develop Procedure to Align on PRA Inputs Early 3F Develop NRC Interface for Licensee PRAs 3G Eliminate Use of SPAR in SDP Staff 336 842 840 619 621 6

Assessment 7

8 9

Assessment - Alex Garmoe

  1. Description 2A Revise Public Communications on White Findings 2B Revise the Structure of the Action Matrix 2B.1 Combine Columns 1 and 2 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.5 Promptly Close White Findings 2B.6 Redefine Finding Labels 4C Open Up Communications about Inspection Results 4D Standardize Issue Escalation Practices Staff 278 250 337 339 340 153 231 618 627 839 10

ROP Inspection 11

12 13 ROP Inspection - Eric Thomas

  1. Description 1D Reduce Baseline Hours for Higher Performers 1E Remove PI&R Inspection from Baseline Program 1F Refrain from Expanding Baseline Inspection Effort in Future 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.3 Redirect IP 95001: Change the IP 95001 from a stand-alone supplemental procedure for Whites to become a follow-up to Yellow or Red findings as an initial inspection 2B.4 Revise IP 71152 to be reactive Staff 624 583 617 078 375 622 428 186 266 203 14

Independent Spent Fuel Storage Installation (ISFSI) 15

16 ISFSI - Carla Roque-Cruz

  1. Description 1H Eliminate Materials Inspections of ISFSIs 17

Mitigating Systems Performance Index (MSPI) 18

19 MSPI - Alex Garmoe

  1. Description 1G Revise Use of Mitigating Systems Performance Index Staff 171 587 20

ROP Performance Indicator Program Frequently Asked Questions (FAQs)

Joylynn Quinones-Navarro 21

Ongoing SDP Updates David Aird 22

Next Steps and Closing Remarks 23

Radiation Protection 24

25 26 Radiation Protection - David Garmon

  1. Description 1A Revise RP Inspections 3A.1 Expand [EP SDP] Approach to All Deterministic SDPs 27

Security 28

29 30 Security - Alonzo Richardson

  1. Description 1C Revise Security Inspections 3A.1 Expand [EP SDP] Approach to All Deterministic SDPs 31

Licensing/Backfit 32

33 Licensing/Backfit - Tim Reed

  1. Description 4A Establish Policy to Respect Licensing Basis 4B Establish Means of Resolving Very Low-Risk Licensing Basis Concerns 34

Emergency Preparedness 35

36 37 Emergency Preparedness - Don Johnson

  1. Description 1B Revise EP Inspections 3A Revise EP SDP 38